COMPLETION OF DEVELOPMENT PLAN
100% confidence
via regex
GAZETTE NOTICE NO. 4483
GAZETTE NOTICE NO. 4483
THE COMPANIES ACT
(No. 17 of 2015)
COMPLETION OF DEVELOPMENT PLAN
PURSUANT to section 897 (3) of the companies Act, it is notified that at the expiration of three (3) months from the date of this Gazette, the names of the under-mentioned companies shall unless cause is shown to the contrary be struck off the register of companies and the company shall be dissolved.
Number Name of Company
CPR/2014/168792 Acacia Hill Holdings Limited
C. 108153 Allia Industries Limited
CPR/201 1/60:355 Almasi Centennial Limited
C. 93544 Argonaut Limited
PVT-MKU39G Aremio Enterprises Limited
PVT-AAAAAI3 Brohaha Plumbers Limited
PVT-V7UAD6 Bruce Foundation Investment Limited
CPR/2009/12334 Bussy Bee Communications Limited
C. 166909 Chester Holdings Limited
C. 163392 Czar Motors Limited
C. 168122 Czar Distributors Limited
PVT/2016/009229 Chomozo Limited
CPR/2012/89986 Dhati Limited
PVT-5JU2KF Devibo Hardware Limited
CPR/2013/98963 Divas Defined Investments Limited
CPR/2012/67687 Farid Construction and Supplies Limited
PVT-8LUAZK Finexic Traders Limited
PVT-PJUY7J Gamers Castle Limited
PVT-MKU3LZ Hitachi Power Electronics Limited
CPRJ2009/12603 Island Green Enterprises Limited
PVT-AAABAB4 Jojobs Limited
CPRI2014/156505 Kovu Arts Limited
C. 147532 Lumumba Avenue Service Station Limited
C. 134864 Mackell Investments Limited
PVT/2016/030140 Meileda (K) Construction Limited
CPR/2009/9 150 Millenium Sixty Contractors Limited
CPR/2009/6478 Musa Trading Limited
PVT/20I 6/015150 Nduku and Ndaka Company Limited
CPRI2010/36232 Northview Apartments Limited
PVT-8LUP7M Osteokare Solutions Limited
PVT/2016/016090 Pallada Trading Limited
CPR/20 15/210949 Pharos Enterprises Limited
PVT-DLUY5K8 Ripumah General Traders Limited
CPR/2013/109410 Riskhub Insurance Agency Limited
C. 34038 Safariquip Limited
CPRI201 3/12 1863 Sharpquick Capital Limited
C. 123622 Shree Ram Limited
PVT/2016/018285 Shugga Beaus Company Limited
PVT-AAAABBO Stawemi Company Limited
PVT-RXU8JM Swushi Traders Limited
PVT/2016/016406 Sunset Gross Agro Products Limited
CPR/2013/100779 TVC News Service Limited
CPR/201 1/57746 Wine Basket Limited
CPR/201 1/57745 Wine Basket Kenya Limited
CPR/201 1/51597 Zafferano Limited
Dated the 23rd April, 2018.
MARGARET BAARO, for Registrar of Companies.
GAZETFE NOTIcE No. 4484
THE COMPANIES ACT
(No. 17 of 2015)
DISSOLUTION
PURSUANT to section 99 1(3) of the Companies Act, it is notified for general information that the under-mentioned company is dissolved.
Number
Name of Company
CF/201 1/50212
Nippo Corporation
Dated the 24th April, 2018.
MARGARET BAARO, for Registrar of Companies
GAZETFE NOTICE No.4485
THE CO-OPERATIVE SOCIETIES ACT
(Cap. 490)
INQUIRY ORDER
WHEREAS I have on my own accord decided that an inquiry be held into the- by-laws;
working and financial conditions and;
the conduct of management committee, and past or present members or officers of Busia County Assembly Sacco CS!
14684 and in accordance with section 58 as read together with section 73 of the Co-operative Societies Act, Cap. 490, laws of Kenya.
