ESTABLISHMENT 75% confidence via regex

GAZETTE NOTICE NO. 4457

GAZETTE NOTICE NO. 4457

THE ENVIRONMENTAL MANAGEMENT AND CO—ORDINATION ACT

(No. 8 of 1999)

ESTABLISHMENT


Pursuant to Regulation 21 of the Environmental Management and Co-ordination (Impact Assessment and Audit) Regulations, 2003, the National Environment Management Authority (NEMA) has received an Environmental Impact Assessment 'Study. Report for the above proposed project The proponent, Athi Water Services Board, is proposing to rehabilitate and expand Machakos Sewerage System. The project will comprise; construction of INo. trickling filter waste water treatment plant with a capacity of 12,500m3/day (along river Ikiwe), 65 km trunk and lateral lines within Machakos Town and its environs, 4No. sanitation blocks, rehabilitation of existing sewer lines, sewer exhauster truck and '2000No. individual connections in Machakos County. The following are the anticipated impacts and proposed mitigation measures: impacts Proposed Mitigation Measures Air quality Maintenance of equtpnient and machinery by regular servicing. • . Use environmentally, friendly fuels such as hw Sulphur diesel. • Minimize idling of machinery. • Sprinkling of all active construction areas as and when necessary. • Control of construction vehicle speeds by imposition of speed limits. • Provision of appropriate PPEs such as dust masks to site workers. • Covering of sludge processing facilities. • Establishment of greenbelts around the STWs to serve as wind breaks: Noise and • Portable hoods to be installed" to shield excessive compressors and other ' small stationary vibrations equipment where necessary. • Pumps, generators and other mobile equipncent to be sited as far as practicable from housing and other noise sensitive locations. • The contractor to endeavour to use equipment 'installed with noise abatement devices as much as practicable. • Idling time on trucks and other noisy equipment to be limited to a minimum. • Personal protective equipment such as ear muffs will be provided to workers at the sites as necessary. Soil -. Trench back-fill material to be compacted. Establishment of berms around the STP. • Implementation of spillage prevention and control measures for hazardous materials. Increased • Adopt energy conservation measures such as energy use , of energy saving appliances in staff demand housing. • Explore renewable energy sources such as solar for lighting around facilities. Impacts Proposed Mitigation Measures Potential • Implement a rigrous monitoring program to discharge of ensure that the new STWs operate effectively untreated or and as designed. inadequately treated effluent Solid waste • Identify a suitable landfill site to appropriately generation dispose solid wastes from the STWs. Dried sludge/cake tp be sold off/collected for disposal as organic fertilizer for use in local farms. • Monitor sludge quality to ensure that human -health is protected. Occupational . Provision of all workers on site with the health and necessary PPEs. safety • Ensuring a safe and healthy environment for the construction workers. • Workers accidents to be mitigated by enforcing adherence to safety procedures. • Preparing contingency plans for accident response. • Safety education and training to be emphasized. • Have qualified first aid personnel among the workers. • Maintain fully stocked first aid kits at the sites. Fire • Provide firefighting equipnient at the construction site area. • Contractor staff to be sensitized on firefighting equipment use. • No burning of materials is to be permitted at the site. The full report of the proposed project is available for inspection during working hours at: - (a) • Director—General, NEMA, Popo Road, off Mombasa Road, P.O. Box 67839-00200, Nairobi. • (b) Principal Secretary, Ministry of Environment and Forestry, NHIF Building, Community, P.O. Box 30126-00100, Nairobi. (c) County Director of Environthent, Machakos County The National Environment. Management Authority invites members of the public to submit oral or written comments within thirty (30) days from the date of publication of this notice to the Director—General, NEMA, to assist the Authority in the decision making process of the plan. GEOFFREY WAHUNGU, birector—General, MR163 19293 National Environment Management Authority. GAZETrE NOTICE No. 4458 THE ENVIRONMENTAL