GAZETTE NOTICE NO. 10882
GAZETTE NOTICE NO. 10882
THE PHYSICAL PLANNING ACT
(Cap.286)
COMPLETION OF DEVELOPMENT PLAN
NOTICE is given that the above-mentioned development plan was on 23rd October,2017, completed.
The development plan relates to land situated within Voi
Townshrp.
Copies of the development plan have been deposited for public inspection at the Counry Physical Planning Office, Wundanyi and Sub-
County Office, Voi.
The copies so deposited are available for inspectron free of charge by all persons interested at the County Physical Planning Office, Wundanyi and Sub-County Office, Voi, between the hours of 8.00 a.m. to 4.30 p.m., Monday to Friday.
Any interested person who wishes to make any representation in connection with or objection to the above-named development plan may send such reprcsentations or objections in writing to be received by the County Physical Planning Office, P.O. Box 1264, Wundanyi, within sixty (60) days from the date of publication of this notice and such reprcsentation or objectron shall state the grounds on which it is made.
Dated the 23rd October,2017 .
MRt3556524
DANIELGITHIRA
Jor Director oJ Physrcal Phn)ing.
GAZETTENoTcENo. I0883
THE PHYSICAL PLANNING ACT
(Cap.286)
COMPLETION OF DEVELOPMENT PLAN
PDP No. TTAl227l2015/)|-Proposed Site for Watate Sub-Count.v, Administrative Office
NOTICE is given that the above-mentioned development plan was on 24th October,20l7, completed.
The development plan relates to land situated within Mwatate
Township.
Copies of the development plan have been deposited for public inspection at the County Physical Planning Office, Wundanyi and Sub-
County Office, Mwatate.
The copies so deposited are available for inspection free of charge by all persons interested at the County Physrcal Plannrng Offrce, Wundanyi and Sub-County Office, Mwatate, between the hours of
8.00 a.m. to 4.30 p.m., Monday to Friday.
Any interested person who wishes to make any representation in connection with or objection to the above-named development plan may send such representations or objections in writing to be received by the County Physical Planning Office, P.O. Box 1264, Wundanyi, within sixty (60) days from the date of publication of this notice and such representation or objection shall state the grounds on which it rs made.
Dated the 2'7 th October, 2Ol7 .
DANIELGITHIRA for Director of Physical Plan'ningMR/3556513
Increased solid waste
GAZETIE NoTICE No. 10884
THE ENVIRONMENTAL MANAGEMENT AND
CO-ORDINATION ACT
(No.8 of 1999)
THE NATIONAL ENVIRONMENT MANAGEMENT
AUTHORITY
EI\VIRONMENTAL IMPACT ASSESSMENT STUDY REPORT
FOR THE PROPOSED HOTEL AND AMUZEMENT PARK-
COTTAGES, CONFERENCE AND RECREATIONAL FACILITIES, RESIDENTIAI.TOWNHOUSES, MANSIONET'TE AND
APARTMENTS ; COMMERCIAL CENTRE AND EDUCATIONAL
DEVELOPMENT IN RUIRU SUB-COUNTY OFKIAMBU
COUNTY
INVITA.I'IoN oF PUBLIC CoMMENTS
PURSUANT to regulatron 2l of the Environmental Management and Co-ordination (Impact Assessment and Audrt) Regulations, 2003, the National Environment Management Authority (NEMA) has received an Environmental Impact Assessment Study Report for the above proposed project.
The proponent, Cytonn Investment Partners Five LLP, is proposing to put up a mixed deveiopment consrsting of hotel and amusement park-cottages, conference and recrcational facilities; residential- townhouses, maisonette and apartments; commercial center and educational development; apartments will rnclude (70 one bedroom and 14O two bedroom) with associated amenities in River Run
The following are the anticipated impacts and proposed mitigation measures:
Impacts
Loss ofbiodiversity
Soil degradation
Noise and vibrations
P ropo s e d Mitigatio n Me a s ure s
.
