GAZETTE NOTICE NO. 3791
GAZETTE NOTICE NO. 3791
THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
(No. 8 of 1999)
RESTORATION
PURSUANT to regulation 21 of the Environmental Management and Co-ordination (Impact Assessment and Audit) Regulations, 2003, the National Environment Management Authority (NEMA) has received an Environmental Impact Assessment Study Report for the above proposed project.
The proposed project entails the design, construction and operation of a 90.5 km buried water pipeline and ancillary infrastructure. The pipeline is designed to transport water from the
Turwel Gorge Reservoir (referred to as the "Turwel Darn") in the West pokot to the central processing facility, located adjacent to the settlement of Nakukulas in Turkana County, Water abstracted from the dam will be pumped to a break tank close to Lokichar town and then gravity fed to the central processing facility, The topography of the proposed site slopes up gently, an approximate grade of 8% from the south of the site where the current entrance is located for about 250 meters from the southern site boundary to a relatively flat plateau.
The following are the anticipated impacts and proposed mitigation measures:
Impacts Proposed Mitigation *Awes
• Excavated materials shall reasonably be covered or removed if not re=used, • Ensure natural tevegetation following construction reinstatement and rehabilitation.
• Proper handling of soil to preserve different soil layers to enhance natural revegetation and protect stockpiles, • Segregate waste and appropriately store on-site before final disposal, * Have site a specific blodiverslty management procedures or Blodiveraity Management Plan, overseen by a Siodiversity Officer, • Liaise and consult with all relevant authorities for the effective implementation of biodiversity mitigation measures, * Workers shall be sensitized on biodiversity/
Wildlife protection awareness during inductions and anti-poaching policy to be Implemented fully.
1, Au access procedure for livestock and wildlife will be developed and implemented.
• Implement rescue procedures for wildlife trapped in the trenches.
• thAeWcasontetrachitortnurtulent Plan should be prepared by
• Procure the services of a NEMA licensed waste handler.
• Skips and bins should be strategically placed at the campsite and contents disposed of at an approved disposal site.
• Proponent shall continuo working in collaboration with Kerio Valley Development Authority
(KVDA) and KenGen to ensure that water volumes abstracted will not impact river flows.
Fire safety training/
Emergency Response
Procedures (ERPs
Psychological trauma to some neighbours
Loss of livelihood and economic ruin
Land degradation, excavations and soil erasion
Biodiversity impacts
Solid wastes generation
Water quantity, quality and pollution
Impacts Proposed Mitigation Measures
• Abstraction will not exceed the permitted rates.
• Undertake construction activities across Turkwel
River during low flow.
• Sediment control procedures to be implemented at the river crossing.
• Periodic water testing to monitor any contamination.
Wastewater • Develop and implement a site construction waste generation and wastewater management plan.
and disposal • Channel all liquid waste to an existing or install a new onsite waste management system based on the increased number of workers.
Noise and vibration impacts
• Develop and implement a site construction waste and wastewater management plan.
• Channel all liquid waste to an existing or install a new onsite waste management system based on the increased number of workers.
Air pollution • Have onsite dust management procedures.
• Institute prohibitions towards uncontrolled burning of waste.
• Water all active construction areas to lay dust using recycled water.
• Protect material stockpiles against wind-blown erosion.
• Cover all trucks hauling soil, sand and other loose materials.
• Provide workers with dust masks, facemasks and earmuffs/earplugs.
• Installation of oil-water separators and grease straps at refuelling facilities, workshops and parking yards in order to reduce potential contamination.
• Have appropriate procedures for handling, storage and disposal of hazardous material.
• Implement a traffic management plan and driving policy in consultation with KENHA and KeRRA, carry out periodic road maintenance of existing roads.
• Set driving procedures that include speed limits, no off-road driving and ensure all drivers adhere to it.
• Implement a grievance management procedure and follow up complaints.
• Dampen the roads using treated greywater during construction.
(dust generation and emissions)
Possible
Pollution from waste oil and fuel spills/ hazardous materials
Increased construction traffic flow
Visual impacts
• The site should be restored through backfilling and levelling.
