Back
OTHER 79% confidence via regex

GAZETTE NOTICE NO. 12542

PURSUANT to clause 1 of Part III of the Schedule of Tariffs 2013, notice is given that all prices for electrical energy specified in Part II of the said Schedule will be liable to a Fuel Cost Charge of Plus 285 cents per kWh for all meter readings to be taken in February, 2017. Information used to calculate the Fuel Cost Charge. Power Station Fuel Price in January, 2017 KSh/Kg. (Ci) Fuel Displacement Charge/ Fuel Charge January, 2017KSh./kWh Variation from December, 2016 Prices Increase/(Decrease) Units in January, 2017 in kWh (Gi) Kipevu I Diesel Plant 41.35 - 1.68 22,355,000 Kipevu Ii Diesel Plant (Tsavo) 33.82 - (4.08) 3,576,700 Kipevu Iii Diesel Plant 42.30 - 3.40 49,880,000 Embakasi Gt 1 (Muhoroni) 78.92 - 6.43 13,189,550 Embakasi Gt 2 (Embakasi) 96.36 - - - RABAI DIESEL With Steam Turbine 39.52 - (0.36) 58,178,000 Iberafrica Diesel 44.35 - 1.99 2,955,363 Iberafrica Diesel -Additional Plant 43.68 - 1.55 18,459,690 Thika Power Diesel Plant 44.35 - (3.02) 2,300,500 Thika Power Diesel Plant (With Steam Unit) 44.35 - (3.02) 11,440,100 Gulf Power 56.10 - 7.78 10,702,934 Triumph Power 49.83 - 0.77 1,115,300 Mumias Sugar Co. - 3.53 0.06 - Biojoule - 7.26 0.11 33,239 Olkaria Iv Steam Charge - 2.07 0.03 75,038,043 Olkaria I Unit Iv&V Steam Charge - 2.07 0.03 83,289,448 Orpower 4 - - - 20,842,950 Uetcl Import (Non Commercial) - 10.40 0.91 2,063,549 Uetcl Import (Commercial) - 16.95 0.87 18,810,586 Uetcl Export (Non Commercial) - 10.40 0.91 (718,305) Uetcl Export (Commercial) - 9.94 0.83 - Emergency Power (Muhoroni 3) - - - - Garissa Diesel (Kengen) 85.32 - - - 22nd December, 2017 THE KENYA GAZETTE Power Station Fuel Price in January, 2017 KSh/Kg. (Ci) Fuel Displacement Charge/ Fuel Charge January, 2017KSh./kWh Variation from December, 2016 Prices Increase/(Decrease) Units in January, 2017 in kWh (Gi) Garissa Diesel(Agrekko, Kengen) 85.32 - - - Garissa Diesel(Agrekko, Gok) 85.32 - - - Lamu Diesel 79.84 - - - Lodwar Diesel (Thermal) 107.18 - (1.36) 556,593 Mandera Diesel (Thermal) 111.68 - (2.46) 387,317 Marsabit Diesel (Thermal) 105.81 - (1.86) 408,671 Wajir Diesel 105.99 - (1.68) 864,903 Moyale Diesel (Thermal) 87.06 - - 10,628 Mpeketoni - - - - Hola (Thermal) - - - - Merti (Themal) 121.64 - (3.21) 40,413 Habaswein (Thermal) 106.86 - (0.83) 115,784 Elwak (Thermal) 111.95 - (0.40) 96,026 Baragoi 95.94 - - 25,813 Mfangano (Thermal) 110.78 - - 53,062 Lokichogio 112.43 - 0.08 110,187 Takaba (Thermal) 114.99 - (2.91) 47,852 Eldas 97.92 - 45.78 29,026 Rhamu 102.53 - 24.09 40,975 Laisamis 70.55 - - 14,845 North Horr 143.23 - - 6,482 Lokori 111.78 - - 9,815 Daadab 100.48 - 5.25 33,340 Faza Island 164.42 - - 17,557 Lokitaung 150.61 - 6.84 5,991 Kiunga 104.33 - 104.33 78 Total units generated and purchased including hydros, excluding exports in January, 2017 (G) =857,110,636 kWh. PAVEL ROBERT OIMEKE, MR/4167094 Director-General.

Extracted Entities (1)

previous_gazette_ref

12542

Details

Signed By
PAVEL ROBERT OIMEKE
Title
Director-General
Date Signed
22nd December 2017
Page
38
Extraction Method
regex