GAZETTE NOTICE NO. 3515
GAZETTE NOTICE NO. 3515
THE WATER ACT
EXTENSION
Under the powers granted under section 73 (1) and 73 (4) of the
Water Act, 2002, Tana Water Services Board, do give a one month notice from the date of this communication to all existing and potential customers of Murang'a Water and Sanitation Company that the structure of approved tariff for water services for the financial year
2016/17, 2017/18 to 2018/19 is as follows:
1.0 Water Tariff Structure for the period 2016/2017, 2017/2018 and 2018/2019.
Type of Customer Approved Justified Tariff
(KS/i/rn3)
Residential
Consumption Block (in-)
0-6 KSh.330 (Flat rate)
7-20 70
21-50 90
51-100 100
101-300 110
300 and above 135
Commercial/Industrial
Consumption Block(m3)
0-6 330 (Flat rate)
7-20 70
21-50 90
51-100 100
101-300 110
300 and above 135
Stand pipes/kiosks/ Schools 35
Schools
<600 70
601-1200 190
>1200 1100
Sewerage Tariff
Sewerage is charged as a percentage of the water billed for all customers with sewer connections
2016/17: 50% of water billed
2017/18: 60% of water billed
2018/19: 75% of water billed
Disconnected water accounts shall be charged based on the average of the last three months' sewer charges before the disconnection.
Customers with no water connection:
Individual Domestic Customers, flat rate of KSh. 300 per month
Commercial customers: percentage in (a) above of the volume of water used as per the metered source of water.
2.0 Miscellaneous Charges
2.1 Meter Rent per Month
Meter rent
Size (Inches) Approved (KS/i.)
V2 50
3/3 100
11/2 250
2 250
3 450
4 800
6 1250
>8 2,000
2.2 Deposit
Water Deposit
Connection Type Approved (KSh)
Domestic customer (single dwelling) 2,500
Retail shops, more than 10m3 3,500
Bar, more than 15m' 6,000
Hotel class "A" and "B" less than 150m3 12,000
Hotel class "C" and "D" more than 150m' 20,000
Hospitals more than 150mj 150m 20.000
Health Centre less than 150m3 12,000
Schools and other institutions mare than 200m3 20,000
Schools less than 200m3 10,000
Minor construction site more than 200m3 15,000
Major Construction Sites more than 300m3 50,000
Light industries less than 200m' 30,000
Medium industries between 200m3and 300m3 50,000
Heavy industries more than 200m' 100,000
Water Kiosks 5,000
2.3 Other Charges
Service Approved (KSh)
New Water Connection fee 12,500
Reconnection fee-at meter point 11,000
13th April, 2017 THE KENYA GAZETTE 1525
Service Approved (KS/i.)
Reconnection fee—at mains 5,000 and double deposit
Illegal connection—Commercial, 100,000 plus estimated
Industry, Constructibn(Fraud) consumption during the period of the illegality
30,000 plus estimated
Illegal connection (Fraud)—Domestic consumption during the period of the illegality
2,500
Tanke - 8,000 litres 5,000
- 16,000 litres Respectively per tanker within
- WSP area for all consumers.
Replacement of stolen or damaged 100% of the market cost of
3.0 Analysis of cost structure.
Service Approved (KS/i) meters the meter
Meter testing on request 100
Sewer connection-Residential 5,000
Sewer connection-Commercial 7,500
Sewer connection-Industrial 15,000
Private sewer unblocking 2,500
Leak detection services 1,000
Sewer Reconnection 15,000
Below is the summary of the cost structure that makes up the total cost incurred by MUWASCO.
Expenditure Item 201612017 (KS/i) 201712018 (KSh) 201812019 (KS/i)
Operations 102.29 108.16 112.70
Maintenance 17.03 17.88 18.78
Regulatory levy 1.99 2.27 2.51
WSB Administrative Fees 19.06 21.85 19.06
Minor investments 23.80 39.10 59.65
Loan Repayment 24.52 24.07 23.63
Total Costs 188.68 213.33 236.32
Projected Rev. (KSh.) 189 216 238
Total Costs Coverage (%) 100 101 101
4.0 Conditions attached to the tariff approval
ALL the parties concerned should further take note that the tariff was approved on condition that all the assumptions made in the tariff projections shall be monitored and MUWASCO shall be expected to meet the targets below:
Target 2016117 2017118 2018119
Water Coverage (%) 72 75 78
Water quality standards (%) 100% compliance with the quality standards
Non Revenue Water (%) 33 32 31
Hours of Supply (Hrs) 24 24 24
Staff per 1000 connections 8 7 5
Metering ratio (%) 100 100 100
Collection Efficiency (%) 95 95 95
Resale at Kiosk Regulate resale by kiosk vendors at KSh. 1 per 20-litres. Tariffs at kiosks must be displayed at strategic points for public awareness
Performance Evaluation: Performance targets to be met and ascertained by WASREB, at the end of the 1st year of the tariff period. Non achievement of the Set targets without justifiable cause shall lead to penalty.