Fire risks, • Develop an Emergency Response Plan (ERP) and accident a Fire Safety Plan.
prevention and emergency response plan
Occupational • Appoint a full-time HSE personnel and provide health and first aid facilities.
safety
• Ensure that HSE briefings are conducted prior to starting work.
• Keep a record of incidents and accidents on the site.
• Place portable fire extinguishers at suitable locations on the campsite.
• Ensure fire and safety warnings are prominently displayed within the camping areas.
1st April, 2022 THE KENYA GAZETTE 1785
Impacts Proposed Mitigation Measures
• All working areas clearly demarcated and secured.
• Prior notice and regular updates of activities to local communities, • Implement an emergency response plan for accidents that are associated with project activities.
• Have signage in the appropriate language in construction areas.
• The Contractor shall comply with all other requirements of the Occupational Safety and
Health Act, 2007.
• Fence the campsite to restrict movement and have security guards onsite.
• Training security providers on voluntary principles on security and human rights.
• Open trenches will be cordoned off through the use of hazard barriers on active sections of the pipeline to deter unauthorized entry.
• Conduct a programme on road safety awareness training for local communities.
• Traffic marshals shall be properly trained.
• No hiring at the gate policy to be implemented to reduce pressure on social infrastructure in the project area.
• Accommodate all non-local workfprce in designated campsites to reduce pressure on social facilities.
• Implement livelihood restoration plan.
• Landowners whose land will be taken shall be compensated by NLC in accordance with the existing laws.
• Develop and implement a grievance redress mechanism for disrupted activities such as fishing, grazing and farming etc.
Social issues • Implement an employment management plan and ensure equally distributed employment employment opportunities for the local communities.
and crime
• Develop a recruitment procedure that is non- discriminatory and transparent.
• Develop and implement a local content plan which should contain enterprise development and skill training.
• Sensitize the construction workers, locals, and security personnel to be on the lookout for suspicious activities.
• Drivers to undergo training.
• Vehicle monitoring.
• Speed controls.
• Zero alcohol policy.
• Daytime driving.
• Road safety awareness training for local communities where required based on risk assessment.
Safety and security measures
Pressure and disruption of public utilities
Loss of land or livelihoods
Community health, safety and security
Cultural heritage
• Cultural Heritage Management Plan and Chance
Find Procedure.
• Consultation with local communities before the commencement of construction activities.
• Proponent, contractors and affected communities shall agree on appropriate procedures and ceremonies for relocation.
Impacts Proposed Mitigation Measures
• All exhumations and re-internment shall be undertaken in accordance with procedures agreed with local communities.
• Site clearance will be undertaken under expert supervision.
Malaria, • Implement a malaria management and control
HIV/AIDS, plan.
STDs and other
• Initiate a sensitization and awareness campaign diseases on HIV/AIDS and STDs to workers.
• Have adequate sanitation amenities for the workers and employees.
Covid -19 • The Workplace should develop and implement prevention action plans to prevent and mitigate COVID-19.
and mitigation
The full report of the proposed project is available for inspection during working hours at:
(a) The Princila1 Secretary, Ministry of Environment and
Forestry, NHIF Building, 12th Floor, Ragati Road, Upper Hill, P.O. BOX: 30126-00100, Nairobi.
(b) Director-General, NEMA, Popo Road, off Mombasa Road, P.O. BOX 67839-00200, Nairobi.
(c) County Director of Environment, West Pokot and Turkana
Counties.
A copy of the EIA report can be downloaded at www.nema.go.ke
National Environmental Management Authority invites members of the public to submit oral or written comments within thirty (30) days from the date of publication of this notice to the Director General, NEMA, to assist the Authority in the decision-making process for this project.
MAMO B. MAMO, MR/326723S Director-General.
Dated the 1st April, 2022.
MAMO B. MAMO,
Extracted Entities (1)
previous_gazette_ref
3791
Details
- Act / Legislation
- THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
- Reference
- No. 8 of 1999
- Signed By
- MAMO B. MAMO
- Ministry
- Ministry of Environment
- Date Signed
- 1st April 2022
- Page
- 44
- Extraction Method
- regex
Source Gazette
Vol. CXXIV No. 58
Published 20th January 2022