Back
COMPLETION OF DEVELOPMENT PLAN 100% confidence via regex

GAZETTE NOTICE NO. 13138

GAZETTE NOTICE NO. 13138

THE PHYSICAL PLANNING ACT

(No.8 of 1999)

COMPLETION OF DEVELOPMENT PLAN


NOTICE is given that preparation of the above mentioned part development plan was on 13th December, 2081 completed.. The part development plan relate to land situated within Ongata Rongai Township. Copies of the part development plan as prepared have been deposited for public inspection at the offices of th County Executive Committee Member for Lands, Physical Planning and Urban Development and County Physical Planning Officer, Kajiádo. The copies so deposited are available for inspection free of charge by all persons interested at the offices of the offices of the County Executicve Committee Member for Lands, Physical Planning and Urban Development and County Physical Planning Officer, Kajiado between the hours of 8.00 am. and 5.00 p.m. Any interested person/s who wishes to make any representation in connection with or objection to the above part development plans may send such representations or objections in writing to be received by the County Physical Planning Officer, P.O. Box 11, Kajiado, within sixty (60) days from the date of publication of this notice and such representation or objection shall state the grounds on which it is made. Dated the 13th December, 2018. I. K. PARASHINA, MR/5800338 for Director of Physical Planning. GAZETFE NoItcE No. 13139 THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT (No.8 of 1999) THE NATIONAL ENVIRONMENT MANAGEMENT AUTHORITY ENVIRONMENTAL IMPACT ASSESSMENT STUDY REPORT FOR THE PROPOSED RESIDENTIAL DEVELOPMENT ON PLOT NO. NAIROBI/BLOCK 93/1574 LOCATED ALONG SONIA LANE IN SOUTH B AREA OF NAIROBI CITY COUNTY INVITATION OF PUBLIC COMMENTS Pursuant to Regulation 21 of the Environmental Management and Co-ordination (Impact Assessment and Audit) Regulations, 2003, the National Environment Management Authority (NEMA) has received an Environmental Impact Assessment Study Report for the above proposed project. The proponent, Trio Properties Limited, is proposing to constiiict an eleven floor residential development comprising of 176No. studio units, 24No. parking bays, lifts, gym, lap poo1, associated facilities and amenities on Plot No. Nairobi/Block 93/1574 located along Sonia Lane in South B Area of Nairobi City County. The following are the anticipated impacts and proposed mitigation measures: Impacts Proposed Mitigation Measures Storm water Proper installation of drainage structures/facility. • Install cascades to break the impact of water flowing in the drains. • Ensure efficiency of drainage structures through proper design and maintenance. • Provide gratings to the drainage channels. Air pollution • Sprinkling of water on dusty areas regularly. • Careful screening of construction site to contain and arrest construction related dust. • Daily enclosing, covering and watering of exposed stockpiles e.g. sand. • Ensure construction machinery and equipment are well maintained to reduce exhaust gas emission. • All personnel working on the project will be trained prior to starting construction on methods for minimizing air quality impacts during construction. • Drivers of construction including bulldozers, earth-movers etc. will be under strict instructions to minimize unnecessary trips jind minimize idling of engines. Excessive noise • Construction activities to be restricted within and vibration the stipulated time. • Use of suppressors or noise shields on noisy equipment for instance corrugated iron sheet structures. • Sensitize operators of construction machinry on effects of noise. • Trucks used at construction site shall be routed away from noise sensitive areas where feasible. • Maintain plant equipment to suppress frictional noiie. • Workers in the vicinity or involved in high- level noise to wear PPE. • Minimize vibrations by using hi-tech equipment that produces lesser vibrations during excavation. Impacts Proposed Mitigation Measures • Comply. with EMCA (Noise and Excessive '. Vibration Pollution Control) Regulations, 2009. solid and liquid q Segregate the waste at the site. Waste • Ensure proper disposal of construction waste to approved sites. • Engage jervices of a registered NEMA waste handler to dispose the waste. • Covering of the trucks during transportation all the building materials and waste. • Sensitize workgrs on the reuse of materials where appropriate. • Provision of adequate and appropriate sanitary facilities for the construction workers. • Proper decommissioning of all the sanitary facilities. Health and safety . Construction work shall be limited to daytime only. • Workers to be adequately insured against accidents. • All workers will be sensitized before construction begins on how to control accidents related to construction. • Keep record of the public emergency service telephone numbers including: police, fire brigade, ambulance at strategic points. • Provide first aid kits at strategic places in the site. • All workers to wear protective gear during construction e.g. helmets. • Provide clean water and food to the workers. • Ensure that the workers are registered with NHIF/NSSF and remits appropriate fees. Traffic Employ traffic marshals to control traffic in and out of site. • Ferry building materials during off-peak hours. • Put up traffic signage at the site/entrance to notify motorists and general public about the development. • Enforce speed limits for construction vehicles especially along the roads leading to the site. Ensure that the vehicles comply with axle load limits The full report of the proposed project is available for inspection during working hours at: Director-General, NEMA, Popo Road, off Mombasa Road, P.O. Box 67839-00200, Nairobi. Principal Secretary, Ministry of Environment and Mineral Resources, NHIF Building, Community, P.O. Box 30521, Nairobi. County Director of Environment, Nairobi City County. The National Environment Management Authority invites members of the public to submit oral or written comments within thirty (30) days from the date of publication of this, notice to the Director-General, NEMA, to assist the Authority in the decision making process of the plan. GEOFFREY WAfflJNGU, Director-General, MR/5800010 National Environment Management Aurhority. GAZEYFE NOTICE No. 13140 KAKUZI PLC CLOSURE OF ROADS NOTICE is given that all private roads and footpaths on the following L.R. Nos. owned by this company as noted below will be closed to the public for a period of twenty-four (24) hours from midnight on Tuesday, 25th December, 2018. Kakuzi Estates (Thika/Makuyu) L.R. Nos: 3534, 3558, 3568, 3569/1, 3569/2, 4741, 4883, 6862, 6871, 10731, 10739/2, 11674, 1363/19, 1363/20, Makuyu/Kariaini/Block 111/124 and 27343. There will be no access to any member of the public through the roads and footpaths during the said period. BENJAMIN OKIRING, MR/58004850 for Kakuzi PLC.

Dated the 13th December, 2018.

I. K. PARASHINA,

for Director of Physical Planning.

Extracted Entities (1)

previous_gazette_ref

13138

Details

Act / Legislation
THE PHYSICAL PLANNING ACT
Reference
No.8 of 1999
Signed By
I. K. PARASHINA
Title
for Director of Physical Planning
Date Signed
13th December 2018
Page
57
Extraction Method
regex