Now therefore. I authorize (1) Stephen Wambugu Kamau, Senior
Assistant Co-operative Officer, Nairobi Headquarters and (2) Simon
Ireri, Senior Co-operative Auditor, Kitui County, to hold an inquiry within thirty (30) days at such place and time as may be expedient and duly notified by them. The attention of all officers and members of the society is directed to the following sections of the Co-operative societies Act.
Section 60 (1) - Costs of inquiry
Section 60 (2) - Recovery of costs of expenses
Section 94 - Offences
Section 73 - Surcharges
Dated the 2nd May, 2018.
MARY N. MUNGAI, MR/48 12950 Commissioner for Co-operative Development.
GAZETFE NOTICE No.4486
REPUBLIC OF KENYA
IN THE HIGH COURT OF KENYA AT KAJIADO
INSOLVENCY CAUSE NO.1 OF 2017
IN THE MATTER OF NATURE GREEN HOLDINGS LIMITED
AND
IN THE MATTER OF THE INSOLVENCY ACT (NO. 18 OF 2015)
AND
IN THE MATTER OF THE COMPANIES ACT (Cap. 486) (Now
Repealed)
NOTICE is given, that a petition for the winding up of the above named company by the High Court of Kenya at Kajiado was on the 18th day of April, 2017, presented to the said court by Donald Muhonda
Andolo, of P.O. Box 26782-00100, Nairobi, and that the said petition is directed to be mentioned for compliance before the High Court sitting at
Kajiado, on the 15th May, 2018, and any creditor or contributory of the said company desirous to support or oppose the making of an order on the said petition may appear at the time of the mention, in the person or by his counsel, for that purpose. A copy of the petition will be furnished by the undersigned to any creditor or contributory of the said company requiring such copy on payment of the required charge for the same.
Dated the 27th April, 2018
KARANU WAWERU AND COMPANY ADVOCATES, Jerusalem Lutheran Centre, Nile Road, Off Jogoo Road, P.O Box 50144400100, Nairobi.
NB: any person who intends to appear on the hearing of the said petition must serve on, or send by post to, the above named advocates, notice in writing of his intentions so to do. The notice must state the name and address of the person or, if a firm, the name and address of the firm, and must be signed by the person or firm, or his or their advocate, if any, and must be served, or, if posted, must be sent by post in sufficient time to reach the above named not later than 4 o'clock of the 14th May, 2018.
MRI4812846
GAZETI'E NOTICE No.4487
THE INSOLVENCY ACT, 2015
GRAVITYLIGHT KENYA LIMITED
(In Liquidation)
MEMBERS VOLUNTARY WINDING-UP
NOTICE is given of the final general meeting of members in the above matter which will be held in Nairobi on 11th June, 2018, at 12.00 noon, for the purpose of having an account laid before the meeting, showing the manner in which the winding-up has been conducted and giving any explanations thereof.
The joint liquidators act on behalf of the company without any personal liability.
Dated the 7th May, 2018.
MUNIU THOITHI AND GEORGE WERU, MR!4798634 Joint Liquidators.
GAZETFE NOTICE No.4488
THE POLITICAL PARTIES ACT
(No.11 of2011)
CHANGE OF POLITICAL PARTY OFFICIALS
IN EXERCISE of the power conferred by section 20 (1) (c) of the
Political Parties Act, 2011, the Registrar of Political Parties gives notice that Orange Democratic Movement intends to change its party official as follows-
Designation Former Official Current Official
Vice-Chairperson Paul Otuoma Janet Ong'era
Vice-Chairperson Adan Keynan Thomas
Mwadeghu
11th May, 2018 THE KENYA GAZETTE 1445
Designation Former Official Current Official
Secretary-General Agnes Zani (Dr.) Edwin Sifuna
Deputy Secretary-General Elizabeth Ongoro Agnes Zani (Dr.)
