Back
REGULATION 100% confidence via regex

GAZETTE NOTICE NO. 5975

GAZETTE NOTICE NO. 5975

THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT

(No. 8 of 1999)

REGULATION


Pursuant to Regulation 21 of the Environmental Management and Co-ordination (Impact Assessment and Audit) Regulations, 2003, the National Environment Management Authority (NEMA) has received an Environmental Impact Assessment Study Report for the above proposed project. The proponent, Roofings Kenya Limited, is proposing to construct a steel galvanizing plant and attendant auxiliary facilities at Uwanja Wa Ndege, Kaliang'ombe Sub-location, Rabai SutpCounty in Kilifi County. The following are the anticipated impacts and proposed mitigation measures: Impacts Proposed Mitigation Measures Loss of biodiversity • Set up barriers to prevent off-road driving. • Ensure proper landscaping after completion of construction phase. • Demarcate and delineate areas to be affected by the construction work. • landscape plan shall be developed to include action items corresponding to each phase of the project. • Conducting site clearing actisities in stages to minimize the area of exposed soil. Occupational health • Avail Warning signs of on-going and safety construction work. • Appoint a safety supervisor. • Machines to be operated by qualified personnel only. Increased demand • Harvest rainwater. for water • Promote recycling and reuse of water as much as possible. • Promptly detect and repair of water pipe and tank leaks. 5th July, 2019 THE KENYA GAZEITE 2479 Impacts Proposed Mitigation Measures • Ensure all machinery and other moving parts of machinery are enclosed or guarded. • Provide fully equipped First Aid Kits. • Install safety net to protect workers against falling objects. • Food for workers to be supplied by vendors licensed by Public Health office. • Use stable ladders/ support structures. • Medical checkup for all workers prior to and throughout the construction phase. • Conduct sensitization campaign) for the public on risks related to construction sites.. Over extraction of • Source construction materials from quarry raw materials. and sand' mining firms which have been registered and have received NEMA approval. • Prepare and purchase construction materials as per the bill of quantities to avoid wastage of resources. • Consider reuse of construction materials and use of recycled materials. • Ensure that the construction materials delivered at the site are covered. • to avoid loss of construction materials through run-off and wind. Solid waste • Minimize waste generated through hierarchy generation of options: source 'reduction, recYcling, reuse, combustion and sanitary land filling. • The contractor should adhere to bill of quantities to avoid wastage. • Provide adequate number of suitable solid waste containers. • Ensure use of durable, long- lasting construction materials that will not need to be replaced oftenly. • • Purchase and make use of building materials that have minimal packaging to avoid generation of excessive packaging waste. Air pollution • Spraying of dry soils in excavated areas and access road to suppress dust. • Regular maintenance of construction equipment/ machines. • Proper personal protective gears i.e. dust masks. • Stacked building material on-site shall be kept for shortest time possible. • Where feasible use alternative non-fuel construction equipment or use low Sulphur fuel. Hazardous waste • Segregate wastes by separating hazardous managemes waste from non-hazardous wastes. • Securely bundled and labeled hazardous waste. Noise and excessive • Construction activities to be restricted to vibration daytime (08001700hrs) only. • Affix Silencers and mufflers on exhaust systems (where necessary) of all mechanical equipment. • Sensitize truck drivers and machine. operators to switch off engines when not in use. Impacts Proposed Mitigation Measures • Isolation of the source and sensitive receptors during the construction phase will be undertaken to minimize the impacts of noise and vibration. • Ensure that noise levels. emanating from machinery, vehicles and noisy construction activities are kept at a minimum. • Adherence to EMCA Noise and Excessive Vibration Pollution Control Regulation of 2009. Destruction of the • Landscaping the site to restore the landscape components of the original grounds. • Conduct site clearing activities in stages to minimize the area of exposed soil. • Seeding exposed soil to minimize soil erosion. Change in drainage • Monitoring and maintaining proper storm pattern water drainage systems. • Redirecting flows during periods of heavy rains to minimize erosion and surface runoff. • Improve 'section of the toad fronting the plot to provide ample drainage. The full report of the proposed project is available for inspection during working hours at: (a) Director-General, NEMA, Popo Road; off Mombasa Road, P.O. Box 67839-00200, Nairobi. (b) Principal Secretary, Ministry- of Environment and Forestry, NHIF Building, CoMmunity, P.O. Box 30126-00100, Nairobi. (c) County Director of Environment, Kilifi County. The National Environment Management Authority invites members of the public to submit oral or written comments within thirty (30) days from the date of publication of this notice to the Director-General, NEMA, to assist the Authority in the decision making process of the plan. GEOFFREY WAHUNGU, Director-General, MR/6508317 National Environment Management Authority.

Dated the 5th July, 2019.

GEOFFREY WAHUNGU,

Director-General, National Environment Management Authority.

Extracted Entities (1)

previous_gazette_ref

5975

Details

Act / Legislation
THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
Reference
No. 8 of 1999
Signed By
GEOFFREY WAHUNGU
Title
Director-General, National Environment Management Authority
Date Signed
5th July 2019
Page
32
Extraction Method
regex