GAZETTE NOTICE NO. 33
GAZETTE NOTICE NO. 33
THE WATER ACT
(No. 43 of 2016)
RESTORATION
Pursuant to powers granted under section 156 (3) (a) and (b) of the
Water Act, 2016 as read together with Rule 37 (3) of The Water
(Services Regulatory) Rules, 2012, Lake Victoria North Water
Services Board (LVNWSB), do hereby give a one month notice from the date of this communication to all existing and potential customers of Nzoia Water Services Company Ltd that the structure of approved tariff for water services for the financial year 2017/18 to 2019/20 is as follows:
1.0 Water Tariff Structure for Year 2017/18 to 2019/20
Current Approved
Tariff Tariff
(KSh/m3) (KSh/m3)
Residential/Government Flat rate ksh Flat rate KSh institutions 0-6 222.00 300.00
7-20 55.40 70
21-50 72.02 77
51-100 88.64 89
101-300 110.80 120
Above 300 144.04 150
Flat rate Flat rate KSh
Commercial/industrial 0-6 KSh 222.00 330.00
7-20 55.40 75
21-50 72.02 82
51-100 88.64 94
101-300 110.80 125
Above 300 144.04 155
Standpipes/Kiosks 35 35
Public schools, Universities and
Colleges
0-600 44.32 55
601-1200 55.40 72
Above 1200 99.72 99
1.1 Sewerage Tariff
Sewerage is charged at 75% of the water billed for all customers with a sewer connection
(a)Disconnected water accounts shall be charged based on the average of the last three months' sewer charges before the disconnection.
(b)Customers with no water connection but connected to the sewerage system-
(i)Domestic Customers: flat rate of Ksh. 200 per month
(ii)Government, Schools, Multidwelling units, Gated
Communities and Commercial/Industrial customers: 75% of volume of water used as per the metered source of water.
2.0 Miscellaneous Charges
Standing Charges Per Month
Meter size Approved Charge (KSh.)
1/2 inches
3/4 inches
1 inch
1 1/2 inches
2 inches
3 inches
4 inches
6 inches
'8 and above
Water Deposit
Category of consumer
Domestic
2,500
Water Kiosks
5,000
Commercial
25,000
Industries
50,000
Domestic Construction
25,000
Commercial construction
50,000
Other Charges
New Water Connection fee, 1/2 inch to 1 inch
2,500
New Water Connection fee, I
1/2 to 3 inch
7,500
New Water Connection fee, above 3 inch
15,000
Illegal connection-
Commercial, Industry, 100,000 plus estimated consumption
Construction(Fraud) during the period of the illegality
Illegal connection (Fraud) —
30,000 plus estimated consumption
Domestic during the period of the illegality
2,500, 5,000 respectively per tanker
Tanker — 8000, 16,000 litres within WSP area for all consumers
Customer Category
Consumption
Block in m3
5th January, 2018 THE KENYA GAZETTE 17
Standing Charges Per Month
Meter size
Approved Charge (KSh.)
Replacement of stolen or damaged meters
100% of the market cost of the meter
Sewer Connection-
Residential
5,000
Sewer Connection-
Commercial 7,500
Sewer Connection- Industrial 15,000
Private sewer unblocking(per manhole)
2,500
Sewer Reconnection
15,000
Exhauster Services
5,000 for other customers and 4,000.
(Company Exhauster) for informal settlements
Private Exhausters
(Dumping into the company's sewer system)
15,000. per Truck per month
Charges equal to those of illegal
Illegal connection sewerage connections of water per category.
Surcharge for tampering with meters (this to include meter removal, reversing of meter, etc)
Surcharge for direct suction of water from the supply line using a pump
10,000
For special reading of a meter 200
For cutting off the supply at the request of the consumer
For turning on the supply otherwise than in respect of a first connection
For turning on the supply after a disconnection for non payment
3.0 Analysis of Cost Structure
Below is the summary of the cost structure that makes up the total costs incurred by the Water Service Provider (WSP):
Expenditure Item 2017/18 2018/19 2019/20
Operations 252,020,224 263,084,794 270,424,469
Maintenance 10,519,617 11,045,597 11,597,877
Regulatory Levy 4,744,230 5,185,769 5,814,687
WSB
Administrative Fees 42,504,987 44,705,859 48,212,904
Loan Repayment 132,439,444 131,235,252 139,362,590
Minor Investments 4,000,000 7,500,000 4,000,000
Total Costs 446,228,502 462,757,272 479,412,527
Projected Rev.