Deputy Secretary-General
- Florence Mutua
Deputy Organizing Secretary Reuben Ndolo Owen Baya
Secretary for International Joyce Lay Esther Passaris
Affairs
Secretary for Special Interest Edin Wario Halima Darn (Ms.) groups
Secretary for Parliamentary Thomas Gladys Wanga
Affairs (NA) Mwadeghu
Secretary for Parliamentary Janet Ong'era James Orengo
Affairs (Senate)
Secretary for Science and Noah Akala (Dr.) Steve Mbogo
Technology
Deputy Director of Bob Njagi Noah Akala (Dr.)
Campaigns
Secretary for Special Grace Mboja Memusi Kanchori
Programmes and Social
Welfare
Secretary for National John Walukhe Justus Kizito
Security
Secretary for Disability Isaac Mwaura Nixon Kakiri
Affairs
Any person with written submissions concerning the intended change by the political party shall within seven (7) days from the date herein, deposit them with the Registrar of Political Parties.
Further enquiries can be made through Office of the Registrar of
Political Parties, P.O. Box 1131-00606, Lion Place, Waiyaki Way, 1st
Floor from 8.00 a.m. to 5.00 p.m.
Dated the 25th April, 2018.
LUCY K. NDUNGU, MR/48 12992 Registrar of Political Parties.
GAzETFE NoTIcE No. 4489
THE LABOUR RELATIONS ACT
(No. 14 of 2007)
AMENDMENT OF THE CONSTITUTION
NOTICE is given to all members of Kenya National Union of
Nurses (KNUN) pursuant to section 27 (4) of the Labour Relations Act, that a Notice of change of the Constitution of the Union has been received.
Any person or member intending to raise any objection against the amendments of the constitution of the Union is required to submit in writing any objections against the amendments of the Constitution of the Union within twenty-one (21) days from the date hereof. The amendments are open for scrutiny from the gridersigned office during working hours.
E. N. GICHEHA, MR/4143292 Registrar of Trade Unions.
GAzETrE NOTICE NO. 4490
THE VALUERS ACT
(Cap. 532)
REGISTERED AND PRACTISING VALUERS
Addendum
IN ACCORDANCE with sections 8 and 22 of the Valuers Act, it is notified for the general information that the following registered valuers, are licensed to practise valuation in the year, 2018.
Name Address Qualifications
Vincent K. Kiptoo P.O. Box 2078- B.A (Land Econ.)
00202, Nairobi Hons., MSC (ula) MiI
(HA), M.I.S.K
Lucy M. Nyambengi P.O. Box 870, Ngong B.A (Land Econ.)
Hons., M.I.S.K
Mark Okeyo Kute P.O. Box 2667 B.A (Land Econ.)
30100, Eldoret Hons.,M.I.S.K
Kennedy Kaunda P.O Box 47408- B.A (Land Econ.)
Mbulo 00100, Nairobi Hons., MJ.S.K
Francis Ochieng' P.O. Box 47408- B.A (Land Econ.)
Oketch 00100, Nairobi Hons., M.I.S.K
Consolata W. Mugo P.O. Box 270-00623 B.A (Land Econ.)
Nairobi Hons., M.I.S.K
JACINTA MUTUA, MR/48 12995 Registrar.
GAZETFE NOTICE No.4491
THE PHYSICAL PLANMNG ACT
(Cap. 286)
COMPLETION OF PART DEVELOPMENT PLAN
PDP No. SYA/103/2015/1—Existing Site for Seventh Day Adventist
Church, Marenyo
NOTICE is given that the above-mentioned part development plan was on 17th November, 2015, completed.
The part development plan relates to land situated within Yala
Township, Siaya County.
Copies of the part development plan have been deposited for public inspection at the office of the County Director of Physical Planning at
Ardhi House, Siaya and at the S. D. A. Church, Marenyo, Yala.
