Back
REGULATION 100% confidence via regex

GAZETTE NOTICE NO. 12198

GAZETTE NOTICE NO. 12198

THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT

(No. 8 of 1999)

REGULATION


Pursuant to Regulation 21 of the Environmental Management and Co-ordination (Impact Assessment and Audit) Regulations, 2003, the National Environment Management Authority (NEMA) has received an Environmental Impact Assessment Study Report for the above proposed project. The proponent, Ministry of Agriculture and Irrigation, is proposing to construct Kaptionyy Concrete Dam of height 18m and capacity 211,000m3 as main dam and Yeptos Tulwongoi Concrete Dam of height 19m and capacity 219,795.83m3 as check dam. 250mm cement lined steel pipe and length 5.5km will convey water from the dam to the intake located adjacent to the weir at Kiboi Irrigation Headwork. The project will increase food security in Barwasa Division through availing enough irrigation water to Barwesa and Kiboi Irrigation schemes. The following are the anticipated impacts and proposed mitigation measures: Impacts Proposed Mitigation Measures Displacement • Compensation at current market rates. • Sensitization. • Proper land use. • Proper supervision. Increased erosion downstream of the dam • Allow schematic falling and rising of the dam level. • Use Gabions if found appropriate. • Plant erosion resistant vegetation. • Undertake proper design of spillway. Shoreline erosion • Control of shore use. • Shore zoning. • Soil conservation measures in certain sensitive shoreline sectors. • Appropriate management of levels and flows. Loosening of soil • Practice good farming. • Undertake crop rotation. • Undertake mulching. • Use green manure. Loose of soil fertility/poor harvest • Use fertilizer. • Undertake crop rotation. • Undertake mulching. • Use green manure. Organic pollution • Use gabions to control erosion. • Avoid digging on steep hills. • Undertake terracing. • Practice good agricultural practice. THE KENYA GAZETTE 23rd November, 2018 4182 4182 Impacts Proposed Mitigation Measures Agro-chemicals • Use right dose. • Use recommended chemicals. • Use rotational agriculture. Safety • Use proactive gear. • Sensitization. • Use experienced staff. Gas emissions • Use vehicles that are below 10 years. • Repair any fault on exhaust. • Use machine when you can’t avoid. • Use machines with fitted filter. • Use undultered fuel. Conflicts • Observe local custom. • Use appropriate channel. • Report to the relevant institution. Noise pollution • Work during the day. • Avoid unnecessary hooting. • Avoid playing loud music. • Observe NEMA Standard on the same. Dust pollution • Spray water periodically. • Clean the road. • Compact temporary road to avoid dust emission. The full report of the proposed project is available for inspection during working hours at: (a) Director-General, NEMA, Popo Road, off Mombasa Road, P.O. Box 67839–00200, Nairobi. (b) Principal Secretary, Ministry of Environment and Mineral Resources, NHIF Building, Community, P.O. Box 30521, Nairobi. (c) County Director of Environment, Baringo County. The National Environment Management Authority invites members of the public to submit oral or written comments within thirty (30) days from the date of publication of this notice to the Director-General, NEMA, to assist the Authority in the decision making process of the plan. GEOFFREY WAHUNGU, Director-General, MR/5555448 National Environment Management Authority.

Dated the 23rd November, 2018.

GEOFFREY WAHUNGU,

Director-General, National Environment Management Authority.

Extracted Entities (1)

previous_gazette_ref

12198

Details

Act / Legislation
THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
Reference
No. 8 of 1999
Signed By
GEOFFREY WAHUNGU
Title
Director-General, National Environment Management Authority
Date Signed
23rd November 2018
Page
69
Extraction Method
regex