GAZETTE NOTICE NO. 11187

PURSUANT to Clause 5 of Part III of the Schedule of Tariffs 2018, notice is given that all prices for Electrical Energy specified in Part II -(A) of the said Schedule will be liable to a Water Resource Management Authority (WRMA) Levy of Plus 1.26 Cents per kWh for all meter readings taken in September 2022 Information used to calculate the WRMA Levy: Approved WRMA levy for energy purchased from hydropower plants of capacity equal to or above 1MW =5.00 Kenya cents per KWh Hydropower Plant Units Purchased in August 2022 (kWh) Gitaru 47,765,690 Kamburu 24,704,760 Kiambere 47,184,250 Kindaruma 10,770,660 Masinga 10,186,670 Tana 5,749,230 Wanjii 4,800,163 Sagana 503,036 Turkwel 52,432,090 Gogo 618,418 Sondu Miriu 35,424,000 Sangoro 11,386,050 Regen-Terem 2,557,760 Chania 37,406 Gura 914,665 Metumi 1,345,880 Total units purchased from hydropower plants with capacity equal to or above 1MW = 256,380,728 kWh Total units generated and purchased (G) excluding exports in August 2022 = 1,111,174,429 kWh DANIEL K. BARGORIA, MR/3253364 Director-General.

Extracted Entities (1)

previous_gazette_ref

11187

Details

Signed By
DANIEL K. BARGORIA
Title
Director-General
Page
35
Extraction Method
regex