The copies so deposited are available for inspection free of charge by all persons interested at the office of the County Director of Physical
Planning at Ardhi House, Siaya and at the S. D. A. Church, Marenyo, Yala, between the hours of 8.00 a.m. to 5.00 p.m. on Monday to Friday.
Any interested person who wishes to make any representation in connection with or objection to the above-named part development plan may send such representations or objections in writing to be received by the County Director of Physical Planning, P.O. Box 803-40600, Siaya, within sixty (60) days from the date of publication of this notice and such representation or objection shall state the grounds on which it is made.
Dated the 24th April, 2018.
ANGELA SEWE, MR14807005 for Director of Physical Planning.
GAZErrE NOTICE No.4492
THE PHYSICAL PLANNING ACT
(Cap. 286)
COMPLETION OF DEVELOPMENT PLAN
PDP No. MKS15612018102—Exiting Site for Kenya National Highways
Authority Offices (K.E.N.HA)
NOTICE is given that the above-mentioned development plan was on 30th April, 2018, completed.
The development plan relates to land within Machakos Sub-County.
Copies of the development plan have been deposited for public inspection at the Office of the Machakos Sub-County Administrator, Machakos Sub-County and County Physical Planning Office, Machakos.
The copies so deposited are available for inspection free of charge by all persons interested at the Office of the Machakos Sub-County
Administrator, Machakos Sub-County and County Physical Planning
Office, Machakos, between the hours of 8.00 am, to 5.00 p.m.
Any interested person who wishes to make any representation in connection with or objection to the above-named development plan may send such representations or objections in writing to be received by the
Director of Physical Planning, P.O. Box 333, Machakos, within sixty
(60) days from the date of publication of this notice and such representation or objection shall state the grounds on which it is made.
Dated the 30th April, 2018:
KARI.JRUCHEGE, MR/48 12983 for Director of Physical Planning.
GAZEUE NOTICE NO. 4493
THE ENVIRONMENTAL MANAGEMENT AND
CO-ORDINATION ACT
(No.8 of 1999)
THE NATIONAL ENVIRONMENT MANAGEMENT AUTHORITY
ENVIRONMENTAL IMPACT ASSESSMENT STUDY REPORT
FOR THE PROPOSED KIPTOGOT KOLONGOLO WATER
PROJECT IN ENDEBESS AND KWANZA CONSTITUENCIES OF
TRANS NZOIA COUNTY
INVITATION OF PUBLIC COMMENTS
Pursuant to Regulation 21 of the Environmental Management and
Coordination (Impact Assessment and Audit) Regulations, 2003, the
National Environment Management Authority (NEMA) has received an
Environmental Impact Assessment Study Report for the above proposed project.
The proponent, County Government of Trans Nzoia, is proposing to develop Kiptogot—Kolongolo Water Supply Project that will serve
Kaptega, Kiptogot, Twiga, Chorlim, Endebes, Keiyo, Kwanza, Kapomboi, Kobos, Kolongolo locations within Kwanza and Endebess constituencies. Kiptogot—Kolongolo Water Project components includes: Mubere and Kaptega Water intake weirs, Mubere and Kaptega
Water Treatment Works, Raw Water Gravity Mains, Distribution Mains and 1,500 m3 Tank as Clear Water Gravity Mains.
The following are the anticipated impacts and proposed mitigation measures:
impacts Proposed Mitigation Measures
Loss of flora and • Minimize vegetation clearance to fauna construction site.
• Practicing soil conservation measures at the site.
Project acceptance • Consultation and information during open barazas.
Liquid and Solid • All wastes shall be contained on site prior waste management to disposal using appropriate storage containers.
• All waste shall be sorted at the source and disposed off in an approved manner.
• Recycle all wastes that can be recycled.
• Strict adherence to Waste Management
Regulations, 2006.
Air pollution • Reduce dust generation by wetting using water.
• Where diesel mechanical equipment are used, ensure the engines are in good working condition and properly maintained.
• Enclose the works and orient exhaust away from the nearby residences.