MANAGEMENT AND CO—ORDINATION ACT (No.8of 1999) THE NATIONAL ENVIRONMENT MANAGEMENT AUTHORITY ENVIRONMENTAL IMPACT ASSESSMENT STUDY REPORT FOR THE PROPOSED THJKA SANITATION IMPROVEMENT PROJECT IN THIKA (AREA SERVED BY THIKA WATER AND SEWERAGE COMPANY), KIAMBU COUNTY INVITATION OF PUBLIC COMMENTS Pursuant to Regulation 21 of the Environmental Management and Co-ordination (Impact Assessment and Audit) Regulations, 2003, the National Environment Management Authority (NEMA) has received an Environmental Impact Assessment Study Report for the above proposed project. The proponent, Athi Water Services Board, is proposing to rehabilitate and expand. Thika Sanitation Project. The project will comprise 3No. STPs, 2No. new treatment works, waste water treatment plant, sludge digester, sludge thickener, extension and upgrading of the existing sewer network, 12No. ablution blocks, water point and water storage facilities and other associated facilities and amenities in the area covered by Thika Water and Sewerage Company in Thika, KiambU County. The following are the anticipated impacts and proposed mitigation measures: Impacts Proposed Mitigatiqn Measures Air quality . Comply with the provisions of EMCA, 2015 (Air Quality Regulations, 2014). All construction machinery shall be maintained and serviced in accordance with the contractor's specifications. • Water sprays shall be used on all earth-works areas within 200 in of human settlement especially during the dry season. • Earth moving be done under dump conditions as much as possible to preyent.emission of dust into the air.. - • Ensure appropriate covering/ventilation of the pre-treatment unit. Noise and • Comply with provisions of EMCA, 2015 excessive (Noise and Excessive Vibrations Regulations of vibrations 2009). - The contractor. . will keep noise level within acceptable limits. Construction activities shall, where possible, be confined to normal working hours in the residential areas. • Sensitive receptors, for example shall be notified at least 5 days before construction is due to commence in their vicinity. Drainage and • Excavated channels to follow contours to avoid hydrology interference with surface drains. disrution • Whenever necessary, drains along the construction line are directed towards existing drainage systems to cater for storm water during the rains. o However, construction should be carried out during a dry season. • Utilize excavated soil to cover the water and sewer lines that will have been laid in the ground. • Etisure compliance with environmental laws. Increased liquid .• Water containing pollutants such as concrete or waste chemicals should be directed to a conservancy tank for removal from the site where applicable. • Potential pollutants of any kind and form shall be kept, stored and used in such a manner that any escape can be contained. • Wash areas shall be place4 and constructed in such a manner so as to ensure that the surrounding areas including groundwater are not polluted. • No grey water runoff or uncontrolled discharges from the site or working areas. Increased • • Sourcing power from the national grid. energy . demand . Having a dedicated sub-station for the plant and 24th May, 2019 THE KENYA GAZETTE 2017 Impacts Proposed Mitigation Measures quarry areas. Use of waste oils in firing the plant. Use of solar energy for lighting of the plant areas, staff quarters and social amenities. Solid waste • A site waste management plan should be generation prepared by the coritractor. • Designate areas for collection and removal and identification of approved disposal site. • Ensure that the solid waste collection, segregation, and disposal system is functioning properly at all times. • Recycle and re-use wastes where possible such as scrap metal. Soil degradation . THIIWASCO to attend to burst pipes promptly to prevent excessive loss of soil. Provide high risk areas with appropriate drainage for effective channeling of burst sewage spills. • Encourage land owners along sewer lines to maintain vegetated belts along the pipeline. • Mark clearly the pipeline for ease of identification and protection by the adjacent landowners. Occupational . Establish a Health and Safety Pfan (HASP) for health and civil.works areas. safety • Ensuring the working hours are controlled. • Provide workers with PPE5. • Provide workers training on safety procedures