Retain vegetation screens to reduce the visual effect of construction activities where possible.
.
Clearance of vegetation should be done in necessary areas only.
. After project completion, proponent should carry out environmental compensation where harm cannot be avoided by use of indigenous plants.
. Rocked construction entrance and exit to keep sediment from being tracked onto adjacent roads.
.
Stock piles to be covered with tarpaulins and slope stabrlity to be checked.
.
Landscap€ all disturbed areas after construction phase.
. Provlsion of barriers such as walls around the site boundaries to provide some buffer against noise.
.
Installation of portable barriers to shield compressors and other small stationary equipment where necessary.
. Silenced machinery and instruments should be employed where possible.
. Provide and enforce use of PPE among workers e.g. ear muffs.
. Proper servicing of machinery and equipment (oiling, greaslng etc.).
. Monltor nolse levels as per NEMA guidelines.
. Ensure that construction machinery is kept in good condition to reduce noise generation.
. Adherence to Noise And Excessive
Vibration Pollution (Control)
Regulations,2009.
. Limit quantity by developing appropriate budgets for purchase of raw materials to reduce wastage through exposure to weather elements.
3rd November,2017 THE KENYA GAZETTE 5769
Air pollution
Increased water demands .
River degradation
River flooding
Public health and occupational safety and health
Provision of a waste transfer station within the development.
Segregation of waste at source through provision of separate bins.
Contract a duly licensed waste handler to transport waste.
Strict adherence to Waste Management
Regulations. 2006.
Spray water on exposed areas twrce daily during dry weather to suppress dust.
Cover loads of friable materials during transportation and avoid pouring dust materials from elevated areas to ground.
Provrde dust screens where necessary.
Control speed of construction vehicles and switch off machines when not in u se.
Regularly service and marntain vehicles, mobile plants and machinery.
Provide PPE such as nose masks to the workers in dust generation areas.
All raw materials must be sourced as close as possible to the construction site thus reducing the emissions from vehicular traffic.
Adherence to Air Qualrty Regulations of
2014.
Installation of flush torlets with low volume cisterns and hrgh pressure.
Efficient waste water recychng and rain water harvestrng.
Maintarn a ripanan buffer zone along the fuver as per WRMA recommendations.
Only permitted actrvrties shall be undertaken wrthin the full width of the
Lrver or wrthrn the riparian reserye as per
Water Qualrty Regulatrons 2006.
To the extent possible, limit any modifications to natural streams
Preserve and maintain the rivers, natural streams and drainage ways within the developed areas by designating them as part of the open space system.
To the extent possible, limit any modifications to natural streams and drainage ways, unless they are necessary for flood protection, to preserve water quality and protect aesthetic and brological resources.
Plant environmentally friendly trees on the riparian reserve to increase interception and storage while reducing surface run off.
Discourage the planting of eucalyptus, sugarcane and invasive species in the water resource areas while giving altemative species such as bamboo.
Liarse with WRMA to decommission the weir in the river and further discuss all options with WRMA to prevent flooding.
Adequate sanitary facilities should be provided and standard cleanhness maintained.
Personnel to wear complete PPE.
Only qualified personnel to operate the machinery.
Designate a health and safety officer to be in-charge of enforcing site compliance with OSH rules and regulations.
Provrsion of an adequately stocked frst aid kit and at least one trained first aider
;Hii, -" contact numbers of the persons responsible for handling emergencies on the site.
.
Contractor should have workmen's compensation cover which should comply with workmen's compensation
Act.
Comply with the provision of OSHA, 2007.
The full report of the proposed project is available for rnspection during working hours at:
(a)Director-General, NEMA, Popo Road, off Mombasa Road, P.O. Box 67839-00200. Nairobi.
(b) Principal Secretary, Ministry of Environment and Mineral
Resources, NHIF Building, Community, P.O. Box 30126-
00100, Nairobi.