• Compliance to Air Quality Regulations, 2014.
impacts Proposed Mitigation Measures
Noise • Enclose drilling and all excavation sites where mechanical equipment are used.
• Ensure the work is done during the normal working hours ( 8.00 a.m.-5.00 p.m.).
• Use low noise equipment during
Construction.
• Ensure the equipment is regularly maintained to ensure they operate efficiently.
• Installation of noise and vibration monitoring systems and provide staff with.
• Adherence to Noise and Excessive
Vibration Pollution (Control) Regulations, 2009.
Management of • The water supply management to be done conflicts using guidelines for water user association from the Ministry of Environment, Water and Natural Resources.
Formation of water user association to manage the water supply kiosks.
Loss of property • Sensitization of the affected members of the acquisition of public Compensation for way leave land projectland purchase.
Diseases hazards • Sensitize the public on consequences of accumulation of stagnant water around the water kiosks.
Physical cultural • Find procedures Resident Engineer to stop resources chance works secure the site and report to the find/discoveries e.g. relevant authority for evaluation and archaeological site, decision.
historical site, graveyard discovery
Sludge generation • Dewater the sludge into pellets and apply quicklime treatment to dewatered sludge in order to create a pathogen and odour free product before disposal to a landfill.
Dry sludge in the drying beds which are normally concrete platforms filled with drainers for the leachates which are directed to the back wash channel.
Contamination of Improve chemical handling, avoid leakages water and soil and spillages.
quality
Appropnate record keeping of data on chemicals and material safety data sheets.
Interference with fish • Provision of a means to allow migration of and aquatic bio fish and other aquatic organism upstreaml diversity downstream across the weir.
Health and safety • Use of physical barriers and labeled icons to prevent and warn the public on dangers of construction activities.
• Provision of protective gears to the worker.
• Training and Provision of first aid kits to the workers.
• Training workers on environmental health and safety procedures and emergency preparedness.
• Provide for appropriate signage and warnings at work Sites.
• Insuring the workers on medical and workman compensation.
• Comply with the provisions of OSHA, 2007.
11th May, 2018 THE KENYA GAZETTE 1447
The full report of the proposed project is available for inspection during working hours at:
Director-General, NEMA, Popo Road, off Mombasa Road, P.O.
Box 67839-00200, Nairobi.
Principal Secretary, Ministry of Environment and Mineral
Resources, NHIF Building, Community, P.O. Box 30126-
00100, Nairobi.
County Director of Environment, Trans Nzoia County.
The National Environment Management Authority invites members of the public to submit oral or written comments within thirty (30) days from the date of publication of this notice to the Director-General, NEMA, to assist the Authority in the decision making process of the plan.
GEOFFREY WAHUNGU, Director-General, MR/4807071 National Environment Management Authority.
GAZETI'E NOTICE No. 4494
THE ENVIRONMENTAL MANAGEMENT AND
CO-ORDINATION ACT
(No.8 of 1999)
THE NATIONAL ENVIRONMENT MANAGEMENT AUTHORITY
ENVIRONMENTAL IMPACT ASSESSMENT STUDY REPORT
FOR THE PROPOSED DEVELOPMENT OF RIVER ESTATE
HOUSING DEVELOPMENT, REHABILITATION OF JADONGO
ACCESS ROAD AND ASSOCIATED AMENITIES ON PLOT L.R.
NO. 209/20567 NGARA AREA, NAIROBI CITY COUNTY
INVITATION OF PUBLIC COMMENTS
Pursuant to Regulation 21 of the Environmental Management and
Co-ordination (Impact Assessment and Audit) Regulations, 2003, the
National Environment Management Authority (NEMA) has received an
Environmental Impact Assessment Study Report for the above proposed project.