(KSh.) 450,701,895 492,648,064 552,395,258
O&M Cost
Coverage (%) 101% 106% 115%
4 Conditions to the tariff:
i. Tariff period
The tariff adjustment approval is recommended for the remaining period of 2017/18 financial year and 2018/19 and 2019/20 financial years, during which time all the assumptions made in the tariff projections will be monitored and the WSP (NZOWASCO) will be expected to meet the targets below:
Target 2017/18 2018/19 2019120
Water Coverage (%) 82% 83% 84%
Water quality standards 100% compliance with the quality
(%) standards
Non Revenue Water 27% 23% 20%
(%)
Hours of Supply (Hrs) 22 23 23
Staff per 1000 connections
6 5 5
Metering ratio (%) 97 98 100
Collection Efficiency 95 95 95
(%)
Resale at Kiosk Regulate resale by kiosk vendors at KSh. 1 per 20-litres. Tariffs at kiosks must be displayed at strategic points for public awareness with prominent display of
NZOWASCO and WASREB logos with the words WASREB APPROVED' ii.Personnel Costs:
The WSP shall progressively work towards attaining the sector benchmark of the proportion of personnel cost to the Operations and
Maintenance (O&M) cost by 2019/20.
Year 2017/18 2018/19 2019/20
Amount in KSh. 113,800,550 114,200,884 114,613,227
% of O& M 37% 35% 34% iii.Investments:
The County Governments of Bungoma and Trans Nzoa, LVNWSB and WASREB shall monitor the funds set aside for investment in the following pipelines:
Monitoring the project cycle of all the projects is necessary and the projects here in shall be publicized.
Kitale
St. Joseph - Birunda 6km, 4" Upvc
Legacy - Bikeke 2.5km, 3"
Upvc
Bungoma
Muskoma - Mumias 3km, 4" Upvc
Total
2017/2018
2,500,000
2,500,000
2018/2019
3,500,000
3,500,000
2019/20
4,000,000-
4,000,000 iv.Debt Repayment:
Open and operate a bank account for debt repayments which shall receive no less than the following amounts per annum to be credited on a monthly basis. The amount shall be disbursed form the account as per the loan repayment agreements.
Year 2017/18 2018/19 2019/20
Amount in KSh.
v.Regulatory levy:
132,439,444 131,235,252 139,362,590
The WSP shall remit the regulatory levy on monthly basis being 1% of the billing as per Legal Notice No. 36 of 2008.
vi.Performance Evaluation:
Performance targets to be met and ascertained by the County
Governments of Bungoma and Trans Nzoia, LVNWSB and WASREB, at the end of the 1st year of the tariff period. Non achievement of the all targets without justifiable cause shall lead to revision of the tariff for the protection of the consumers including other measures which shall be ordered by WASREB.
vii.SPA Revision:
The clause on tariffs and licensee remuneration levy which is the equivalent of Clause 9 of the Model Service Provision Agreement
(SPA) on "Tariffs, Remuneration and Financial Arrangements") shall be amended to conform with the approved tariffs: The agent shall remit fixed annual payments to Licensee, which shall be paid on equal monthly rates, at the end of respective months according to the amount in section 3.
Dated the 20th December, 2017.
ANTHONY KISAKA, Ag. Chief Executive Officer, Lake Victoria North Water Services Board.
GAZE t t E NOTICE No. 34
THE ENVIRONMENTAL MANAGEMENT AND
CO-ORDINATION ACT
(No. 8 of 1999)
18 THR wiyA cy4?vr1'E
5th January, 2018
NOTICE TO THE PUBLIC TO SUBMIT COMMENTS ON AN
ENVIRONMENTAL IMPACT ASSESSMENT STUDY REPORT
FOR THE PROPOSED CONSTRUCTION OF RESIDENTIAL
APARTMENTS ON PLOT L.R. NO. 209/402/5 ALONG NGONG AT
HEKIMA GARDENS, ADAMS ARCADE AREA, IN NAIROBI
COUNTY
Pursuant to Regulation 21 of the Environmental Management and Co- ordination ,(Impact Assessment and Audit) Regulations, 2003, the
National Environment Management Authority (NEMA) has received an
Environmental Impact Assessment Study Report for the above proposed project.
