REGULATION 58% confidence via regex

GAZETTE NOTICE NO. 8055

GAZETTE NOTICE NO. 8055

THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT

(No. 8 of 1999)

REGULATION


PURSUANT to regulation 21 of the Environmental Management and Co-ordination (Impact Assessment and Audit) Regulations, 2003, the National Environment Management Authority (NEMA) has received an Environmental Impact Assessment Study Report for the above proposed project. The proponent, Kithaayoni Self Help Group through the County Government of Machakos, through the Kenya Climate Smart Agricultural Project (KCSAP), has proposed the development of Kithaayoni Concrete Dam for domestic /livestock and micro irrigation. The projects will benefit 800 people and 2000 livestock located in Makaveti Village, Kyanzasu Sub-location of Kimutwa Location in Machakos County. The following are the anticipated impacts and proposed mitigation measures: Potential Mitigation Enhancement Measures Impacts Interference • Adequate survey should be done on the dam with the location and its extent. physical setting • Engagement shall be to assess whether there are grievances. • Landscaping. Noise • Noise maintained in accordance to EMCA pollution and specification standards. vibration • Equipment Operators to wear PPEs to prevent direct noise from the machinery. • Machines with minimal vibrations to be used. • Time restrictions for high vibrating machines (avoid working during the night for such machines). Air quality • Supply and construction vehicles will only use the degradation/ designated transport routes. The drivers will also dust be advised to stick to prescribed speed limits. emissions • The contractor will ensure proper repair and maintenance of vehicles and equipment to minimize exhaust gases. • The contractor shall ensure the appropriate speed limits are observed at along all road sections that will be used by construction vehicles on a needs basis to eliminate the creation of dusts. • Construction workers will be provided with dust masks to mitigate. Potential Mitigation Enhancement Measures Impacts Workers • The Project Contractor will be required to provide accidents and appropriate personal protective equipment and a hazards safe and healthy environment for construction during workers. construction • There should be a crisis management team to administer First Aid to injured persons. • The Project Contractor should test and approve equipment before use. • The Project Contractor should train workers on how to use various PPE and safe use of machinery. Extraction and • The construction extraction site should be use of backfilled to help retain the value of the land construction resource. materials • Fencing to be done before backfilling to prevent accidents of humans and livestock. Putting a sign to warn people. Generation of • Sensitization of construction workers on proper liquid and disposal of solid wastes. solid waste • Temporary latrines will be provided on site to be used by construction workers. • Oils and greases emanating from repair and maintenance activities will be collected in containers to avoid entry into local drainage channels. • Water from cleaning of equipment will be utilised within the project site and will not be discharged into watercourses. Loss of flora • Cutting of trees should be done only where and fauna necessary. • The proponent shall ensure that clearing of vegetation clearing is limited to the pipeline trench area (i.e. 0.5 meters width). • Transportation of construction materials to be done through the existing local roads. • Avoidance of vegetation clearing along riparian land. • Sensitization of construction work-force on environmental conservation and ecological protection. Increased • Transportation of construction material to specific vehicular and sites will be done through the existing local roads. human traffic • The contractor will rehabilitate the local roads that will be damaged during construction activities • Consultation with the local communities on planned road diversions if any. • Restriction of Vehicular and Human Traffic to the road reserve where possible. • Sensitization of drivers to comply with prescribed speed limits. Influx of • Preference is given to local residents for unskilled workers from jobs where necessary. other areas Occupation • Continuous supervision of occupational, health health and and safety management to ensure compliance. safety • Occupational Safety and Health Training for contractor's staff. • Conduct orientation talks and visits. • Conduct toolbox talks (safety meetings). • The contractors will develop a SOPs for managing the spread of Covid-19 during project execution and submit them for the approval of the Supervision Engineer and the Client before mobilization. The SOPs shall be in line with the World Bank guidance on COVID-19, Ministry of Health Directives and site-specific project conditions. Spread of COVID-19 amongst workers

Extracted Entities (1)

previous_gazette_ref

8055

Details

Act / Legislation
THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
Reference
No. 8 of 1999
Page
37
Extraction Method
regex