GAZETTE NOTICE NO. 11187
PURSUANT to Clause 5 of Part III of the Schedule of Tariffs 2018, notice is given that all prices for Electrical Energy specified in Part II -(A) of the said Schedule will be liable to a Water Resource Management Authority (WRMA) Levy of Plus 1.26 Cents per kWh for all meter readings taken in September 2022
Information used to calculate the WRMA Levy:
Approved WRMA levy for energy purchased from hydropower plants of capacity equal to or above 1MW =5.00 Kenya cents per KWh
Hydropower Plant Units Purchased in August 2022 (kWh)
Gitaru 47,765,690
Kamburu 24,704,760
Kiambere 47,184,250
Kindaruma 10,770,660
Masinga 10,186,670
Tana 5,749,230
Wanjii 4,800,163
Sagana 503,036
Turkwel 52,432,090
Gogo 618,418
Sondu Miriu 35,424,000
Sangoro 11,386,050
Regen-Terem 2,557,760
Chania 37,406
Gura 914,665
Metumi 1,345,880
Total units purchased from hydropower plants with capacity equal to or above 1MW = 256,380,728 kWh
Total units generated and purchased (G) excluding exports in August 2022 = 1,111,174,429 kWh
DANIEL K. BARGORIA, MR/3253364 Director-General.
Extracted Entities (1)
previous_gazette_ref
11187
Details
- Signed By
- DANIEL K. BARGORIA
- Title
- Director-General
- Page
- 35
- Extraction Method
- regex
Source Gazette
Vol. CXXIV No. 190
Published 11th March 2022