The proponent, Erdemann Property Limited, is proposing to put up a housing development and rehabilitate Jadongo access Road and associated amenities on plot L. R. No. 209 /20567 Ng'ara area, Nairobi
County. The components of the proposed river housing development include; 8 blocks of apartments, 34 floors plus ground and basement floors, 1632 Total number of units, 537 No. three bedroom units, 1088
No. two bedroom units, 7 No. one bedroom units, 60 No. Shops, 875
No. parking slots, underground water tank, sewer connection to Nairobi city Water and Sewerage Company Services and rehabilitation of the
Jadongo Access Road.
The following are the anticipated impacts and proposed mitigation measures:
Impacts Proposed Mitigation Measures
Encroachment and • Maintain a riparian buffer zone along the river disturbance of the as per Water Resources Authority
Nairobi River recommendations.
• No development activity shall be undertaken within the full width of the river or within the riparian reserve as per Water Quality
Regulations, 2006.
• Routine check-ups and monitoring of the
WWTP to avoid leakage and blockage.
River flooding Plant environmentally friendly trees on the riparian reserve to increase interception and storage while reducing surface run off.
• Liaise with Water Resources Authority weigh the option of constructing a levee which can confine the flow.
• Liaise with Water Resources Authority to decommission the weir that is obstructing the smooth running of the river water on the site frontage as it does not serve any purpose.
Impacts Proposed Mitigation Measures
Increased • Source building materials from suppliers who exploitation of raw use environmentally friendly processes in materials their operations.
• Ensure accurate budgeting and estimation of actual construction material requirements to ensure that the least amount of material necessary is ordered.
• Ensure that damage or loss of materials at the construction Site are kept minimal through proper storage.
• Use at least 5%-10% recycled refurbished or salvaged materials to reduce the use of raw materials and divert material from landfills.
Solid waste • Through accurate estimation of the sizes and generation quantities of materials required, order materials in the sizes and quantities they will be needed, rather than cutting them to size, or having large quantities of residual materials.
• Ensure that construction materials left over at the end of construction period will be re-used in other projects rather than being disposed off.
• Provide facilities for proper handling and storage of construction materials to reduce the amount of waste caused by damage or exposure to the elements.
• Use building materials that have minimal or no packaging to avoid the generation of excessive packaging waste.
• Re-use packaging materials such as cartons, cement bags, left over steel metals and plastic containers to reduce waste at the site.
• Strict adherence to Waste Management
Regulations, 2006.
Ecosystem • Ensure proper demarcation and delineation of disturbance the project area to be affected by construction works.
• Specify locations for trailers and equipment, and areas of the site which should be kept free of traffic, equipment, and storage.
• Designate access routes and parking within the Site.
Run off and soil • Create storm water management practices, erosion such as piping systems or retention ponds or tanks, which can be carried over after the building is complete.
• Apply soil erosion control p'easures such as leveling of the project site to reduce run-off velocity and increase infiltration of storm water into the soil.
• Ensure that construction vehicles are restricted to existing graded roads to avoid soil compaction within the project site.
• Ensure that any compacted areas are ripped to reduce run off.
Air pollution . Ensure strict enforcement of on-site speed limit regulations.
• Sprinkle water on graded access routes each.
• Ensure that all the construction materials transportation vehicle are properly covered especially during transportation of materials to site day to reduce dust generation by construction vehicles.
• Ensure proper planning of transportation of materials to ensure that vehicle fills are impacts Proposed Mitigation Measures increased in order to reduce the number of trips done per vehicle or the number of vehicles on the road during the day.
• Strict adherence to Air Quality Regulations, 2014.
Traffic congestion • Proponent to engage KeNHA in developing and accidents the Jadongo Access Road.
• A traffic marshal to be stationed along the entry point within the project boundary to control vehicles during transportation of materials.
• Planned deliveries to make sure they do not coincide with heavy traffic.
• Provision of separate traffic routes for pedestrians and vehicles during operation phase.
• Security checks to be conducted inside the compound not at the entrance.
• Provision of designated entry and exit points.
Noise pollution • Sensitize construction vehicle drivers and machinery operators to switch off engines of vehicles or machinery not being used.