(c) County Director of Environment, Kiambu County.
The National Environment Management Authority invites members of the public to submit oral or written comments within thirty (30) days from the date of publication of this notice to the
Director-General, NEMA, to assrst the Authority in the decrsion making process of the plan.
GEOFFREY WAHUNGU, Director-General, MR/3593956 Nattonal Environment Management Authority
GAZEITE NoTICE No. 10885
THE ENVIRONMENTAL MANAGEMENT AND
CO.ORDINATION ACT
(No.8 of 1999)
THE NATIONAL ENVIRONMENT MANAGEMENT
AUTHORITY
ENVIRONMENTAL IMPACT ASSESSMENT STUDY REPORT
FOR THE PROPOSED ISIOLO_GARBA TULLA_GARISSA HIGH
VOLTAGE TRANSMISSION LINE PROJECT IN ISIOLO AND
, GARISSA COUNTIES
IN!.ITATIoN oF PUBLIC CoMMENTS
PURSUANT to regulation 21 of the Environmental Management and Co-ordrnation (Impact Assessment and Audit) Regulations, 2003, the National Environment Management Authority (NEMA) has received an Environmental lmpact Ass€ssment Study Report for the above proposed project.
The proponent, Kenya Electncity Transmission Company
(KETRACO) is proposing to construct a22OkY transmission line from
Isiolo substation through Garbatulla, to Garissa with substations at
Isiolo, Garbatulla and Garissa. Detailed scope of work for the project is as follows:
Transmission Line o Isiolo-Garbatulla-Garissa Overhead Power Line (285 km)
Substation
. Bay Extensionat22O/132kV Isiolo Substation
.
Bay Extension at220ll32kY Garissa Substation
.
2 x23 MVA 220l33kv Substation at Garbatulla
The following are the anticipated impacts and proposed mitigation measures:
Impacts
Destruction of existing vegetation and habitat
Propo s ed Miti gation Me asu re s
.
Conduct selective clearing of vegetation on the way-leave corridor. Avoid unnecessary vegetation cleanng; only tall trees that poses a danger to the transmission line and vegetation on the foot plinth of the tower to be removed.
Noise and vibration
Arr pollution
Ensure proper demarcatron and delineation of the project area to be affected by constructlon works.
Specify locations for trailers and equipment, and areas of the site which should be kept free of traffic, equipment and storage.
Designate access routes and parking withrn the srte.
With Assistant from communrty, KWS and KFS, initiate a tree planting exercise.
Design and implement an appropriate landscaping programme for the substations site.
Support community initiatives in tree planting.
Sensitize construction vehicle drivers and machinery operators to swilch off engines of vehicles or machinery not being used.
Sensitize construction drivers to avoid running of vehicle engines or hoohng.
Regular servicing of engines and machrne parts to reduce noise generation.
Ensure that all generators and heavy duty equipment are insulated or placed in enclosures (containers) to minimize ambient noise levels.
Trees to be planted around the srte to provide some buffer against noise propagation.
The noisy construction works will entirely be planned to be during day time when most of the neighbours will be at work.
Provide necessary PPE to workers who may be exposed to high levels of noise and ensure proper and constant use.
All construction equlpment and machrnery to be used must be tested to venfy if they are compliant with Kenya and the internatlonally acceptable standards of noise.
Adherence to Nolse And Excesslve
Vibration Pollution (Control)
Regulations, 2009.
Ensure strict enforcement of on-site speed limit regulations.
Avord excavation works in extremely dry weather.
Sprinkle water on graded access routes when necessary to reduce dust generation by construction and vehicles.
Stockpiles of earth should be enclosed / covered / watered during dry or wrndy conditions to reduce dust emissions.
PPE to be provided to employees and ensure proper and constant use.
Sensitrze truck drivers and machine operators to switch off engines when not in use.
Regular servicing of engines and machine parts to reduce exhaust emission generatlon.
