GAZETTE NOTICE NO. 6419
GAZETTE NOTICE NO. 6419
THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
(No. 8 of 1999)
RESTORATION
PURSUANT to regulation 21 of the Environmental Management and Co-ordination (Impact Assessment and Audit) Regulations, 2003, the National Environment Management Authority (NEMA) has received an Environmental Impact Assessment Study Report for the above proposed project.
The proponent, Paul Mungai Kimani, Charles Maina Muriuki &
George Nyoro Waigi, is proposing to develop a Gated Residential
Housing Development project comprising 13No Blocks with 570 no.
of units, 500 No. of parking spaces, 31 No shop units, a children’s playground, guard house and a borehole in a property acreage of 6 acres on plot L.R 12581/163 off Mombasa-Namanga Road interchange, Mavoko, Machakos County.
3394 3394
The following are the anticipated impacts and proposed mitigation measures:
Activity Negative Impact Proposed Mitigation Measures
Design Phase
Proposed
Residential apartments
Landscape visual impact
• Design of infrastructure that conforms with the project site features (topography and aesthetics)
Proposed
Residential apartments
Sanitation
Facilities
Soil and water contamination
• Design appropriate containments for oils/other construction chemicals and sanitary waste from the contractor’s camp.
Construction Phase
Soil Excavation at Proposed
Residential apartments site
Soil Erosion • Excavated soil is to be used for backfilling excavated areas while excess soil is disposed of off-site;
• Soils are not to be left exposed to wind/water;
• Soil erosion is to be reduced and river valley protection enhanced.
Construction of the Proposed
Residential apartments site
Air Pollution (dust, fuel and smoke emissions)
• Control speed of vehicles and Prohibit idling;
• Spray water during construction;
• Maintenance vehicles & equipment regularly;
• Provision of dust masks for use in dusty conditions;
• Use serviceable vehicles/machinery to reduce smoke;
Construction of the Proposed
Residential apartments site
Excess noise and vibration
• Use noise hearing protection devices when working with noisy equipment or noisy environment;
• Use serviceable equipment with low noise emission;
• Instruct truck/machinery operators to avoid raving engines
Construction of the Proposed
Residential apartments site
Generation of Solid
Waste
• Provide communal solid waste collection containers
(skip) for the collection and storage prior to appropriate disposal;
• Local Authority/NEMA to provide waste dumping site;
• Engage a NEMA Registered
Waste Collection Firm;
• Excavation activities to be done during the dry season to avoid soil erosion and siltation of streams;
• Site soil to be used to backfill excavated sites;
Construction of the Proposed
Residential apartments site
Generation of
Liquid Waste – used oil and other
Chemicals
(Hazardous Waste)
• Construct a paved containment for storage of oils and other liquid chemicals being used in the construction site;
Activity Negative Impact Proposed Mitigation Measures
• Provide containers for storage of used oils from vehicles
/machines/equipment being used at the construction site;
• Engage a NEMA Registered
Firm for the collection, transportation and appropriate disposal of used oil;
Construction of the Proposed
Residential apartments site
Risk of fire • Provide firefighting equipment at the construction site area;
• Contractor staff to be sensitized on firefighting equipment use;
• No burning of materials is to be permitted at the site.
Construction of the Proposed
Residential apartments site
Potential Pollution of Surface and
Groundwater
• No disposal of domestic waste at the project site;
• Provision of used oil containers at a central point;
• Use of waste bins/proper waste management;
• Pave parking area for trucks and direct drainage to containment;
Construction of the Proposed
Residential apartments site
Safety of Workers and other visitors to construction site
• Use of construction site barrier tapes to isolate the site(working) area to bar intruders from accessing the area in case of a dropping object;
• Appropriate head, hand and foot protection (PPE) during the manual clearing of vegetation and construction activities;
• Adopting ergonomic work flow designs that fit physical tasks to employees and not vice versa. Maintain work productivity;
• Construction site visitors require appropriate safety
Gear.
