Back
REGULATION 100% confidence via regex

GAZETTE NOTICE NO. 2530

GAZETTE NOTICE NO. 2530

THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT

(No. 8 of 1999)

REGULATION


Pursuant to Regulation 21 of the Environmental Management and Co-ordination (Impact Assessment and Audit) Regulations, 2003, the National Environment Management Authority (NEMA) has received an Environmental Impact Assessment Study Report for the above proposed project. The proponent, Vipingo Development Limited, is proposing to construct a commercial centre which will comprise a supermarket, restaurant, banking services, medical facilities, gym, bar play area, hotel office, car pack, filling station, a car wash and other associated facilities and amenities on plot L.R. No. 5025/97 in Vipingo, along Mombasa—Malindi Highway, Kilifi County. The following are the anticipated impacts and proposed mitigation measures: Proposed Mitigation Measures • Source building materials from local suppliers who use environmentally friendly processes in their operations. • Ensure accurate budgeting and estimation of actual construction material requirements. • The contractor ill commit to extensive use of recycled raw materials as will be appropriate and in a manner that does not compromise the safety of the developer. • Ensure that damage or loss of materials at the construction site is kept minimal through proper storage. • Provide means for handling sewage generated at the premises. • Conduct regular checks for pipe blockages or damages. • Monitor effluent quality regularly to ensure that the stipulated discharge rules and standards are not violated. • Design and construct water treatment plant/s so as to recycle wastewater generated from the development. • Comply with the provisions of Environmental Management and Co-ordination (Water Quality) Regulations, 2006. • Consider harvesting and recycling storm water for utilization within the project site. • Disposal of storm water that will not be harvested will be via surface drain off. • Apply soil control measures such as levelling the project site. • Ensure that any compacted areas are ripped to reduce run-off. • Sensitize residents in use of energy efficiently. • Ensure that construction vehicles are restricted to existing graded roads to avoid soil compaction within the project site. • Prompt detect and repair of the water fixtures and fittings. Energy demand • Use of•solar energy as an alternative source of energy. • Install and routine maintenance of energy efficient fixtures and fittings. • Turn off the machinery and equipment when nbt in use. • Put off all the lights immediately when not in use. Increased traffic • Ferry building materials during off-peak hours. • Employ traffic marshals to control traffic in and out of site. • Provide billboards at the site/entrance to notify motorists and the general public about the proposed project. • Enforce speed limits for construction vehicles especially along the adjacent roads. • Develop a traffic management plan to ensure that the site vehicles do not interfere with the regular traffic along the access roads. The full report of the proposed project is available for inspection during working hours at: (a) Director-General, NEMA, Popo Road, off Mombasa Road, P.O. Box 67839-00200, Nairobi. (b) Principal Secretary, Ministry of Environment and Forestry, NHIF Building, Community, P.O. Box 30126-00100, Nairobi. (c) County Director of Environment, Nairobi City County. The National Environment Management Authority invites members of the public to submit oral or written comments within thirty (30) days from the date of publication of this notice to the Director-General, NEMA, to assist the Authority in the decision making process of the plan. GEOFFREY WAHUNGU, Director-General, MR/5816410 National Environment Management Authority. Impacts High demand of construction raw materials Effluent discharge Increased storm water, runoff and soil erosion 15th March, 2019 THE KENYA GAZETTE , 1073 , Impacts Proposed Mitigation Measures Noise and • Sensitize construction vehicle drivers and excessive machinery operators to switch off engines of vibration vehicles or machinery not being used. • Ensure that construction machinery are kept in good condition to reduce noise generation. Impacts Proposed Mitigation Measures • Limit public access to the construction site. • Ensure that all construction machines/ equipment are operated by experienced personnel and regularly serviced in order to avoid any accidents. The full report of the proposed project is available for inspection during working hours at: (a) Director-General, NEMA, Popo Road, 'off Mombasa Road, P.O. Box 67839-00200, Nairobi. (b) Principal Secretary, Ministry of Environment and Forestry, NHIF Building, Community,' P.O. Box 30126-00100, Nairobi. • Ensure that all generators and heavy- duty equipment are insulated or placed in enclosures to minimize ambient noise levels. • Comply with EMCA (Noise and 'Excessive Vibration pollution control) Regulations, 2009. • . Ensure that all workers are provided with and wear PPE at all times. Solid waste generation • Ensure use of suppressors or noise shields on, noisy equipment. • Use of an integrated solid waste management system. • Through accurate estimation of the sizes' and quantities of materials required. • Ensure that construction materials left over at the end of construction will be used in other projects rather than being disposed of. • Waste collection bins to be provided at designated pants on site. • Private waste disposal company to be contracted , to transport and dispose the solid waste from site. (c) County Director of Environment, ICilifi County. The National Environment Management Authority invites members of the public to submit oral or written comments within thirty (30) days from the date of publication of this notice to the Director-General, NEMA, to assist the Authority in the decision making process of the plan. GEOFFREY WAHUNGU, Director-General, MR/6019708 National Environment Management Authority.

Dated the 15th March, 2019.

GEOFFREY WAHUNGU,

Director-General, National Environment Management Authority.

Extracted Entities (1)

previous_gazette_ref

2530

Details

Act / Legislation
THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
Reference
No. 8 of 1999
Signed By
GEOFFREY WAHUNGU
Title
Director-General, National Environment Management Authority
Date Signed
15th March 2019
Page
50
Extraction Method
regex