Alternative non-fuel constructron equipment shall be used where feasrble.
Adherence to Air Quality Regulatrons of
2014.
Increased solid waste generation
Generation of wastewater o
Oil sprlls hazards
Soil erosion and storm- water runoff
Use of an integrated solid waste management system i.e. the 3 R's: l.
Reduction at source 2. Reuse 3. Recycle.
Accurate estimatron of the dimensions and quantities of matenals requued.
Use of durable, longJasting materials that wrll not need to be replaced as often, thereby reducing the amount of construction waste generaled over time.
Provide facilities for proper handling and storage of constructron materials to reduce the amount of waste caused by damage.
Use building materials that have minimal or no packaging to avoid the generation of excessive packaging waste
Reuse packaging materials such as removed wooden poles, cartons, cement bags, empty metal and plastic containers to reduce waste at site.
Waste collection bins to be provided at designated points on site.
Dispose waste more responsibly by contractrng a registered waste handler who will dispose the waste at designated sites or landfills only and in accordance with the existing laws.
Strict Adherence to Waste Management
Regulations, 2006.
Provide means for handling sewage generated at the construction slte.
Conduct regular checks for sewage prpe blockages or damages since such vices can lead to release of the effluent into the land and water bodies.
Monitor effluent qualrty regularly to ensure that the stipulated discharge rules and standards are not violated.
Adherence to Water Quality Regulations of 2006.
Install orl trapping equipment in areas where there is a likelihood of oil spillage e.g. during marntenance of vehicles.
Storage and liquid rmpoundment areas for fuels, raw and in-process material solvents. wastes and hnished products should be designed wrth secondary containment to prevent spills and the contamination of soil, ground and surface water.
A wntten substahons response plan should be prepared and retained on the site and the workers should be tmined to follow specific procedures in the event of a spill.
Collected used oils should be re-used, drsposed of appropriately by licensed waste handlers, or be sold for reuse to licensed firms.
Surface runoff and roof water shall be harvested and stored in tanks so that it can be used for cleanrng purposes.
A storm water management plan that minimizes impervious area infiltration by use of recharge areas and use of detention and/or retention wlth graduated outlet con[ol structure wrll be designed.
Apply soil erosion control measures such as levelling of the project site to
3rd November,2017 THE KENYA GAZETTE 577 1
Visual and aesthetic impacts
Increase in social vices including HIV/AIDS
Resettlement and loss of use
Cultural heritage and archaeological finds reduce run-off velocity and increase infiltration of storm water into the soil.
Extensive public consultation during prolect planning.
Structures at the site should be designed in such a way that they will improve the beauty of the surroundings.
Restore site area through backfilling, landscaping and planting of trees, shrubs and grass on the open spaces to re- introduce vrsual barriers.
Design and implement an appropriate landscaping prograrnme.
Guidance and counselling on HIV/AIDS and other STDs to employees.
Provrsion of condoms.
Contractor to have a strong policy on sexual harassment and abuse of office guided by proponent's policy on the same.
Periodic sensitization forums for employees on ethics, morals; general good behavror and the need for the project to co-exist with the neighbours.
Conduct consultation meetings with
Project Affected Persons and ensure timely compensation for loss of property and land use. Ensure adherence to country legal legislatrons and World
Bank Safeguard Policy 4.12 on
Involuntary Resettlement.
Upon discovery of a heritage site or an
Archaeological find, the construction site wiII be stopped, the site if possible will be restricted using tapes or local matenals. and relevant authorities including local administratron officers and the museums of Kenya informed for further instructions.
hohibit access by unauthorized personnel into the construction site
Train all employees and regularly sensitize them on safe working procedures.
Occupational health and safety
: #**ffil:i:{'i:r:"l;."
Provrde necessary PPEs to workers.
.
Erect a perimeter fence to enclose the substations.
. Ensure strict compliance wrth the
Occupatronal Safety and Health Act
(osHA) 2007.
