APPOINTMENT 100% confidence via regex

GAZETTE NOTICE NO. 15341

GAZETTE NOTICE NO. 15341

THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT

(No. 8 of 1999)

APPOINTMENT


PURSUANT to Regulation 21 of the Environmental Management and Co-ordination (Impact Assessment and Audit) Regulations, 2003, the National Environment Management Authority (NEMA) has received an Environmental Impact Assessment Study Report for the above proposed project. The proponent, Vendome Realty Limited, proposes to develop a residential apartments comprising of 2No. of basements, ground floor and 19No. of floors with a total of 244 units (8No. one bedroom, 2No. two bedroom and 4No. of three bedroom). Other features of the project include swimming pool, gym, multifunctional room, property room, and other associated facilities and amenities on Plot L.R. No. 1/776 and 1/778, along George Padmore Road, Kilimani, Nairobi City County. The following are the anticipated impacts and proposed mitigation measures: Possible Impacts Mitigation Measures Soil erosion • Control earthworks. Loss of vegetation Air pollution Noise pollution • Install drainage structures to control flow of storm water. • Ensure management of excavation activities. • Only areas earmarked for development should be cleared. • Plant trees, shrubs and flowers on remaining open spaces. • Stockpiles of earth should be sprayed with water or covered during dry seasons. • Provide dust masks for the personnel in dusty areas. • Sensitize construction workers on pollution control measurers Cover all trucks hauling soil, sand and other loose materials provide dust screen where necessary. • Install portable barriers to shield compressors and other small stationary equipment where necessary. • Display signs to indicate construction activities. • Maintain all equipment. • Adhere to provisions of Noise Prevention and Control Rules 2005, Legal notice no. 24 regarding noise limits at the 9th December, 2022 THE KENYA GAZETTE 9029 Possible Impacts Mitigation Measures workplace as well as NEMA Noise and Excessive Vibration Pollution Control Regulations, 2000. Road traffic disruption • No overloading of trucks and good driving practices to be practiced. • Suitable junction/access point to be provided. • Use of appropriate and legible signage. Employment of formal flagmen / women to ensure the public safety. Water sources • Observe, protect and conserve the riparian reserve in compliance with the water Act 2016 and water reserve management rules 118 (1). Increased generation of • Adopt waste minimization at source • Monitoring the fate of disposed wastes to ensure they are legally land filled at a recognized controlled site. • Adhering to Waste Management Regulations of 2006. • Ensure proper solid waste. disposal and occupational safety collection facilities Ensure dustbin cubicles are protected froml4nimals, rains and are well covered. i5 • Provide suitable safety ''ear for all personnel. • Proper treatment of waste water. •In • Adherence to the ministry of health guidelines on preventing spread of the SARS-CoV-19 virus. The full report of the proposed project is available for inspection during working hours at: (a) Principal Secretary, Ministry of Environment and Forestry, NHIF Building, 12th Floor, Ragati Road, Upper Hill, P.O. Box 30126-00100, Nairobi. (b) Director-General, NEMA, Popo Road, off Mombasa Road, P.O. Box 67839-00200, Nairobi. (c) County Director of Environment, Nairobi City County. A copy of the report can be downloaded at www.nema.go.ke The National Environment Management Authority invites members of the public to submit oral or written coinfnents within thirty (30) days from the date of publication of this notice to the Director-General, NEMA, to assist the Authority in the decision making process regarding this project. Comments can also be emailed to dgnema@nema.go.ke MAMO B. MAMO, Director-General, MR/4242120 National Environment Management. GAZE it NOTICE No. 15342 THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT (No. 8 of 1999) ENVIRONMENTAL IMPACT ASSESSMENT STUDY REPORT FOR PROPOSED RESIDENTIAL APARTMENTS ON PLOT L.R. NO. 1/413 (ORIGINAL NO. 1/23/2) ALONG CHANIA AVENUE, OFF RING ROAD, KILIMANI, KILIMANI AREA, NAIROBI CITY COUNTY waste Public health and • Provide soil erosion control and conservation structures. Changes in land • Plant vegetation after project completion. use- extent • Ensure compliance with existing planning policy. Changes in hydrology/ impended drainage/deep excavations • proper Installation of drainage structures. • Install cascades to break the impact of water flowing in the drains. • Ensure efficiency of drainage structures through proper design and maintenance. • Provide gratings to the drainage channels. • A geotechnical survey shall be conducted and the recommendations thereof followed. There shall be no blasting during excavation. • A methodology for excavation shall be generated as required by NCA prior to excavation. Air pollution • Enclose the site with dust-proof net during construction. • Water should be sprayed during the construction phase of excavated areas during dry conditions. • Control speed and operation of construction vehicles. INVITATION OF PUBLIC COMMENTS PURSUANT to Regulation 21 of the Environmental Management and Co-ordination (Impact Assessment and Audit) Regulations, 2003, the National Environment Management Authority (NEMA) has received an Environmental Impact Assessment Study Report for the above proposed project. The proponent, Jinye Company Limited, proposes to develop a residential block of two basements and 17 floors with a total of 323 units (119No. of one bedroom. 