GAZETTE NOTICE NO. 6336
GAZETTE NOTICE NO. 6336
THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
(No. 8 of 1999)
RESTORATION
PURSUANT to Regulation 21 of the Environmental Management and Co-ordination (Impact Assessment and Audit) Regulations, 2003, the National Environment Management Authority (NEMA) has received an Environmental Impact Assessment Study Report for the above proposed project.
The proponent, Woodland View Limited, is proposing to develop residential apartments on Plot L.R. No. 1870 / I / 209 along Mkungu
Close at Parklands Area in Nairobi. The proposed project will include the construction of an eighteen storied residential apartment comprising a total of two hundred and sixty three (263) units, parking spaces, resident's lawn and party area, squash courts, gymnasium, swimming pool and associated amenities.
The following are the anticipated impacts and proposed mitigation measures:
Impacts Proposed Mitigation Measures
Site disturbance • Excavate only areas to be affected by buildings.
• Dumping of excess excavated materials to Sites designated by NEMA and
Council.
• Restoration of sites excavated.
Disturbance of . Proper signage.
traffic flow • Awareness creation.
• Education to truck drivers.
Soil erosion • Create and maintain soil traps and embankments.
• Landscaping after completion of construction.
Solid waste • Ensure waste materials are disposed of on county authorities and NEMA approved Sites.
• Ensure re-use of materials that can be re-used.
• Use of the 3R - Reduce, Re-use, Re- cycle.
• Adherence to Waste Management
Regulations of 2006.
Air quality . Water sprinkling of driveways or the use of biodegradable hydrant e.g. Terrasorb polymer will reduce dust emission during construction.
• Ensure servicing of vehicles regularly.
• Adherence to Air Quality Regulations, 2014.
Noise pollution and • Ensure use of serviced and greased vibration equipment.
• Switch off engines not in use.
• Construction work to be confined to between 8 a.m. to 5 p.m.
• Ensure use of earmuffs by machine operators.
• Adherence to Noise and Excessive
Vibration Pollution (Control)
Regulations, 2009.
Collapse of building Ensuring building strength and stability during construction
• Use of appropriate construction materials and reinforcements as per specifications
• Ensuring building components are as per designs.
• Ensure proper timelines are followed e.g. curing time.
Occupational health and • Provide first aid kits on site.
safety
• Education and awareness to all construction workers.
• Ensure use of appropriate personal protective clothing.
• Proper signage and warning to public of heavy vehicle turning.
• Ensuring building strength and stability.
• Provide clean water and food to the workers.
• The contractor to abide by all construction conditions especially clause
B12 which stipulates health safety and workforce welfare.
• Comply with the provisions of OSHA, 2007.
The full report of the proposed project is available for inspection during working hours at:
Director-General, NEMA, Popo Road, off Mombasa Road, P.O. Box 67839-00200, Nairobi.
Principal Secretary, Ministry of Environment and Natural
Resources, N.H.I.F. Building, 12th Floor, Ragati Road, Upper
Hill, Community, P.O. Box 30126-00100, Nairobi.
County Director of Environment, Nairobi City County.
The National Environment Management Authority invites members of the public to submit oral or written comments within thirty (30) days from the date of publication of this notice to the
Director-General, NEMA, to assist the Authority in the decision making process for this project.
GEOFFREY WAHUNGU, Director-General, MRJ3425099 National Environment Management Authority.
GAzErFE NOTICE No. 6337
THE ENVIRONMENTAL MANAGEMENt AND
CO-ORDINATION ACT
(No. 8 of 1999)
THE NATIONAL ENVIRONMENT MANAGEMENT
AUTHORITY
NOTICE TO THE PUBLIC TO SUBMIT COMMENTS ON AN
ENVIRONMENTAL IMPACT ASSESSMENT STUDY REPORT
FOR THE PROPOSED RESIDENTIAL HOTEL APARTMENTS ON
PLOT L.R.NO. 4242/65 ALONG SAUNDERS CLOSE, OFF
GETATHURU ROAD, KITUSURU AREA IN NAIROBI CITY
COUNTY
INVITATION OF PUBLIC COMMENTS
PURSUANT to Regulation 21 of the Environmental Management and Co-ordination (Impact Assessment and Audit) Rgula.ns, 2003, the National Environment Management Authority (NEMA) has received an Environmental Impact Assessment Study Report for the above proposed project.
The proponent, Highfields Developers Limited,iis pposing to construct a 2No. residential hotel apartments blocks on plot L.R. No.
4242/65 along Saunders Close off Getathuru Roach' Tilt proposed project will have a total of 224 resident moms, 30ONog.parking spaces and associated amenities.
The following are the anticipated impacts and proposed mitigation measures:
Impacts
Proposed Mitigation Measures
Site disturbance
Excavate only areas to be affected by buildings.
Dumping of excess excavated materials to sites designated by NEMA and Council.
Restoration of sites excavated.
Disturbance of traffic
Proper signage.
Awareness creation.
Education to truck drivers.
Soil erosion
Create and maintain soil traps and embankments, Landscaping after completion of construction.
Solid waste
Ensure waste materials are disposed of on county authorities and NEMA approved sites.
Ensure re-use of materials that can be re- used.
Use of the 3R - Reduce, Re-use, Re-cycle.
Adherence to Waste Management
Regulations of 2006.
Air quality
Water sprinkling of driveways or the use of biodegradable hydrant e.g. terrasorb polymer will reduce dust emission during construction. -
Ensure servicing of vehicles regularly.
Adherence to Air Quality Regulations, 2014.
Noise pollution and
Ensure use of serviced and greased vibration equipment.
Switch off engines not in use.
Construction work to be confined to between 8 a.m. to 5 p.m.
Ensure use of earmuffs by machine operators.
