Back
REGULATION 100% confidence via regex

GAZETTE NOTICE NO. 4460

GAZETTE NOTICE NO. 4460

THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT

(No.8 of 1999)

REGULATION


Pursuant to Regulation 21 of the Environmental Mnagement and Co-ordination (Impact Assessment and Audit) Regulations, 2003, the National Environment Management Authority (NEMA) has received an Environmental Impact Assessment Study Report for the above proposed project. The proponent, Kings Serenity Limited, is proposing to develop lONo. blocks comprising 720No. two (2) bedroom flats. There will be five floors (four floors plus the ground floor). Other features will comprise of a driveway, parking -lots, water supply and electricity supply among other ssociated facilities and amenities on plot L.R. No. 52124 in Rongai, Kajiado County. The following are the anticipated impacts and proposed mitigation measures: - Impacts Proposed Mitigation Measures Air quality . Sprinkling of water during construction phase. • Control of vehicle - speeds by imposition of speed limits. - Soil erosion • Control earthworks. • Install drainage. - - Compact loose soil. • Landscaping. • Contrpl activities during rainy conditions. • Provide soil erosion control structures on the steep sides during construction phase. Noise and • Sensitize drivers on noise management. excessive vibrations • Maintenance of plant equipment. - - • Construction activities to be restricted to daytime. • Workers in the vicinity of high-level noise to wear safety and protective gear. - . Provide noise buffers such as walls and trees - around site. - Solid waste • Segregating solid waste generated and arrange for recycling. - Waste water • Due to the spring on the lower side, no waste sewage water will be released. • Kitchen water will be treated and used for watering flowers. - - - • Should use modern sewer system. High water • Management of water use. - demand • Recycling of water dunng construction phase - rainwater harvesting. Oil pollution . Proper storage handling and disposal of oil waste. • - Maintain plant and equipment to avoid leaks. - • Maintenance of construction vehicles should be carried out in the contractor's yard of the site. - • Provide oil interceptors along the drains leading - from the carwash and service bays. 24th May, 2019 Impacts Proposed Mitigation Measures Solid waste • Private contractor will be engaged to collect management solid waste generated. • Wastes to be collected regularly to control air pollutiàn and vermin/insects etc. • Receptacles will be provided for waste storage prior to collecfion. • Resource recovery 'will be encouraged once the project takes off so as to shrink waste stream and recover non-recyclables. Refuse collection vehicles will be covered to prevent scatter of wastes by wind. • Wastes will be collected by a licensed operator to avoid illegal final dumping at unauthorized Sites. • All persons involved in refuse collection shall be in full protective attire. Road safety • Enforce speed limits for contraction vehicles especially along roads leading to the site. • Provide bill boards at the site entrance to notify motorists about the development. Occupational • Ensure proper solid waste disposal facilities. health and • Ensure effective waste water management.' safety • Sensitize residents on environmental management. • Provision of Personal Protective Equipment (PPE). Fire ' Install firefighting equipment. • Sensitize workers and residents on fire risks management. • Adapt effective emergency response plan. • Maintain firefighting machinery regularly. • Provide emergency numbers at strategic points. The f011 report of the proposed project is available for inspection during working hours at: Director—General, NEMA, Popo Road, off Mombasa Road, P.O. Box 67839-00200, Nairobi. Principal Secretary, Ministry of Environment and Forestry, NHW Building, Community, P.O. Box 3012640100, Nairobi. County Director of Environment, Kajiado County The National EnvirOnment Management Authority. Invites members of the public to submit oral or written comments within thirty (30) days from the date of publication of this notice to the Director—General, NEMA, to assist the Authority in the decision making process of the plan. GEOFFREY WAHUNGU, Director—General, MR/63 19429 National Environment Management Authority. GAZETFE NOTICE NO. 4461 THE ENVIRONMENTAL MANAGEMENT AND CO—ORDINATION ACT (No.8 of 1999) THE NATIONAL ENVIRONMENT MANAGEMENT AUTHORiTY ENVIRONMENTAL IMPACT ASSESSMENT STUDY REPORT FOR THE PROPOSED WILMA TOWERS RESIDENTIAL APARTMENTS ON PLOT L.R. NO. 2/145/4 ALONG ELGEYO MARAKWET ROAD IN KILIMANI, NAIROBI CITY COUNTY INVITATION OF PUBLIC COMMENTS Pursuant to Regulation 21 of the Environmental Management and Co-ordination (Impact Assessment and Audit) Regulations, 2003, the National Environment Management Authority (NEMA) has received an Environmental Impact Assessment Study Report for the above proposed project. The proponent, Wilma Court Limited, is proposing to develop one block