102No. of two bedrooms without DSQ and 102No. of two bedrooms with Dsq) parking bays, recreational park and other associated amenities and facilities on plot L.R. No. 1/413 (Original No. 1/23/2) along Chania Avenue, off Ring Road Kilimani, Kilimani Area, Nairobi City County. The following are the anticipated impacts and proposed mitigation measures: Impacts Proposed Mitigation Measures Soil disturbance • Control earthworks and compact loose soils. • Install drainage structures properly. • Landscaping shall be done on project completion. • Control and manage excavation soils. • Control activities especially during rainy conditions. Impacts Proposed Mitigation Measures high-level noise to wear safety and protective gear. Water resources • Management of water usage. Avoid unnecessary wastage. • recycling of water at the construction phase where possible. • Make use of roof catchments to provide water i.e. for general purpose. • An alternative water source shall be provided. The proponent shall drill a borehole at the proposed site. Power sources • Power supply requirements shall be calculated and shared with KPLC as is the requirement. A dedicated transformer for the entire project shall be a consideration. • Alternative power sources (solar) shall also be installed for lighting and heating. Oil pollution • Proper storage, handling and disposal of new oil and used oil wastes as per waste regulations. • Provide oil interceptors along the drains leading from car park and potentially oil risk areas. Public health, occupational health and safety Fire safety and preparedness Noise pollution • Prohibit idling of vehicles. • Ensure sound condition of construction machinery and equipment. • Engage sensitive construction workers. • Erect suitable barriers to control noise. • Sensitize drivers of construction machinery on effects of noise. • Maintain plant equipment (if present). • Construction activities to be restricted to daytime. • Workers in the vicinity of or involved in • Train staff/workers on occupational health and safety. • Provide full protective gear and workmen's compensation cover in addition to the right tools and operational instructions and manuals during construction. • Design of sewerage system should be as provided in the plans and should be constructed to approved size and design, standard and of approved materials. • Engage the services of qualified personnel and/or ensure training. • Ensure use of standard construction materials and to the specifications. Avoid undesirable, substandard, hazardous or unauthorized materials during construction and maintenance. • Sensitized staff on social/health issues such as drugs. • Post strategically the Occupational Safety and Health Act, 2007 Abstract • Post clear warning signs e.g. 'No unauthorized use of machines', ensure there are guards on moving parts, etc. • Provide fully equipped First Aid kits and train staff on its use • The site will be registered by the ministry of labour as a workplace. • Conduct training on firefighting, evacuation and emergency response. • Sensitize the residents on fire risks i.e. conduct regular fire drills. • Adapt effective emergency response plans. • Maintain/service firefighting machinery regularly. • Provide emergency numbers at strategic points. 9th December, 2022 THE KENYA GAZETTE 9031 Impacts Water quality and sewerage infrastructure Waste management Proposed Mitigation Measures • The design of the entire sewerage system should consider the estimate discharges from individual sources and the cumulative discharge of the entire project even during peak volumes. • Ensure effluents are discharged responsibly to the sewerage system. • The proponent shall seek approval from NWSC before connecting to the existing public mains. • Monitor quality of wastewater to ensure compliance with the Environmental Management and Co-ordination (Water Quality) Regulations, 2006 and other relevant Laws. • During construction phase, designate an area for temporarily holding waste materials. • All wastes should be disposed of in accordance with the Environmental Management and Co-ordination (Waste Management) Regulations, 2006 and other relevant Laws. THE INSOLVENCY ACT IN INSOLVENCY CAUSE NO. E20 OF 2022 RE: TITUS NGUGI WANGONDU —DEBTOR B.O. made on 4th November, 2022 BANKRUPTCY (Subsection 48 (3) of the Insolvency Act) TAKE NOTICE THAT: A Bankruptcy Order was made against Titus Ngugi Wangondu on the 4th November, 2022, and the Official Receiver was appointed as trustee of the estate of the bankrupt by the Court, subject to affirmation by the creditors of the trustee's appointment or substitution of another trustee by the creditors. Pursuant to section 254 (1) of the Insolvency Act, the bankrupt will be given an automatic discharge on the 4th November, 2025, unless the Official Receiver, the trustee of the estate of the bankrupt or a creditor of the bankrupt gives notice of intended opposition to the discharge of the bankrupt before that date. Any creditor who intends to oppose the discharge of the bankrupt shall state in writing the grounds for his/her opposition and send a notice to this effect to the Official Receiver, the trustee of the estate of the bankrupt and the bankrupt at any time before the 4th November, 2025. • Segregation of wastes at the source for ease of handling and disposal. • Contract a NEMA licensed waste transporter to transport solid waste from the proposed site during construction and occupation phases. Security and social • Provide security guards, CCTV cameras impacts and other security apparatus during the entire project cycle. • Construction work timings shall only in line with the NEMA licensing conditions. Traffic • The proponent shall conduct a traffic Management Impact Assessment and generate a traffic management plan. • The Traffic management plan shall be followed throughout the project cycle. The full report of the proposed project is available for inspection during working hours at: (a) Principal Secretary, Ministry of Environment and Forestry, NHIF Building, 12th Floor, Ragati Road, Upper Hill, P.O. Box 30126-00100, Nairobi. (b) Director-General, NEMA, Popo Road, off Mombasa Road, P.O. Box 67839-00200, Nairobi. (c) County Director of Environment, Nairobi City County. A copy of the report can be downloaded at www.nema.go.ke The National Environment Management Authority invites members of the public to submit oral or written comments within thirty (30) days from the date of publication of this notice to the Director-General, NEMA, to assist the Authority in the decision making process regarding this project. Comments can also be emailed to dgnema@nema.go.ke MAMO B. MAMO, Director-General, MR/4242120 National Environment Management.

Dated the 4th November, 2022.

MAMO B. MAMO,

Director-General, National Environment Management.

Extracted Entities (1)

previous_gazette_ref

15341

Details

Act / Legislation
THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
Reference
No. 8 of 1999
Section
section 48 (3)
Signed By
MAMO B. MAMO
Title
Director-General, National Environment Management
Date Signed
4th November 2022
Page
37
Extraction Method
regex