Construction of the Proposed
Residential apartments site
Working at heights
• Testing of structures for integrity prior to undertaking work;
• Implementation of fall protection including induction on climbing techniques and use of fall protection measures, • Provision of harnesses and scaffolds for working at heights;
• Inspection, maintenance, and replacement of fall protection equipment ;
• Use of helmets and other protective devices that are going to mitigate against scratches, bruises;
lacerations and head injuries due to dropping objects[
28th August, 2020 THE KENYA GAZETTE
Activity Negative Impact Proposed Mitigation Measures
• Provide first aid facilities at the site;
Construction of the Proposed
Residential apartments site
Health issues of construction workers and
Community
• Sensitize workers and community on sexually transmitted diseases especially STIs and
HIV/AIDS which is spread through socialization and unprotected sex;
• Sensitize workers on use of protection facilities like mosquito nets
Construction of the Proposed
Residential apartments site
Surface run off and sedimentation from construction activities
• Construction of effective drainages and culverts;
• Plant soil binding grasses and other native plants
Construction of the Proposed
Residential apartments site
Sanitary facilities for construction workers
• Installation of appropriate sanitary facilities;
Construction of the Proposed
Residential apartments site
Dangers of having
Child Labour issues arising
• Contractor to be strictly advised not to engage any underage persons(under 18 years of age) to perform any form of work at the site during construction
• Contractor will be required to comply with the
Employment Act, 2007
Operational Phase
Operation of
Proposed
Residential apartments
Facility
Maintenance of facilities
Working at heights
• Use of barrier tapes to isolate the maintenance areas;
• Provide harnesses/scaffolds for working at heights;
• Inspect and maintain fall protection equipment;
• Use of protective devices to mitigate against injury;
• Provide first aid facilities at the site;
Operation of
Proposed
Residential apartments
Facility
Risk of Fire • Sensitization of Workers on
Fire Safety Risks;
Operation of
Proposed
Residential apartments
Facility
Pollution of surface water and Waste management
• Ensure solid waste is collected and appropriately disposed of;
• Ensure that used oil from trucks are not released to the ground;
• Used oil is to be put into containers and appropriately disposed of by a NEMA approved agent;
• Provision of used oil containers for use by truck drivers;
Operation of
Proposed
Residential apartments
Facility
The Proponent Site
Solid Waste
Management during Operation
• Provision of communal solid waste containers (skip);
• Provision of secured solid waste collection containment where waste container (skip) is to be placed;
Activity Negative Impact Proposed Mitigation Measures
• Regular disposal waste depending rate fill up.
Operation of
Proposed
Residential apartments
Facility
Health issues of
Facility Workers and Community
• Sensitize workers and community on sexually transmitted diseases especially STIs and
HIV/AIDS which is spread through socialization and unprotected sex;
• Provide workers and community with condoms.
• Encourage the Community to go for HIV Testing and
Counselling in order to live a productive life;
Operation of
Proposed
Residential apartments
Facility
Monitoring and
Evaluation of the effectiveness of project Mitigations
• Implementation of monitoring of facility operations and success of proposed mitigations
• Health Trends
• Livelihood and socio- economic status of project area community;
• Any new emerging issues, threats and benefits of the residential apartment facility
Decommissioning Phase
Decommissioni ng of Proposed
Residential
Houses Facility
Air Pollution (dust, smoke, fuel emissions)
• Control of demolition vehicle speeds;
• Prohibition of idling of vehicles;
• Water is to be sprayed on building undergoing demolition during decommissioning o reduce dust emission;
• Regular maintenance of vehicles and equipment;
• Provision of dust masks for use in dusty conditions.
• Use of serviceable vehicles and machinery to avoid excessive smoke emission
Decommissioni ng of Proposed
Residential
Houses Facility
Noise pollution • Noise reduction/ hearing protection devices when working with noisy equipment;
• Use of serviceable equipment with low noise level;
• Instruction to truck/machinery operators to avoid raving engines;
• Use of noise protection (ear muff) during demolition;
Decommissioni ng of Proposed
Residential apartments
Facility
Potential Injury to
Workers
• Use of appropriate head, hand and feet protection
(PPE) during demolition of structures
• Adopting ergonomic work flow designs that fit physical tasks to employees and not vice versa while maintaining a balance with productivity;
3396 3396
Activity Negative Impact Proposed Mitigation Measures
Decommissioni ng of Proposed
Residential apartments
Facility
Working at heights • Use construction site barrier tape to isolate the site to guard site visitors from accidents and injuries;
• Implement a fall protection program that includes training in climbing techniques and use of fall protection measures, Provide
Harnesses;
• Use of helmets and other protective devices to mitigate against injury, • Provide first aid facilities at the site
Decommissioni ng of Proposed
Residential apartments
Facility
Site area rehabilitation and restoration
• Remove all demolished waste material;
• Repair and restore project area site
• Evaluate site contamination
• Plant trees and other appropriate vegetation.
The full report of the proposed project is available for inspection during working hours at:
(g) Principal Secretary, Ministry of Environment and Forestry, NHIF Building, Community, P.O. Box 30126–00100, Nairobi.
(h) Director-General, NEMA, Popo Road, off Mombasa Road, P.O. Box 67839–00200, Nairobi.
(i) County Director of Environment, Machakos County.
A copy of the report can be downloaded at www.nema.go.ke
The National Environment Management Authority invites members of the public to submit oral or written comments within thirty (30) days from the date of publication of this notice to the
Director-General, NEMA, to assist the Authority in the decision making process regarding this plan.
Comments can also be emailed to dgnema@nema.go.ke
MAMO B. MAMO, Ag. Director-General, MR/0767270 National Environment Management Authority.
Dated the 28th August, 2020.
MAMO B. MAMO,
Ag. Director-General, National Environment Management Authority.
Extracted Entities (1)
previous_gazette_ref
6419
Details
- Act / Legislation
- THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
- Reference
- No. 8 of 1999
- Signed By
- MAMO B. MAMO
- Title
- Ag. Director-General, National Environment Management Authority
- Ministry
- Ministry of Environment And Forestry
- Date Signed
- 28th August 2020
- Page
- 61
- Extraction Method
- regex
Source Gazette
Vol. CXXII No. 159
Published 3rd March 2020