Loan Repayment:
MUWASCO shall immediately establish a standing order with TWSB where it shall remit on a monthly basis, equal instalments loan repayments.
The annual cumulative loan repayment shall be as hereunder:
FY 16117 FY 17118 FY 18119
Annual cumulative loan repayment (Million KSh.) 24.52 24.07 23.63
Investments:
MUWASCO shall undertake the following investments during the tariff period 2016/2017
2016-2017 INVESTMENT PROJECTS
Project Area Size Description Unit Quantity Project Cost (KS/i)
Meters Procurement of Meters no. 900 5,339,983
Vehicle and Motorbikes Procurement of pickup phase 1 no. 1 890,000
Buildings Office rehabilitation and fixtures no. 1 1,500,000
Office equipments Office furniture and computers no. 6 2,004,271
Sewerage 1,799,678
Kiamosi sewer line extension DN 150 Extension of sewer to increase sewerage coverage in 500 1,000,000
Rehabilitation of sewer manholes in mimi DNI5I Rehabilitation of old sewer system in 250 799,678
Extension of service lines 9,464,267
Mirira Rural Road DN50 Extension of water supply to increase water coverage in 3,000 750,000
Kambinva Maragua A & B DN50 Extension of water supply to increase water coverage in 20,000 5,000,000
Mirira Gikuu
7_6~
Extension of water supply to increase water coverage m 1,200 464,267
Project Area Size Description Unit Quantity Project Cost (KS/i.)
Githundi sagana road DNIO0 Extension of water supply to increase water coverage m 5,000 3,250,000
Water System rehabilitation 2,800,000
Katiba distribution lines DN80 Replacement of old dilapidated line and to improve reliability m 2,000 1 ,300,bOO
Courtyard line DN 150 Replacement of old dilapidated line and to improve reliability m 1,000 1,500,000
TOTAL 23,798,199
2017/2018
2017-2018 INVESTMENT PROJECTS
Project Area Size Description Unit Quantity Project Cost (KSh.)
Meters Procurement of Meters no. 500 4,405,486
Vehicle and Motorbikes Procurement of pickup phase 2 no. 1 3,210,000
Buildings Maragi tank repair and fence and kiharu staff houses no. 2 1,979,646
Office equipments I office rehabilitation and fixtures no. 1 1,204,698
Sewerage 8,757,529
Baptist Kiamosi sewer line extension DNI 50 Extension of sewer to increase sewerage coverage in . 3,000 7,000,000
Rehabilitation of sewer manholes in CBD DNI 50 Rehabilitation of old sewer system m 200 1,000,000
Rehabilitation of town management sewer line
DN15I Rehabilitation of old sewer system
_________ in 500 757,529
Extension of service lines _______ 7,160,694
Mirira Kengen area DN5O
________
Extension of water supply to increase water coverage m 5,000 1,250,000
Sagana Rd estate distribution DN5O
________
Extension of water supply to increase water coverage m 11,000 2,750,000
Marewa area distribution DN5O Extension of water supply to increase water coverage in 3,500 910,694
Kamuiru Gitungano distribution DN8O Extension of water supply to increase water coverage m 5,000 2,250,000
Water System rehabilitation 12,380,524
Milimani area distribution DN50 Rehabilitation of old distribution system to improve reliability in 2,500 1,250,000
Majoice distribution DN50 Replacement of old dilapidated line and to improve supply capacity m 3,000 1,480,524
Majoice mainline DN80 Replacement of old dilapidated line and to improve reliability in 3,500 1,225,000
Mjini distribution DN50 Replacement of old dilapidated line and to improve reliability in 5,500 1,925,000
Mukuyu distribution DN80
________
Replacement of old dilapidated line and to improve reliability in
_______
4,500 2,925,000
Katiba distribution lines DN80 Replacement of old dilapidated line and to improve reliability m
_______
2,500 1,625,000
Grogon distribution DN80 Replacement of old dilapidated line and to improve reliability m
_______
3,000 1,950,000
TOTAL ______ _________ 38,364,329
2018/2019
2018-2019 INVESTMENT PROJECTS
Project Area Size Description Unit Quantity Project Cost (KS/i.)
