Back
ACT 100% confidence via regex

GAZETTE NOTICE NO. 8761

GAZETTE NOTICE NO. 8761

THE PHYSICAL. AND LAND USE PLANNING ACT

(No. 13 of 2019)

ACT


NOTICE is given that the preparation of the above draft plans was on the 14th October 2020, completed. The plans relate to land situated within Bute, Eldas, Griftu, Hadado, Habaswein, Khorof-Harar and Tarbaj Towns and their environs. Copies of the draft plans have been deposited for public inspection free of charge at the Office of the County Director of Physical Planning at the lands offices in Wajir Municipality. The copies are available for inspection free of charge by all persons interested at at the Office of the County Director of Physical Planning at the lands offices in Wajir Municipality, from Monday to Friday between the hours of 8 a.m. and 5 p.m. Any interested person who wishes to make any representation in connection with or objection to the above plans may send the same to the below-mentioned address by 14th December, 2020. All representations or comments shall state the grounds upon which they are made. Comments or views should he addressed to: Naema Soma, CECM, Department of Lands, Housing and Physical Planning, County Government of Wajir, Wajir. Dated the 14th October, 2020 NAEMA SOMO, MR/I 320194 CECM, Lands, Housing and Physical Planning. Project Activity and Management Action Plans and Issues Responsibilities recruitments. Site clearing • Ensure proper handling and disposal of the waste. • All the graves on the project site should be identified and exhumed. • Follow the required cultural procedures in the grave relocations. Decommissioning of • Ensure proper handling and disposal of sanitary facilities and the waste generated. graves • All the graves on the project siteshould be identified and exhumed. Earth moving Dam formation Social interactions Economic issues Post-construction Health and sanitation Catchments' management • Practice soil control measures (terracing). • Spoil dumping only in approved locations. • Construction to be carried out during dry seasons. • Limit construction to day time. • Make certain regular maintenance of contractors machineries and vehicles. • Provide adequate signage and reflective tapes for restricted areas. • Training workers on environmental health and safety procedures. • Implement the rehablitation plan for material sites. • Provide workers with personal protective gear and enforce application. • Provide awareness and sensitization to the workers including HIV/AIDS. • Collaborate with the local leadership on selecting camp site locations. • Provide public safety signage and information appropriately. • Create awareness to the public for allconstruction operations. • Provide opportunities for local labour (upto 60%). • Integrate access to water points into the construction. • Enhance benefits from materials procurements to the local communities. • Ensuring 24 Hr security to the dam area. • Ensure regular water quality monitoring and maintenance of the water supply. • Influence the surrounding land-use activities. • Creation of awareness on water resource management and conservation. • Initiate afforestation programmes of slopes and other steep sections of the watershed area in collaboration with landowners. • Undertake catchment management plan for Kipchorian River basin. • Integrate a Land Use Management Plan, Pest Control Management Plans. 30th October, 2020 THE KENYA GAZETTE 4335

Dated the 14th October, 2020.

NAEMA SOMO,

MR/I 320194 CECM, Lands, Housing and Physical Planning.

Extracted Entities (1)

previous_gazette_ref

8761

Details

Act / Legislation
THE PHYSICAL. AND LAND USE PLANNING ACT
Reference
No. 13 of 2019
Signed By
NAEMA SOMO
Title
MR/I 320194 CECM, Lands, Housing and Physical Planning
Date Signed
14th October 2020
Page
28
Extraction Method
regex