The full report of the proposed project is available for inspechon dunng working hours at:
(a)Director-General, NEMA, Popo Road, off Mombasa Road, P.O. Box 67839-O0200, Narobi.
(b) Principal Secretary. Ministry of Envronment and Mineral
Resources, NHIF Buildrng, Community, P.O. Box 30126-
00100, Nairobi.
(c) County Director of Environment, Isiolo County.
(d) Counry Director of Environment, Garissa County.
The Nauonal Environment Management Authority invites members of the public to submit oral or written comments wrthm thirty (30) days from the date of publication of this notice to the
Director-General, NEMA, to assist the Authority in the decision making process of the plan.
GEOFFREY WAHUNGU, Director-General, MRt3556779 Nati onal Env i ro nme nt Mandq e ment Autho r ity.
GAZE-ITE NoTICE No. I 0886
THE ENVIRONMENTAL MANAGEMENT AND
CO.ORDINATION ACT
(No.8 of 1999)
THE NATIONAL ENVIRONMENT MANAGEMENT
AUTHORITY
ENTVIRONMENTAL IMPACT ASSESSMENT STUDY REPORT
FOR THE PROPOSED KITUI_MUTOMO_KIBWEZI HIGH
VOLTAGE TRANSMISSION LINE PROJECT IN KITUI AND
MAKUENI COTINTIES
IN\.ITATIoN oF PUBLIC CoMMENTS
PURSUANT to regulation 21 of the Environmental Management and Co-ordination (Impact Assessment and Audrt) Regulatrons, 2003, the National Environment Management Authority (NEMA) has recelved an Environmental Impact Assessment Study Report for the above proposed project.
The proponent, Kenya Electricity Transmissron Company
(KETRACO) is proposing to construct a 132kV transmission line from
. Kitui, through Mutomo and terminate in Kibwezi, Makueni County.
Detailed scope of work for the project is as follows:
Transmission Line
. Kitui-Mutomo Double Circurt Transmrssion Line (60km)
.
MutomG-Kibwezi Double Crrcuit Transmission Line (64km)
. l32kV LILO on Juja-Rabai Double Circuit Transmrssion Line for Kibwezi substation (4km)
Substation
.
132/33 kV Kitui Substation Bay Extension
.
132/33 kV Mutomo Substation
.
132133 kV Kibwezi Substation
The following are the anticipated impacts and proposed mitigation measures:
Impacts Proposed Mitigation Measures
Destruction ofexisting .
Conduct selective clearing of vegetation vegetation and habitat on the way-leave corridor. Avoid unnecessary vegetation clearing; only tall trees that poses a danger to the transmission line and vegetation on the foot plinth of the tower to be removed.
Specify locations for trailers and equipment, and areas of the site which should be kept free of traffic, Noise and vibration equipment, and storage.
.
Designate access routes and parking within the site.
. With Assistant from community, KWS and KFS, initiate a tree planting exercise.
.
Design and implement an appropriate landscaping programme for the substations site.
.
Supporl community initiatives in tree planting.
.
Sensitize construction vehicle drivers and machinery operators to switch off engines of vehicles or machinery not being used.
.
Sensitrze construction drivers to avoid running of vehicle engrnes or hooting.
.
Ensure that all generators and heavy duty equipment are insulated or placed in enclosures (containers) to minimize ambient noise levels.
.
Trees to be planted around the site to provide some buffer against noise propagation.
. The noisy construction works will entirely be planned to be during day trme when most of the nerghbours will be at work.
Air pollution
Increased solid waste generation
Generation of wastewatet '
Provrde necessary PPE to rvorkers who may be exposed to high levels of norse and ensure proper and conslant use.
All construction equipment and machinery to be used must be tested to venfy if they are compliant with Kenya and the internationally acceptable standards of noise
Adherence to Noise and Excessive
Vibration Pollution (Conhol)
Regulations, 2009.
