Back
OTHER 79% confidence via regex

GAZETTE NOTICE NO. 6980

PURSUANT to clause 1 of Part III of the Schedule of Tariffs 2013, notice is given that all prices for electrical energy specified in Part II of the said Schedule will be liable to a fuel cost charge of plus 285 Kenya cents per kWh. for all meter readings to be taken in July, 2017. Information used to calculate the fuel cost charge. Power Station Fuel Price in June, 2017 KSh/Kg. (Ci) Fuel Displacement Charge/ Fuel Charge June, 2017KSh./kWh Variation from May, 2017 Prices Increase/(Decrease) Units in June, 2017 in kWh (Gi) Kipevu I Diesel Plant 44.75 (2.21) 21,608,000 Kipevu II Diesel Plant (Tsavo) 50.40 0.07 17,301,400 Kipevu III Diesel Plant 46.17 2.46 63,870,000 Embakasi GT 1—Muhoroni 76.87 (2.68) 11,896,450 Rabai Diesel (With Steam Turbine) 43.54 1.51 61,798,000 Iberafrica Diesel 46.86 (2.75) 5,794,350 Iberafrica Diesel—Additional Plant 46.40 (2.82) 23,055,560 Thika Power Diesel Plant 53.34 2.03 3,002,200 Thika Power Diesel Plant (With Steam Unit) 53.34 2.03 42,569,900 Gulf Power 54.61 (0.06) 15,359,596 Triumph Power 57.53 2.24 3,858,700 Triumph Power 57.53 2.24 360,300 Mumias Sugar Company 3.52 0.01 — Biojoule 7.24 0.01 59,560 Olkaria IV Steam Charge 2.07 - 69,309,967 Olkaria I Unit IV and V Steam Charge 2.07 - 87,388,655 Opower 4 — - 20,290,610 UETCL Import (Non-Commercial) 10.89 0.03 2,191,715 UETCL Import (Commercial) 15.32 (0.30) 19,450,200 UETCL Export (Non-Commercial) 10.89 0.03 (427,245) UETCL Export (Commercial) 10.53 0.19 - Lodwar Diesel (Thermal) 55.18 (57.89) 729,560 Mandera Diesel (Thermal) 119.46 0.12 874,670 Marsabit Diesel (Thermal) 108.70 (11.54) 404,448 Wajir Diesel 111.73 (0.28) 951,181 Moyale Diesel (Thermal) 114.29 4.52 6,072 Merti (Thermal) 129.53 0.38 38,279 Habaswein (Thermal) 107.54 5.12 122,801 Elwak (Thermal 115.40 (3.69) 119,613 21st July, 2017 THE KENYA GAZETTE Power Station Fuel Price in June, 2017 KSh/Kg. (Ci) Fuel Displacement Charge/ Fuel Charge June, 2017KSh./kWh Variation from May, 2017 Prices Increase/(Decrease) Units in June, 2017 in kWh (Gi) Baragoi 95.94 - 27,299 Mfangano (thermal) 141.98 30.53 48,237 Lokichogio 114.62 (1.44) 130,750 Takaba (thermal) 114.87 - 49,230 Eldas 110.26 - 29,301 Rhamu 107.84 5.31 40,728 Laisamis 91.26 17.53 13,523 North Horr 120.50 - 7,007 Lokori 149.19 30.23 10,831 Daadab 100.05 - 55,809 Faza-Island 164.88 0.46 33,628 Lokitaung 139.71 - 5,770 Kiunga 104.33 - 11,000 Total units generated and purchased including hydros, excluding exports in June, 2017 (G) = 855,282,086 kWh. ROBERT PAVEL OIMEKE, Ag. Director-General.

Extracted Entities (1)

previous_gazette_ref

6980

Details

Signed By
ROBERT PAVEL OIMEKE
Title
Ag. Director-General
Date Signed
21st July 2017
Page
26
Extraction Method
regex