GAZETTE NOTICE NO. 11132
GAZETTE NOTICE NO. 11132
THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
(No. 8 of 1999)
REGULATION
Pursuant to Regulation 21 of the Environmental Management and
Co-ordination (Impact Assessment and Audit) Regulations, 2003, the
National Environment Management Authority (NEMA) has received an Environmental Impact Assessment Study Report for the above proposed project.
The proponent, Taifa Gas kenya Limited, is proposing to construct
2X 3000 MT Liquefied Petroleum Gas aboveground spherical tanks, a tanker filling station and perimeter wall fencing and attendant SMP works. The project will occupy a surveyed area of 2.29 ha. ERC approved trucks will be filled at the site for onward transmission to different parts of the country.
The following are the anticipated impacts and proposed mitigation measures.
Impacts Proposed Mitigation Measures
Solid waste generation
• Develop strategies(waste management plan) for management of specific waste streams prior to construction phase.
• Stockpile and salvage reusable and recyclable wastes, such as timber.
• Where practical, wastes (e.g., scrap metal) will be segregated and reused/recycled.
• All litter and general waste disposal will be at a local municipal landfill utilizing an approved waste contractor.
• Records of all controlled wastes stored, and removed from site will be maintained.
• Safety and response training will be provided for all personnel.
• Materials and equipment for responding to hazardous spill incidents will be provided and maintained.
Air quality • Relevant legislative and Kenya Standard design requirements will be adhered to where appropriate.
• Vehicles and machinery will be regularly maintained.
• Maintenance activities requiring purging of gas will be minimized and conducted under favorable Meteorological conditions (to facilitate rapid atmospheric dispersion).
• Install standard leak detectors for hazardous area installations.
• Best practice measures are implemented to minimize the potential for dust to be generated and escape off-site.
Noise quality • Construction activities near sensitive places shall be restricted to normal working hour unless otherwise agreed with the potentially affected stakeholder(s).
• Relevant legislative and Kenya Standard design requirements will be adhered to where
Impacts Proposed Mitigation Measures appropriate.
• Adequate community notice of any scheduled, atypical noise events will be provided.
• Equipment will be fitted with noise control devices where possible and appropriate.
Soil quality • Minimizing the areas to be excavated.
• Re-vegetating disturbed areas once construction and demolition works are completed; during construction and decommissioning phases respectively.
• Ensuring that vehicles/equipment used during construction and decommissioning.
• Phases are serviced regularly.
Water quality • Develop strategies for management of water resources.
• Regular checking and maintenance of all plant and machinery to minimize the risk of fuel or lubricant leakages.
• Storing hydrocarbons, fuels, lubricants and chemicals to be used in bunded and lockable oil storage tanks, with hoses and gauges kept within the bund.
• Leaving vegetation in-situ wherever possible and re-vegetation of bare soil before the next rainy season.
• Exposed ground and stockpiles will be minimized to reduce silty runoff, and if necessary measures such as geotextiles will be used to shield spoil mounds.
• Preventing wet concrete and cement from entering watercourse; Stockpiles to be kept away from water courses.
Health and safety • Development and implementation of occupational health and safety plan. The Plan will cover on the following.
• Formulation of EHS Management system.
• Development of health and safety programmer.
• Risk assessment and health monitoring for workers Contractor selection criteria in relation to health and safety.
• Job description to include health and safety requirements.
Social economic impacts
• During contruction phase,the proponent will be encouraged to source labor from the community where possible.
• During operation phase, the Proponent will utilize their existing human resource policy in hiring personnel required to operate the plant.
• The proponent will ensure that hiring of personnel follows the Kenya Labour Laws and that there will be no discrimination on the grounds of race, ethnicity, religion, gender, and political affiliation.
The full report of the proposed project is available for inspection during working hours at:
(a) Director-General, NEMA, Popo Road, off Mombasa Road, P.O. Box 67839–00200, Nairobi.
(b) Principal Secretary, Ministry of Environment and Mineral
Resources, NHIF Building, Community, P.O. Box 30521, Nairobi.
(c) County Director of Environment, Kilifi County.
THE KENYA GAZETTE 26th October, 2018
3784 3784
The National Environment Management Authority invites members of the public to submit oral or written comments within thirty (30) days from the date of publication of this notice to the
Director-General, NEMA, to assist the Authority in the decision making process of the plan.
GEOFFREY WAHUNGU, Director-General, MR/5342124 National Environment Management Authority.
Dated the 26th October, 2018.
GEOFFREY WAHUNGU,
Director-General, National Environment Management Authority.
Extracted Entities (1)
previous_gazette_ref
11132
Details
- Act / Legislation
- THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
- Reference
- No. 8 of 1999
- Signed By
- GEOFFREY WAHUNGU
- Title
- Director-General, National Environment Management Authority
- Ministry
- Ministry of Environment And Mineral
- Date Signed
- 26th October 2018
- Page
- 89
- Extraction Method
- regex
Source Gazette
Vol. CXX No. 130
Published 20th February 2018