Back
OTHER 74% confidence via regex

GAZETTE NOTICE NO. 12775

PURSUANT to Clause 5 of Part III of the Schedule of Tariffs 2018, notice is given that all prices for electrical energy specified in Part II -(A) of the said Schedule will be liable to a Water Resource Management Authority (WRMA) Levy of plus 1.20 cents per kWh for all meter readings taken in October, 2022. Information used to calculate the WRMA levy: Approved WRMA levy for energy purchased from hydropower plants of capacity equal to or above 1MW =5.00 Kenya cents per KWh Hydropower Plant Units Purchased in September 2022 (kWh) Gitaru 44,679,680 Kamburu 23,772,370 Kiambere 46,984,820 Kindaruma 9,948,230 Masinga 8,327,950 Tana 4,118,670 Wanjii 4,181,022 Sagana 597,512 Turkwel 47,148,600 Gogo 791,727 Sondu Miriu 36,026,000 Sangoro 12,033,840 Regen-Terem 3,240,350 Chania 11,232 Gura 841,704 Metumi 845,200 Total units purchased from hydropower plants with capacity equal to or above 1MW = 243,548,907 kWh Total units generated and purchased (G) excluding exports in September 2022 = 1,099,340,544 kWh DANIEL K. BARGORIA, MR/3253364 Director-General.

Extracted Entities (1)

previous_gazette_ref

12775

Details

Signed By
DANIEL K. BARGORIA
Title
Director-General
Page
31
Extraction Method
regex