Back
OTHER 74% confidence via regex

GAZETTE NOTICE NO. 9868

PURSUANT to Clause 5 of Part III of the Schedule of Tariffs 2018, notice is given that all prices for electrical energy specified in Part II -(A) of the said Schedule will be liable to a Water Resource Management Authority (WRMA) Levy of plus 1.74 cents per kWh for all meter readings taken in August 2022. Information used to calculate the WRMA Levy: Approved WRMA levy for energy purchased from hydropower plants of capacity equal to or above 1MW =5.00 Kenya cents per KWh Hydropower Plant Units Purchased in July 2022 (kWh) Gitaru 54,250,680 Kamburu 27,970,750 Kiambere 52,830,010 Kindaruma 12,339,790 Masinga 12,148,400 Tana 5,496,920 Wanjii 4,281,596 Sagana 349,589 Turkwel 48,016,020 Gogo 637,198 Sondu Miriu 22,956,000 Sangoro 7,214,280 Regen-Terem 1,109,520 Chania 61,220 Gura 960,711 Metumi 1,623,360 Total units purchased from hydropower plants with capacity equal to or above 1MW = 252,246,044 kWh Total units generated and purchased (G) excluding exports in July 2022 = 1,126,761,570 kWh DANIEL K. BARGORIA, MR/3253364 Director-General.

Extracted Entities (1)

previous_gazette_ref

9868

Details

Signed By
DANIEL K. BARGORIA
Title
Director-General
Page
19
Extraction Method
regex