Ensure strict enforcement of on-srte speed limit regulations.
Avoid excavation works in extrernely dry weather.
Sprinkle water on graded access routes when necessary to reduce dust generation by construction and vehicles.
Stockpiles of earth should be enclosed / covered I watered dunng dry or windy conditions to reduce dust emissions.
PPE to be provided to employees and ensure proper and constant use.
Sensrtize truck drivers and machine operators to switch offengines when not in use.
Regular servicing of engrnes and machine parts to reduce exhaust emrssion generatron.
Alternative non-fuel construction equipment shall be used where feasible.
Adherence to Air Quality Regulations of
2014.
Use of an integrated solid waste management system i.e. the 3 R's: l.
Reduction at source 2. Reuse 3. Recycle.
Accurate estlmation of the dimensions and quantities of materials required.
Use of durable, long-lasting materials that will not need to be replaced as often, thereby reducing the amount of construction waste generated over time.
Provide facilities for proper handling and storage of construction materials to reduce the amount of waste caused by damage.
Use burldrng materials that have minimal or no packaging to avoid the generation of excesslve packaging waste.
Reuse packaging materials such as removed wooden poles, cartons, cement bags, empty metal and plastic containers to reduce waste at slte.
Waste collection bins to be provided at designated points on site.
Dispose waste more responsibly by contracting a registered waste handler who will dispose the waste at designated sites or landhlls only and in accordance with the exrsting laws
Strict Adherence to Waste Management
Regulations, 2006.
Provide means for handling sewage generated at the consuuctron site.
Conduct regular checks for sewage pipe blockages or damages srnce such vices can lead to release of the effluent into the land and water bodies.
Monitor effluent quality regularly to ensure that the strpulated discharge rules and standards are not Yiolated.
Oil sprlls hazards
Soil erosion and storm- water runoff
Visual and aesthetic lmpacts lncrease in social vices including HMAIDS
Resettlement and loss of use
Cultural heritage and archaeological finds
Adherence to Water Quality Regulations of 2006.
Install oil trapping equipment in areas where there is a likelihood of oil sprllage e.g. during maintenance of vehrcles.
ln case of an oil spill, immediate clean up measures will be instituted.
Storage and liquid impoundment areas for fuels, raw and in-process material solvents. wastes and finished products should be designed with secondary containment to prevent spills and the contamination of soil, ground and surface water.
A written substations response plan should be prepared and retained on the site and the workers should be trained to follorv specific procedures in the event of a spill.
Collected used oils should be re-used, disposed of appropriately by licensed waste handlers, or be sold for reuse to licensed firms.
Surface runoff and roof water shall be harvested and stored in tanks so that it can be used for cleaning purposes.
A storm water management plan that minimizes rmpervious area inhltration by use of recharge areas and use of detention and/or retention with graduated outlet control structure will be designed.
Apply soil erosion control measures such as levelling of the project site to reduce run-off velocity and increase infiltration of stolm water into the soil.
Ensure that construction vehicles are restricted to use existing graded roads.
Extensive public consultation during project planning.
Structures at the slte should be designed in such a way that they wrll rmprove the beauty of the surroundings.
Restore site area through backfilling, landscaping and planting of trees, shnrbs and grass on the open spaces to re- introduce visual barriers.
Design and implement an appropriate landscaping programme.
Guidance and counselling on HIV/AIDS and other STDs to employees.
Provision of condoms
Contractor to have a strong policy on sexual harassment and abuse of office guided by prcponent's policy on the same.
Periodic sensitization forums for employees on ethics, morals; general good behavior and the need for the project to co-exist with the neighbours.
Conduct consultation meetings with
Project Affected Petsons and ensure timely compensation for loss of property and land use. Ensure adherence to country legal legislations and World
Bank Safeguard Policy 4.72 on
Involuntary Resettlement.