with 2No. identical towers apartments comprising of 17No. apartment floors on each tower connecting from a common ground floor with three basement floors. The 3No. basement floors will comprise of 38No., 47No. and 50No. parking lots, car ramps, 3No. lifts and 3No. service rooms for each tower, The ground floor will comprise of 6No. two bedroom apartments, gym, swimming pool, steam, sauna, management office, children playing area, guard house , among other facilities and amenities. Tower one and two will comprise of 9ONo. one bedroon units and 30No. two bedroom units each. This totals to 246No. apartments. Both roofs will have a 4500L water tank and a bump booster, there also will be a 280,000 L underground tank and other associated facilities and amenities on plot L.R. No. 2/145/4 along Elgeyo Marakwet Road, Kilimani in Nairobi City County. The following are the anticipated impacts and proposed mitigation measures: Impacts Proposed Mitigation Measures Air quality . Control speed andi operation of construction vehicles. • Prohibit idling of vehicles. • Spray water on excavated areas. • The Site should be fenced to curb dust from spreading to the neighbourhood. Maintenance of construction plant and equipment. • Workers should be provided with dust masks if working in sensitive areas. • Avoid spillage of loose soil to the road where it will be disturbed and blown away by traffic. • Sensitize drivers to avoid off road driving; • Water all unpaved roads used for any vehicular traffic. • Stockpiles of sand and soil should be covred or surrounded with wind breaks. • . Trucks hauling dirt and debris should be covered to reduce spillage on to paved roads. Noise and • Worl5ers in the vicinity of or involved in high- excessive level noise to wear safety protective gear. vibrations • Maintain equipment. • Construction should be carried out only during daytime. 0800-1700hrs. • Signs should be erected to restrict motorists to avoid unnecessary hooting within the compound. • Billboards should be erected at the project site to alert neighbors on the development. Solid waste • Provide communal solid waste collection containers (skip). • Local Authority/NEMA to provide waste dumping site. Engage a NEMA Registered Waste Collection Firm. • , Site soil to be used to backfill excavated sites. Increased • Advocating for the use of other 'renewable energy use sources of energy such as wind ' and solar - energy, install solar panels. • Use of clean fuels e.g. unleaded and de- sulphurized fuels in vehicles. • Paving should only be carried out where necessary to reduce the reflection of the solar radiations. Impacts Proposed Mitigation Measures Using sustainable drainage systems that mimic the natural percolation of water into the soiL and green roofs where possible. Increased water • Install water conserving taps that turn-off demand automatically when water is not being used. • Promote recycling and reuse of water as much as possible sensitize workers to reduce water wastage or reuse water where feasible. • Install a discharge meter at water outlets to determine and monitor total water usage. Promptly detect and repair of water pipe and tank leak. • Sensitize staff to conserve Water by avoiding unnecessary water us. Occupational Train staff workers on occupational health and health and safety. safety • Provide full protective gear in addition to the right tools and operational instruction manuals. Compliance with occupational health and safety requirements. • Enforcement of health and safety requirements. • Provision of First Aid Kit. * Emergency preparedness. • Train Construction workers on safe working practices. Fire • Install firefighting equipment. • Sensitize workers and residents on fire risks management. • Adapt effective emergency response plan. • Maintain firefighting machinery regularly. • Provide emergency numbers at strategic points. The full report of the proposed project is available for inspection during working hours at: Director-General, NEMA, Popo Road, off Mombasa Road, P.O. Box 67839-00200, Nairobi. Principal Secretary, Ministry of Environment and Forestry, NHIF Building, Community, P.O. Box 30126-00100, Nairobi. County Director of Environment, Nairobi City County. The National Environment Management Authority invites members of the public to submit oral or written comments within thirty (30) days from the date of publication of this notice to the Director-General, NEMA, to assist the Authority in the decision making process of the plan. GEOFFREY WAHUNGU, Director-General, MR/63 19144 National Environment Management Authority.

Dated the 24th May, 2019.

GEOFFREY WAHUNGU,

Director-General, 19144 National Environment Management Authority.

Extracted Entities (1)

previous_gazette_ref

4460

Details

Act / Legislation
THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
Reference
No.8 of 1999
Signed By
GEOFFREY WAHUNGU
Title
Director-General, 19144 National Environment Management Authority
Date Signed
24th May 2019
Page
24
Extraction Method
regex