Meters Procurement of Meters no. 500 31671,238
Vehicle and Motorbikes Procurement of pickup phase 2 no. 1 3,210,000
Buildings Maragi tank repair and fence and kiharu staff houses no. 2 1,979,646
Office equipments office rehabilitation and fixtures no. 1 1,204,698
Sewerage 8,757,529
Baptist Kiamosi sewer line extension DN150 Extension of sewer to increase sewerage coverage in 3,000 7,000,000
Rehabilitation of sewer manholes in CBD DN1 50 Rehabilitation of old sewer system m 200 1,000,000
Rehabilitation of town management sewer DN 151 line
Rehabilitation of old sewer system in 500 757,529
Extension of service lines 7,160,694
Mirira Kengen area DN50 Extension of water supply to increase water coverage in 5,000 1,250,000
Sagana Rd estate distribution DNSO Extension of water supply to increase water coverage in 11,000 2,750,000
Marewa area distribution DN50 Extension of water supply to increase water coverage m 3,500 910,694
Kamuiru Gitungano distribution DN80 I Extension of water supply to increase water coverage in 5,000 2,250,000
13th April, 2017 THE KENYA GAZETTE 1527
Project Area Size Description Unit Quantity Project Cost (KS/i.)
Water System rehabilitation 12,380,524
Milimani area distribution DN50 Rehabilitation of old distribution system m 2,500 1,250,000 to improve reliability
Majoice distribution DN50 Replacement of old dilapidated line and to in 3,000 1,480,524 improve supply capacity
Majoice mainline DN80 Replacement of old dilapidated line and to in 3,500 1,225,000 improve reliability
Mjini distribution DN50 Replacement of old dilapidated line and to in 5,500 1,925,000 improve reliability
Mukuyu distribution DN80 Replacement of old dilapidated line and to in 4,500 2,925,000 improve reliability
Katiba distribution lines DN80 Replacement of old dilapidated line and to in 2,500 1,625,000 improve reliability
Grogon distribution DN80 Replacement of old dilapidated line and to m 3,000 1,950,000 improve reliability
TOTAL 39,098,577
2019/2020
2019-2020 INVESTMENT PROJECTS
Project Area Size Description Unit Quantity Project Cost (KS/i.)
Meters Procurement of Meters no. 1,000 6,461,379
Vehicle and Motorbikes Procurement of Motorbikes no. 4 31531,000
Buildings Kane staff housed and operation office no. 3 2,177,610
Office equipments Computers and printers no. 5 2,425,167
Sewerage 8,280,000
Kiharu sewer line extension DN 150 Extension of sewer to increase sewerage coverage in 25,000 7,280,000
Rehabilitation of sewer manholes in kiharu
DN150 Rehabilitation of old sewer system m 150 700,000
Rehabilitation of Muranga plaza sewer line
Rehabilitation of old sewer system m 100 300,000
Extension of service lines 14,701,763
Kimotho Rutune DN50 Extension of water supply to increase water coverage m 6,000 1,500,000
Githuri distribution DN50 Extension of water supply to increase water coverage m 8,000 2,114,263
Rural road distribution DN50 Extension of water supply to increase water coverage in 13,000 3,250,000
Slaughter estate distribution DN50 Extension of water supply to increase water coverage in 13,000 3,250,000
Gikandu distribution DN50 Extension of water supply to increase water coverage in 7,500 1,875,000
Kiawambeu distribution DN50 Extension of water supply to increase water coverage in 5,000 1,250,000
Kabuta distribution DN80 Extension of water supply to increase water coverage in 3,250 1,462,500
Water System rehabilitation 22,073,597
Raw water main DN350 Rehabilitation of old distribution system to improve reliability in 2,000 2,000,000
Nairobi road line DN50 Rehabilitation of old distribution system to improve reliability m 5,000 2,500,000
Kiamburi line DN50 Replacement of old dilapidated line and to improve supply capacity m 2,000 780,021
Majoice mainline DN80 Replacement of old dilapidated line and to improve reliability in 1,500 525,000
Kangema mainline DN 150 Replacement of old dilapidated line and to improve reliability in 2,000 3,000,000
St Mary main lines DN100 Replacement of old dilapidated line and to improve reliability in 2,200 1,650,000
Transmission main DN1 50 Rehabilitation of old distribution system to improve reliability in 1,500 1,250,000
Maragi DNSO Rehabilitation of old distribution system to improve reliability in 3,000 1,050,000
Embassy DN50 Replacement of old dilapidated line and to improve supply capacity in 1,500 568,576
Njoguini DNSO Replacement of old dilapidated line and to improve reliability in 5,000 1,750,000
Karuri DN50 Replacement of old dilapidated line and to improve reliability in 7,000 2,450,000
Mukuyu DN50 Replacement of old dilapidated line and to improve reliability in 5,000 1,750,000
__________
Kambirwa DN50 Replacement of old dilapidated line and to improve reliability m ,000 700,000
Mumbi DN50 Replacement of old dilapidated line and to improve reliability in 1 6,000 2,100,000
TOTAL 59,650,516
MOSES M. NAIVASHA, Chief Executive Officer, Tana Water Services Board (TWSB).
