GAZETTE NOTICE NO. 3531
PURSUANT to clause 1 of Part III of the Schedule of Tariffs 2018, notice is given that all prices for electrical energy specified in Part II of the said Schedule will be liable to a fuel energy cost charge of plus 240 Kenya cents per kWh for all meter readings to be taken in May, 2020.
Information used to calculate the fuel cost charge.
Power Station
Fuel Price in April
2020 KSh/Kg. (Ci)
Fuel Displacement Charge/
Fuel Charge, April,2020
KShikWh
Variation from
March, 2020 Units in April, 2020 in kWh (Gi) Prices
Increase/(Decrease)
Kizevu I Diesel Plant 58.86 1.52 1,108,000
Kipevu II Diesel Plant (Tsavo) 44.64 7.91 9,561,900
Kipevu III Diesel Plant 61.54 3.47 1,624,000
Embakasi GT 1-Muhoroni 84.99 (20.22) -
Embakitsi GT 2-Embakasi 84.99 (20.22) 1,889,120
Rabat Diesel without steam turbine 45.40 (1.12) 436,227
Rabat Diesel with steam turbine 45.40 (1.12) 11,167,773
Iberafrica Diesel 6059 152 - lberafrica Diesel -Additional Plant 5238 135 2,148,240
Thika Power Diesel Plant 63.10 1.58 1,368,700
Thika Power Diesel Plant (with steam unit) 63.10 158 (0)
Gulf Power 58.34 (1150) 662,016
Power Station
Fuel Price in April
2020 KShIKg. (Ci)
Fuel Displacement Charge/
Fuel Charge, Apri1,2020
K5h./kWh
Variation from
March, 2020 Units in April, 2020 in kWh (Gi) Prices
Increase/(Decrease)
Triumph Power 57.63 1.41 606,400
Triumph Power 57.63 1.41 -
Olkaria IV steam charge 2.13 0.06 72,600,856
Olkaria I Unit IV & V steam charge 2.13 0.06_ 69,630,682
UETCL Import 10.64 0.27 8,672,510
UETCL Export 10.64 0.27 (1,301,175)
Lodwar Diesel (Thermal) 112.26 (14.93) 1,036,250
Mandera Diesel (Thermal) 116.24 (15.29) 1,134,944
Marsabit Diesel (Thermal) 120.47 (7.22) 522,894
Wajir Diesel 118.04 (10.66) _1,107,570
Moyale Diesel (Thermal) 132.81 - 41,714
Merti (Thermal) 143.26 (7.51) 40,308
Habaswein (Thermal) 132.48 (1.97) 152,736
Elwak (Thermal) 128.99 (6.88) 190,309
Baragoi 145.25 (5.52) 42,042
Mfangano (Thermal) 176.00 (2.97) 57,604
Lokichogio 13458 (1.94) 87,520
Takaba (Thermal) 137.73 (0.96) 55,116
Eldas 135.39 (3.79) 53,500
Rhamu 140.89 (1.51) 93,583
Laisamis 130.28 3.60 22,135
North Horr 166.22 (1.11) 15,686
Lokori 158.00 (8.78) 13,983
Daadab 12453 (2.64) 133,723
Faza-Island 207.08 (2.62) 61,594
Lokitaung 16733 - 6,241
Kiunga 225.87 (0.98) 23,984
Kakuma 122.A3 (10.05) 175,160
Banisa 143.77 - 20,203
Lokiriama 149.11 (11.88) 1,490
Kotulo 136.70 - 10,305
Karmoliban 170.23 - 1,256
Kholondile 131.03 - 3,059
Total units generated and purchased including Hydros, excluding exports (G) in April, 2020 = 848,621,908 kWh
ROBERT PAVEL OIMEKE, MR/0455081
Director-General.
Extracted Entities (1)
previous_gazette_ref
3531
Details
- Signed By
- ROBERT PAVEL OIMEKE
- Title
- Director-General
- Date Signed
- 15th May 2020
- Page
- 13
- Extraction Method
- regex
Source Gazette
Vol. CXXII No. 87
Published 24th January 2020