• Ensure that construction machinery are kept in good condition to reduce noise generation.
• Ensure that all generators and heavy duty equipment are insulated or placed in enclosures to minimize ambient noise levels.
• Adherence to Noise and Excessive Vibration
Pollution (Control) Regulations, 2009.
Exploitation and • Ensure no waste water from the construction pollution of water site is disposed especially in raw form that resource might affect the ecosystem.
• Promote recycling and reuse of water as much as possible.
• Promptly detect and repair of water pipe and tank leaks.
Effluent emissions • Provide adequate means for handling all the liquid waste generated by construction workers.
• Monitor effluent quality regularly to ensure that the stipulated discharge rules and standards are not violated.
Structural integrity Undertake geotechnical survey.
of residential blocks
. Security consideration.
Violation of rules • Ensure that all building plans are approved by and the County Government and the County regulations/mishaps Occupational Health and Safety Office.
• Registration of the premises under the
Factories and Other Places of Work Act, Cap
514, laws of Kenya is mandatory.
• A general register should be kept within the facility as stipulated in sec. 62 (1) of the
Factories and Other Places of Work Act.
• The abstract of the Factories and Other Places of Work Act must be displayed at prominent places within the site.
• Develop, document and display prominently an appropriate safety and health policy for construction works.
Sanitary • Ensure that conveniently accessible, clean, conveniences orderly, adequate and suitable washing facilities, sanitary conveniences are provided and maintained in within the site.
• Provide and maintain, for the use of all impacts Proposed Mitigation Measures workers whose work is done standing, suitable facilities for sitting sufficient to enable them to take advantage of any opportunity for resting which may occur in the course of their employment.
• All work places must be kept in a clean state, and free from effluvia arising from any drain, sanitary convenience or nuisance.
• Provision for repairing and maintaining of hand tools must be in place.
Loss of biodiversity . Maintain a riparian buffer zone as per
WRMA recommendation.
• Clearance of vegetation should be done in necessary areas only.
• Carry Out environmental compensation where harm cannot be avoided by planting of indigenous plants.
Occupational health Design suitable documented emergency and safety preparedness and evacuation procedures to be used during any emergency. Such procedures must be tested at regular intervals.
• Adequate provisions in place to immediately stop any operations where there in an imminent and serious danger to health and safety and to evacuate workers.
• Adequate first aid arrangements. Well stocked first aid box which is easily available and accessible should be provided within the premises.
• Ensure that workers at the construction site and other dusty sites are adequately protected from inhalation of substantial quantities of dust through provision of suitable protective gear (e.g. nose masks).
• Ensure that construction workers are provided with an adequate supply of wholesome drinking water which should be maintained at suitable and accessible points.
• Ensure adherence to OSHA , 2007
The full report of the proposed project is available for inspection during working hours at:
Director-General, NEMA, Popo Road, off Mombasa Road, P.O.
Box 67839-00200, Nairobi.
Principal Secretary, Ministry of Environment and Mineral
Resources, NHIF Building, Community, P.O. Box 30126-
00100, Nairobi.
County Director of Environment, Nairobi City County.
The National Environment Management Authority invites members of the public to submit oral or written comments within thirty (30) days from the date of publication of this notice to the Director-General, NEMA, to assist the Authority in the decision making process of the plan.
GEOFFREY WAHUNGU, Director-General, MR148 12990 National Environment Management Authority.
Dated the 23rd April, 2018.
MARGARET BAARO,
for Registrar of Companies.
Extracted Entities (1)
previous_gazette_ref
4483
Details
- Act / Legislation
- THE COMPANIES ACT
- Reference
- No. 17 of 2015
- Section
- section 897 (3)
- Signed By
- MARGARET BAARO
- Title
- for Registrar of Companies
- Ministry
- Ministry of Environment, Water
- Date Signed
- 23rd April 2018
- Page
- 35
- Extraction Method
- regex
Source Gazette
Vol. CXX No. 56
Published 26th January 2018