Upon discovery of a heritage site or an
Archaeological find, the construction site wili be stopped, the site if possible will be restricted using tapes or local materials. and relevant authorities
3rd November,20l7 THE KENYA GAZETTE 5173
Ocoupational health and safety
MR/3556780 rncludrng local administration officers and the museums of Kenya informed for further instructions.
. Prohibit access by unauthorized personnel into the construction site.
. Train all employees and regularly sensitize them on safe working procedures.
Periodic community sensitization of the dangers posed by the project.
Place waming signs where necessary.
Provide necessary PPEs to workers.
Erect a perimeter fence to enclose the substations.
Ensure stnct compliance with the
Occupational Safety and Health Act
(osHA) 2007.
The full repo( of the proposed project is avarlable for inspection during working hours at:
(a)Director-General, NEMA. Popo Road, off Mombasa Road, P.O. Box 67839-O0200, Nairobi.
(b) Principal Secretary, Mrnistry of Environment and Mineral
Resources, NHIF Building, Community. P.O. Box 30126-
00100, Nairobi.
(c) County Direclor of Environment, Makuenr County.
(d) County Director of Environment, Kitui County.
The National Environment Management Authority invites members of the public to submrt oral or written comments within thirty (30) days from the date of pubhcation of this notice to the
Director-General, NEMA, to assrst the Authority rn the decision making process of the plan.
GEOFFREY WAHUNGU, Drector-General, Natio nal En v iron me nt Ma nage me nt Autho r ity.
MR/3593645
GAZETTE NOTCENO. 10887
MADISON INSURANCE
LOSS OF.POLICY
Policy No. BMC4803806 in the nume oJ Baariu Fredrick Maore, oJ
P.O. Box 223, Maua.
NOTICE is given that evidence of loss or destruction of the above policy documents has been submitted to the company and ary person in possession of the policy documents or claiming to have interest therein should communicate within thrrty days (30) by reglstered post with the company, failing any such communication certrfied copies of the policy which shall be the sole evidence of the contract will be issued.
Dated the 28th September. 20J7.
JOSEPHAT MUTHWII, .
l,t ncle rw, ritin g, Mana ger, Life.
GAZETTE NoTICE No. I 0888
MADISON INSURANCE
LoSs oF PoLICY
Policy No. LD3211905 in the name of Okao Peter Abuga, of P.O. Box
55-002N, Nairobi.
NOTICE is given that evidence of loss or destructron of the above policy documents has been submittcd to the compzury and any person rn possession of the policy documents or claiming to have interest therein should communicate within thirty days (30) by registered post with the company, failing any such communicatron certified copies of the policy which shall be the sole evidence of the contract will be issued.
Dated the l lth October. 2017.
JOSEPHAT MUTHWII, U nde ruritin
B
Mana g e r, Life.MR/3593645 MR/3593937
MR/3593645
GAZETTENonCENo. I0889
MADISON INSURANCE
LOSS OF POUCY
Policy No. LS32'73244 in the nume oJ Waruiru Linus Wanjohi, of P.O.
Box 62, Karatina.
NOTICE is given that evidence of loss or destruction of the above policy documents has been submitted to the company and any person in possession of the policy documents or claiming to have interest therein should communlcate within thiny days (30) by registered post with the company. failing any such communication certified copres of the policy which shall be the sole evidence of the contract will be issued.
Dared the 28th September,2017.
JOSEPHAT MUTHWII, Underwriting Manager, Lifu
JOSEPHAT MUTHWII,
Underwriting Manager, Lifu.
Extracted Entities (1)
previous_gazette_ref
10882
Details
- Act / Legislation
- THE PHYSICAL PLANNING ACT
- Reference
- Cap.286
- Signed By
- JOSEPHAT MUTHWII
- Title
- Underwriting Manager, Lifu
- Ministry
- Ministry of Environment And Mineral
- Page
- 16
- Extraction Method
- regex
Source Gazette
Vol. CXIX No. 165
Published 30th June 2017