and emergency response such as fire and sewer pipe bursts. Public health • Ensure proper and periodic maintenance of sewer lines and treatment plane • Activate a community watch group for information sharing on the status of the sewer line. Regular checl, repair and maintenance of the sewer line. • Awareness rising among community members not to dump solids in manholes. • Regular cleaning of grit chambers and sewer lines to remove grease, grit, and other debris that may lead to sewer backups. The full report of the proposed project is .available for inspection during working hours at: Director—General, NEMA, Popo Road, off Mombasa Road, P.O. Box 6783940200, Nairobi. Principal Secretary, Ministry of Environment and Forestry, NHIF Building, Community, P.O. Box 30126-00100, Nairobi. County Director of Environment, Kiambu County. The National Environment Management Authority invites members of the public to submit oral or written comments within thirty (30) days from the date of publication of this notice to the Director—General, NEMA,. to assist the Authority in the decisi?n making process of the plan. GEOFFREY WAHUNGU, Director—General, MR/63 19294 National Environment Managepient Authority. GAZETFE NOTICE No.4459 THE ENVIRONMENTAL MANAGEMENT AND CO—ORDINATION ACT (No. 8 of 1999) THE NATIONAL ENVIRONMENT MANAGEMENT AUTHORITY ENVIRONMENTAL IMPACT ASSESSMENT STUDY REPORT FOR THE PROPOSED 50MWe GEOTHERMAL WELLHEAD LEASING PROJECT AT OLKARIA GEOTHERMAL FIELD ON PLOT.L.R. NO. 1288116 IN NAIVASHA SUB-COUNTY, NAKURU COUNTY INVITATION OF PuBLIC COMMENTS Pursuant toRegulation 21 of the Environmental Management and Co-ordination (Impact Assessment and Audit) Regulatians, 2003, the National Environment Management Authority (NEMA) has received ,an Environmental Impact Assessment Study Report for the above proposed project. The proponent, Kenya Electricity Generating Comiany PLC, is proposing to construct a 50 MWe geothermal wellhead power generation units' project at the Olkaria Geothermal Field. The project will comprise of 'the following; production wells, separator station, reinjection wells, short steam pipelines within, the wellpad, portable Wellhead generators,, turbines and cooling towers, containerized substation switch-gear, and 11/13 KY power evacuation line and other associated facilities and amenities. The project is located on plot L.R. No. 2881/6 in Naivasha Sub-county, Nakuru County. The following are the anticipated impacts and proposed mitigation measures: Impacts Proposed Mitigation Measures Vegetation Minimize vegetation clearance. clearing • Habitat restoration to be undertaken. • Control of invasive species via regular • inspections and uprooting programme. Air quality • Secure the site using appropriate dust screens. • Dampen bare earth surfaces through sprinkling water. • Provision of personal protective equipiient. • Spread ballast iii all exposed surfaces around the well head to suppress dust emission. • Stack emission measurements from - the generator. • Scheduled and condition based maintenance of equipment. • Post warning signs at strategic positions within the well pads. • Proper fencing of the well pads. • Monitoring of hydrogen sulphide emission to be done. • Covering of trucks transporting loose materials with canvas. Noise and • Provision of ear muffs to workers exposed to excessive noise levels above 85dB(A). vibrations • The noise level from each equipment shall be less than 85 dB(A) at lm 'distance from the source. • Reular servicing and maintenance of equipment. • Install appropriate sound proof materials in areas where workers are likely to stay for eight or more hours. • Provide workers with PPE for noise impact reduction. - - Impacts Effluent generation Proposed Mitigation Measures • Provision of suitable containeis for temporary accumulation of solid waste. • Segregation of solid waste from the ôOrce. • Solid waste shalt be disposed of via NEMA licensed waste handlers. • Provision of suitable worker's sanitary facilities. . -Encourage reuse and recycling of materials. • Clean-up of the site to the satisfaction of KenGen's Environmental Officer.

Dated the 24th May, 2019.

Extracted Entities (1)

previous_gazette_ref

4457

Details

Act / Legislation
THE ENVIRONMENTAL MANAGEMENT AND CO—ORDINATION ACT
Reference
No. 8 of 1999
Date Signed
24th May 2019
Page
21
Extraction Method
regex