Adherence to Noise And Excessive
Vibration Pollution (Control) Regulations, 2009.
Collapse of building
Ensuring building strength and stability.
during construction
Use of appropriate construction materials and reinforcements as per specifications.
Ensuring building components are as per designs.
Ensure proper timelines are followed e.g.
curing time.
Occupational health
Provide first aid kits on site.
and safety
Education and awareness to all construction workers.
Ensure use of appropriate personal protective clothing.
Proper signage and warning to public of heavy vehicle turning.
Ensuring building strength and stability.
Provide clean water and food to the workers
The contractor to abide by all construction conditions especially clause 1312 which stipulates health safety and workforce welfare.
Comply with the provisions of OSHA, 2007.
The full report of the proposed project is available for inspection during working hours at:
Director-General, NEMA, Popo Road, off Mombasa Road, P.O. Box 67839-00200, Nairobi.
Principal Secretary, Ministry of Environment and Natural
Resources, N.H.I.F. Building, 12th Floor, Ragati Road, Upper
Hill, Community, P.O. Box 30126-00100, Nairobi.
(C) County Director of Environment, Nairobi City County.
30th June, 2017 THE KENYA GAZETTE 3503
The National Environment Management Authority invites members of the public to submit oral or written comments within thirty (30) days from the date of publication of this notice to the
Director-General, NEMA, to assist the Authority in the decision making process for this project.
GEOFFREY WAHUNGU, Director-General, MR13425 100 National Environment Management Authority.
GAzErrE NOTICE No. 6338
THE ENVIRONMENTAL MANAGEMENT AND
CO-ORDINATION ACT
(No.8 of 1999)
THE NATIONAL ENVIRONMENT MANAGEMENT
AUTHORITY
NOTICE TO THE PUBLIC TO SUBMIT COMMENTS ON AN
ENVIRONMENTAL IMPACT ASSESSMENT STUDY REPORT
FOR THE PROPOSED DEVELOPMENT OF ABORETUM PARK
RESIDENCIES ON PLOT L. R. NO. 4858/1 ALONG RING ROAD
AT KILELESHWA AREA IN NAIROBI CITY COUNTY
INVITATION OF PUBLIC COMMENTS
PURSUANT to Regulation 21 of the Environmental Management and Co-ordination (Impact Assessment and Audit) Regulations, 2003, the National Environment Management Authority (NEMA) has received an Environmental Impact Assessment Study Report for the above proposed project.
The proponent, Ultraline Limited, is proposing to construct thirteen storied residential apartments' block on plot L.R. No. 4858/1 along
Ring Road at Kileleshwa area in Nairobi City County. The project will have a total of 294No. residential units, parking spaces and associated amenities.
The following are the anticipated impacts and proposed mitigation measures:
Impacts Proposed Mitigation Measures
Site disturbance • Excavate only areas to be affected by buildings.
• Dumping of excess excavated materials to sites designated by NEMA and
Council:
• Restoration of sites excavated.
Building materials • Availability and sustainability of the extraction sites as they are non- renewable in the short term.
• Landscape changes e.g. displacement of animals and vegetation, poor visual quality and opening of depressions on the surface.
Soil erosion • Create and maintain soil traps and embankments.
• Landscaping after completion of construction.
Noise pollution and • Ensure use of serviced and greased vibration equipment.
• Switch off engines not in use.
• Construction work to be confined to between 8 a.m. to 5 p.m.
• Ensure use of earmuffs by machine operators.
Air quality • Water sprinkling of driveways or the use of biodegradable hydrant e.g. Terrasorb polymer will reduce dust emission during construction.
• Ensure servicing of vehicles regularly:
• Adherence to Air Quality Regulations, 2014.
Solid waste generation Ensure waste materials are disposed of on Council and NEMA approved sites.
• Ensure re-use of materials that can be re-used.
• Use of the 3rs - Reduce, Re-use, Re- cycle.
• Adherence to Waste Management
Regulations, 2006.
• Proper signage.
• Awareness creation.
• Education to truck drivers.
• Use electricity sparingly since high consumption of electricity negatively impacts on these natural resources and their sustainability.
• Use of standby generators.
Occupational health and • Provide first aid kits on site.
safety
• Proper signage and warning to public of heavy vehicle turning.
• Ensuring building strength and stability.
• Provide clean water and food to the workers.
The contractor to abide by all construction conditions especially clause
B12 which stipulates health safety and workforce welfare.
• Comply with the provisions of OSHA, 2007.
The full report of the proposed project is available for inspection during working hours at:
Director-General, NEMA, Popo Road, off Mombasa Road, P.O. Box 67839-00200, Nairobi.
Principal Secretary, Ministry of Environment and Natural
Resources, N.H.I.F. Building, 12th Floor, Ragati Road, Upper
Hill, Community, P.O. Box 30126-00100, Nairobi.
County Director of Environment, Nairobi City County.
The National Environment Management Authority invites members of the public to submit oral or written comments within thirty (30) days from the date of publication of this notice to the
Director-General, NEMA, to assist the Authority in the decision making process for this project.
GEOFFREY WAHUNGU, Director-General, MR/342509 1 National Environment Management Authority.
Dated the 30th June, 2017.
GEOFFREY WAHUNGU,
Director-General, 1 National Environment Management Authority.
Extracted Entities (1)
previous_gazette_ref
6336
Details
- Act / Legislation
- THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
- Reference
- No. 8 of 1999
- Signed By
- GEOFFREY WAHUNGU
- Title
- Director-General, 1 National Environment Management Authority
- Ministry
- Ministry of Environment And Natural
- Date Signed
- 30th June 2017
- Page
- 19
- Extraction Method
- regex
Source Gazette
Vol. CXIX No. 85
Published 8th May 2017