The Proponent, Ndemi Garden Limited, is proposing to develop a fourteen (14) storied residential apartments with all attendants facilities along Ngong Road approximately 1 km from Adams Arcade. The project will include construction of four (4) blocks of fourteen (14) storied residential apartments with a total of two hundred and twenty four (224) units.
TI4 following are the anticipated impacts and proposed mitigation measures:
Impacts
Proposed mitigation measures
Distortion of
• Harmonize building scale with existing neighbourhood development in neighborhood.
aesthetic image
• Harmonize detail, material and finishes for roofs and walls with existing development in the neighborhood.
Extraction and use of • Availability and sustainability of the building materials extraction sites as they are non-renewable in the short term.
•Landscape changes e.g. displacement of animals and vegetation, poor visual quality and opening of depressions on the surface.
Collapse of building • Ensuring Building Strength and stability.
during construction • Use of appropriate construction materials and reinforcements as per specifications.
•Ensuring building components are as per designs.
•Proper supervision.
•Ensure proper timelines are followed.
Disturbance of traffic • Proper signage.
flow
• Awareness creation.
•Education to truck drivers.
•Dropping of materials during off-peak hours.
Soil excavation
• Excavate only areas to be affected by leading to site buildings.
disturbance
• Dumping of excess excavated materials to sites designated by NEMA and County
Authority.
•Restoration of sites excavated.
Soil erosion
• Create and Maintain soil traps and embankments.
•Landscaping after completion of construction.
Noise pollution and • Ensure use of serviced and greased equipment vibration
• Switch off engines not in use.
•Construction work to be confined to between
8 a.m. to 6 p.m.
•Ensure use of earmuffs by machine operators.
•Adherence to Noise And Excessive Vibration
Pollution (Control) Regulations, 2009.
Air quality
• Water sprinkling of driveways or the use of biodegradable hydrant e.g. Terrasorb polymer will reduce dust emission during construction.
•Ensure servicing of vehicles regularly.
•Adherence to Air Quality Regulations, 2014.
Solid waste
• Ensure waste materials are disposed of on generation county Authorities and NEMA approved sites.
•Ensure re-use of materials that can be re- used.
•Use of the 3rs — Reduce, Re-use, Re-cycle.
•Adherence to Waste Management
Regulations, 2006.
Impacts Proposed mitigation measures
Energy consumption • Use electricity sparingly since high consumption of electricity negatively impacts on these natural resources and their sustainability.
•Use of stand by generators.
Excessive water use • Excessive water use may negatively impact on the water source and its sustainability.
Liquid waste
• Regular inspection and maintenance of the generation and waste disposal systems during the operation management phase.
•Connection to sewer system.
•Strict adherence to Water Quality
Regulations, 2006.
Security
• the facility will be manned by security guards.
•There will be 24 hrs. surveillance.
•Presence of perimeter wall.
Occupational health • Education and awareness to all construction and safety workers.
•Ensure use of appropriate personal protective clothing.
•Provide first-aid kits on site.
•Ensuring Building Strength and stability
•Proper supervision.
•Proper signage and warning to public of heavy vehicle turning.
•Ensuring building strength and stability.
•Ensure strict compliance with the
Occupational Safety and Health Act (OSHA)
2007.
The full report of the proposed project is available for inspection during working hours at:
(a) Director General, NEMA, Popo Road, off Mombasa Road, P.O. Box 67839-00200, Nairobi.
•(b) Principal Secretary, Ministry of Environment and Natural
Resources, N.H.I.F. Building, Community, P.O. Box
30126-00100, Nairobi.
(c) County Director of Environment, Nairobi City County.
The National Environment Management Authority invites members of the public to submit oral or written comments within thirty (30) days froth the date of publication of this notice to the Director General, NEMA, to assist the Authority in the decision-making process of the plan.
GEOFFREY WAHUNGU, Director-General, MR/4167402
National Environment Management Authority.
Dated the 20th December, 2018.
ANTHONY KISAKA,
Ag. Chief Executive Officer, Lake Victoria North Water Services Board.
Extracted Entities (1)
previous_gazette_ref
33
Details
- Act / Legislation
- THE WATER ACT
- Reference
- No. 43 of 2016
- Section
- section 156 (3) (a)
- Signed By
- ANTHONY KISAKA
- Title
- Ag. Chief Executive Officer, Lake Victoria North Water Services Board
- Ministry
- Ministry of Environment And Natural
- Date Signed
- 20th December 2018
- Page
- 14
- Extraction Method
- regex
Source Gazette
Vol. CXX No. 2
Published 5th January 2018