GAZETTE NOTICE NO. 3548

PURSUANT to clause 5 of Part III of the Schedule of Tariffs 2018, notice is given that all prices for electrical energy specified in Part II of the said Schedule will be liable to a Water Resource Management Authority (WRMA) levy of plus 1.67 Kenya cents per kWh for all meter readings to be taken in April, 2019. Information used to calculate the WRMA levy. Approved WRMA levy for energy purchased from hydropower plants of capacity equal to or above 1MW = 5 Kenya cents per KWh. Units Purchased in March, 2019 Hydropower Plant (KWh.) Gitaru 77,461,000 Kamburu 40,972,000 Kiambere 60,782,000 Kindaruma 19,019,190 Masinga 17,075,000 Tana 2,163,127 Wanjii 1,729,999 Sagana 173,494 Ndula 0 Turkwel 57,109,000 Gogo 407,109 Sondu Miriu 3,849,000 Sangoro 1,135,000 Regen-Terem 569,553 Chania 6,338 Gura 290,509 Total units purchased from hydropower plants with capacity equal to or above 1MW, 282,742,319 kWh Total units generated and purchased (G) excluding exports in March, 2019 = 994,454,056 kWh ROBERT PAVEL OIMEKE, MR/5353451 Director-General. 1460 1460

Extracted Entities (1)

previous_gazette_ref

3548

Details

Signed By
ROBERT PAVEL OIMEKE
Title
Director-General
Date Signed
12th April 2019
Page
21
Extraction Method
regex