Approved by:
ROBERT GAKUBIA, Chief Executive Officer, MR13133933
Water Services Regulatory Board (WASREB).
GAZErrE NOTICE No. 3516
THE ENERGY REGULATORY COMMISSION
SCHEDULE OF TARIFFS 2013 FOR ELECTRICITY TARIFFS, CHARGES, PRICES AND RATES
FUEL COST CHARGE
PURSUANT to clause 1 of Part III of the Schedule of Tariffs 2013, notice is given that all prices for electrical energy specified in Part II of the said Schedule will be liable to a fuel cost charge of plus 285 Kenya cents per kWh for all meter readings to be taken in April, 2017.
Information used to calculate the fuel cost charge.
Power Station Fuel Price in
March,201 7
KSh/Kg. (Ci)
Fuel Displacement
Chargel Fuel Charge
March, 201 7KSh./kWh
Variation from
February, 2017
Prices increase/(Decrease)
Units in March, 2017 in kWh (Gi)
Kipevu I Diesel Plaflt 47,79 1.31 16,080,000
Kipevu II Diesel Plant (Tsavo) 50.22 6.42 14,533,000
Kipevu III Diesel Plant 47.62 2.16 58,853,000
EmbakasiGT 1-Muhoroni 81.71 0.97 15,988,620
Rabai Diesel (with steam turbine) 45.61 0.78 -
Iberafrica Diesel 50.46 4.93 1,041,933
Iberafrica Diesel-Additional Plant 50.22 5.00 23,818,660
Thika Power Diesel Plant 55.61 5.49 2,711,000
Thika Power Diesel Plant (with steam unit) 55.61 5.49 17,105,700
Gulf Power 56.34 (1.41) 4,334,628
Triumph Power 53.66 3.88 8,154,100
Triumph Power 53.66 3.88 1,645,400
Mumias Sugar Company 3.50 (0.02) -
Biojoule 7.20 (0.06) 46,874
Olkaria IV Steam Charge 2.06 (0.01) 76,473,106
Olkaria I Unit IV and V Steam Charge 2.06 (0.01) 90.064,795
Opower4 19,401,150
UETCL Import (Non-Commercial) 11.81 0.16 2,470,822
UETCL Import (Commercial) 15.65 (1.26) 20,181,068
ETCL Export (Non-Commercial) 11.81 1.16 (717,010)
UETCL Export (Commercial) 11.30 0.48 -
Lodwar Diesel (Thermal) 113.32 5.97 797,203
Mandera Diesel (Thermal) 122.00 3.66 879,560
Marsabit Diesel (Thermal) 104.42 (1.39) 426,191
Wajir Diesel 112.12 4.76 943,275
Moyale Diesel (Thermal) 87.06 - 35,330
Mpeketoni - - - -
Hola (Thermal) - - - -
Merti (Thermal) 127.86 1.52 42,543
Habaswein (Thermal) 106.48 (1.44) 121,736
Elwak (Thermal 115.59 6.27 122,911
Baragoi 95.94 -
- 27,824
Mfangano(Thermal) 11.80 - 0.61 50,072
Lokichogio 18.64 - 3.44 129,916
Takaba (Thermal) 114.87 .- 52,289
Eldas 110.26 9.46 36,216
Rhamu 102.53 - 41,058
Laisamis 70.55
- 13,833
North Hoff 109.41 (26.51) 7,009
Lokori 111.78 - 12,267
Daadab 104.10 57,876
Faza-Island
. 164.42 - 14,665
Lokitaung 142.73 (1.04) 6.528
Kiunga 104.33 - 6,214
Total units generated and purchased including hydros, excluding exports in March, 2017 (G) = 880,304,677kWh.
ROBERT PAVEL OIMEKE, MR/2484378 Ag. Director-General.
Dated the 13th April, 2017.
ROBERT PAVEL OIMEKE,
Ag. Director-General.
Extracted Entities (1)
previous_gazette_ref
3515
Details
- Act / Legislation
- THE WATER ACT
- Signed By
- ROBERT PAVEL OIMEKE
- Title
- Ag. Director-General
- Date Signed
- 13th April 2017
- Page
- 38
- Extraction Method
- regex
Source Gazette
Vol. CXIX No. 46
Published 12th January 2017