GAZETTE NOTICE NO. 7473
GAZETTE NOTICE NO. 7473
THE ENVIRONMENTAL MANAGEMENT AND CO—ORDINATION ACT
(No. 8 of 1999)
ESTABLISHMENT
Pursuant to Regulation 21 of the Environmental Management and
Co-ordination (Impact Assessment and Audit) Regulations, 2003, the
National Environment Management Authority (NEMA) has received an Environmental Impact Assessment Study Report for the above proposed project.
The proponent, Reale Hospital Limited, is proposing to develop a hospital which shall comprise a 3No. storey building consisting of well-equipped operational theatres, accident and emergency centres, laboratory, cold room and vaccination services and a car park among other necessary facilities and amenities on plot No. Nandi/Kamobo
6840 along Kapsabet—Kisumu Road, approximately 1.5 km from
Kapsabet town in Nandi County.
The following are the anticipated impacts and proposed mitigation measures:
• Establishment of flower gardens and lawns around project site.
Air quality • Sprinkle water during construction work.
• Control of speed and movement of construction vehicles.
• Use of low-sulphur diesel for diesel-operated machinery.
•
• Switch off machines when necessary.
Liquid waste • Proper connection of waste water and sewerage management system to existing county council system as per approved design.
• Provision of storm water drains.
• Proper decommissioning of waste water and sewerage system.
• Proper maintenance of the drainage system.
, Solid waste
• Provision of waste collection bins.
management
• Re-use of soil, construction debris and other reusable waste.
• Proper containment and disposal of solid waste.
• Contracting a licensed waste collection and disposal company.
• Creation of awareness on proper solid waste disposal.
Noise and • Use of ear protection aids by construction excessive workers.
vibrations
Construction to take place only during the day.
Use of attenuated equipment.
No unnecessary hooting by project vehicles.
Installation of sound barriers.
Temporarily fencing off of noisy machinery such as vibrators.
Increased demand for water and electricity
Storm water management
• Switch off machines when necessary, • Provision of adequate water storage facilities.
• Installation of waste water recycling systems.
• Installation of rainwater harvesting structures.
• Re-use of water where possible, especially during the construction phase.
• Explore additional sources of water such as boreholes.
• Utilize alternative and renewable sources of energy such as installation of solar panels.
• Use of energy saving and efficient appliances.
• Establish a storm water drainage system.
• Proper maintenance of the drainage system.
• Surface run-off and discharge should be controlled to prevent soil erosion.
Impacts
Vegetation
Impacts
Occupational health and safety
Proposed Mitigation Measures
• Planting grass to cover open/bare-grounds.
• Maintaining trees in areas not affected.
• Proper landscaping.
• Use specialized equipment to minimize damage to tree roots.
• If possible, plant new trees on approved public land to replace the trees cut down at the project site.
Proposed Mitigation Measures
• Use of suitable personal protective equipment
(PPE).
• Use of stable ladders and other clirr ibing/support structures.
• Sensitize workers on construction safety measures.
• Cleanliness and organization at the construction site.
• Fencing or covering of risky areas such as deep pits.
• Safety signage.
• Use of permit-to-work authorizer for risky jobs.
• Engagement of skilled labourers Insurance for workers if possible.
Fire hazards and • Acquire firefighting facilities/equipment.
accidents
• Sensitize workers in fire safety.
• Avoid storage of flammable substances on the project site.
• Keep well stocked first aid kits.
• Proper handling and use of tools and machinery.
The full report of the proposed project is available for inspection during working hours at:
(a) Director—General, NEMA, Popo Road, off Mombasa Road, P.O. Box 67839-00200, Nairobi.
(b) Principal Secretary, Ministry of Environment and Forestry, NHIF Building, Community, P.O. Box 30126-00100, Nairobi.
(c) County Director of Environment, Nandi County.
The National Environment Management Authority invites members of the public to submit oral or written comments within thirty (30) days from the date of publication of this notice to the
Director-General, NEMA, to assist the Authority in the decision making process of the plan. '
GEOFFREY WAHUNGU, Director-General, MR/6738649 National Environment Management Authority.
Dated the 9th August, 2019.
GEOFFREY WAHUNGU,
Director-General, National Environment Management Authority.
Extracted Entities (1)
previous_gazette_ref
7473
Details
- Act / Legislation
- THE ENVIRONMENTAL MANAGEMENT AND CO—ORDINATION ACT
- Reference
- No. 8 of 1999
- Signed By
- GEOFFREY WAHUNGU
- Title
- Director-General, National Environment Management Authority
- Ministry
- Ministry of Environment And Forestry
- Date Signed
- 9th August 2019
- Page
- 43
- Extraction Method
- regex
Source Gazette
Vol. CXXI No. 99
Published 16th January 2019