GAZETTE NOTICE NO. 15322

GAZETTE NOTICE NO. 15322

the Schedule of Tariffs 2018, notice is given that all prices for electrical energy specified in Part II -(A) of the said Schedule will be liable to a Water Resource Management Authority (WRMA) levy of plus 1.15 cents per kWh for all meter readings taken in December, 2022. Information used to calculate the WRMA levy: Approved WRMA levy for energy purchased from hydropower plants of capacity equal to or above 1MW =5.00 Kenya cents per KWh. Hydropower Plant Units Purchased in November 2022 (kWh) Gitaru 41,544,090 Kamburu 21,138,900 Kiambere 49,299,930 Kindaruma 9,826,300 Masinga 3,903,200 Tana 9,153,930 Wanjii 4,803,514 Sagana 913,283 Turkwel 38,560,150 Gogo 537,812 Sondu Miriu 36,021,000 Sangoro 11,538,260 Regen-Terem 2,426,320 Chania 17,470 Gura 1,471,281 Metumi 1,207,190 Total units purchased from hydropower plants with capacity equal to or above 1MW = 232,362,630 kWh Total units generated and purchased (G) excluding exports in November 2022 = 1,093,912,254 kWh DANIEL KIPTOO BARGORIA, MR/3253364 Director-General. 9012 NYA GAZI:1"IL 9th December, 2022 GAZE NOTICE No. 15323 THE CONSTITUTION

ACT


PURSUANT to Clause 5 of Part III of the Schedule of Tariffs 2018, notice is given that all prices for electrical energy specified in Part II -(A) of the said Schedule will be liable to a Water Resource Management Authority (WRMA) levy of plus 1.15 cents per kWh for all meter readings taken in December, 2022. Information used to calculate the WRMA levy: Approved WRMA levy for energy purchased from hydropower plants of capacity equal to or above 1MW =5.00 Kenya cents per KWh. Hydropower Plant Units Purchased in November 2022 (kWh) Gitaru 41,544,090 Kamburu 21,138,900 Kiambere 49,299,930 Kindaruma 9,826,300 Masinga 3,903,200 Tana 9,153,930 Wanjii 4,803,514 Sagana 913,283 Turkwel 38,560,150 Gogo 537,812 Sondu Miriu 36,021,000 Sangoro 11,538,260 Regen-Terem 2,426,320 Chania 17,470 Gura 1,471,281 Metumi 1,207,190 Total units purchased from hydropower plants with capacity equal to or above 1MW = 232,362,630 kWh Total units generated and purchased (G) excluding exports in November 2022 = 1,093,912,254 kWh DANIEL KIPTOO BARGORIA, MR/3253364 Director-General. 9012 NYA GAZI:1"IL 9th December, 2022 GAZE NOTICE No. 15323 THE CONSTITUTION OF KENYA THE COUNTY GOVERNMENTS ACT COUNTY ASSEMBLY OF MURAINCiA COUNTY ASSEMBLY OF MURANG'A STANDING ORDERS SPECIAL SITTINGS OF THE COUNTY ASSEMBLY NOTICE is given to all Members of the County Assembly of Murang'a and the general public that pursuant to Standing Order 31 of the Murang'a County Assembly Standing Orders, I have appointed Tuesday, December 13, 2022 as a day for special sittings of the County Assembly. The special sittings shall be held in the Murang'a County Assembly Chambers, opposite Ihura Stadium, Murang'a, at 9.30 a.m and 2:30 p.m., respectively. The business to be transacted at the special sitting, shall be: (a) Tabling of the Internship Policy. (h) Consideration and Adoption of Report on Agricultural Farm Inputs Subsidy Policy 2022 —2032 (c) Consideration and Adoption of Report on the Public Finance Management Act (Murang'a County Agricultural Farm Inputs Subsidy Fund Regulations), 2022. (d) Consideration of a Motion on Resolution to Petition the National Assembly on County Wards Equitable Development Fund. (e) Consideration of a Motion on Memorandum of Understanding on students studying abroad. In accordance with Standing Order 31 (5) of the Murang'a County Assembly Standing Orders, the business specified in this notice shall be the only business before the County Assembly during the special sitting, following which the County Assembly shall stand adjourned until such a date that will be notified in the gazette. Dated the 6th December, 2022. JOHNSON MUKUHA, MR/4242354 Speaker, Murang'a County Assembly.

Dated the 6th December, 2022.

JOHNSON MUKUHA,

Speaker, Murang'a County Assembly.

Extracted Entities (1)

previous_gazette_ref

15322

Details

Act / Legislation
the Schedule of Tariffs 2018, notice is given that all prices for electrical energy specified in Part II -(A) of the said Schedule will be liable to a Water Resource Management Authority (WRMA) levy of plus 1.15 cents per kWh for all meter readings taken in December, 2022. Information used to calculate the WRMA levy: Approved WRMA levy for energy purchased from hydropower plants of capacity equal to or above 1MW =5.00 Kenya cents per KWh. Hydropower Plant Units Purchased in November 2022 (kWh) Gitaru 41,544,090 Kamburu 21,138,900 Kiambere 49,299,930 Kindaruma 9,826,300 Masinga 3,903,200 Tana 9,153,930 Wanjii 4,803,514 Sagana 913,283 Turkwel 38,560,150 Gogo 537,812 Sondu Miriu 36,021,000 Sangoro 11,538,260 Regen-Terem 2,426,320 Chania 17,470 Gura 1,471,281 Metumi 1,207,190 Total units purchased from hydropower plants with capacity equal to or above 1MW = 232,362,630 kWh Total units generated and purchased (G) excluding exports in November 2022 = 1,093,912,254 kWh DANIEL KIPTOO BARGORIA, MR/3253364 Director-General. 9012 NYA GAZI:1"IL 9th December, 2022 GAZE NOTICE No. 15323 THE CONSTITUTION
Signed By
JOHNSON MUKUHA
Title
Speaker, Murang'a County Assembly
Date Signed
6th December 2022
Page
19
Extraction Method
regex