Back
APPROVAL 100% confidence via regex

GAZETTE NOTICE NO. 1309

GAZETTE NOTICE NO. 1309

THE WATER ACT

(No. 43 of 2016)

APPROVAL


in accordance to the requirements of section 139 of the Water Act 2016. After considering the application, the written and oral submissions by all stakeholders during the consultation period, and based on latest available data, WASREB has determined an upward tariff review for NARWASSCO is justified in order to improve service delivery, operate sustainably and protect consumer interests by meeting the tariff conditions attached to the tariff. WASREB gives a one (1) months’ notice to all existing and potential customers of NARWASSCO that the approved tariffs for the three financial years 2022/23, 2023/24, and 2024/25 shall be as follows: 1.0 Approved Tariff Structure 1.1 Water Tariff Structure for the period 2022/2023 to 2024/2025 Customer Category Approved Domestic/Residential Consumption Block in M³ Tariff (KSh/M3) 1-6 90.00 7-20. 125.00 21-50 135.00 51-100 145.00 101-300 160.00 >300 180.00 Commercial/industrial 1-50 125.00 51-100 145.00 101-300 160.00 >300 180.00 Government Institutions 1-50 125.00 51-100 145.00 101-300 160.00 >300 180.00 Schools, Universities and Colleges 1-600 110.00 601 - 1200. 140.00 >1200 160.00 Multi dwelling Units/ Gated Communities Per M3 130.00 Water Bowsing Points Per M3 130.00 Water Kiosks Per M3 35.00 1.2 Sewerage Tariff Structure for the period 2022/2022 to 2024/2025 (a) Consumers with a Water Connection Sewerage will be charged at 75% of the water volumes, billed at the tariff for water specified (in 1.1) above for all customer categories. (b) Consumers without a Water Connection Sewerage consumers without a water connection shall be charged as follows: • Domestic (Per single dwelling unit): KSh. 350 per month • All other categories: 75% of the volume of water consumed as per the metered source at the rates specified (in 1.1) above Note: All disconnected accounts (water only, sewer only and water + sewer shall be charged based on the average of the last three months’ charges before the disconnection. 1.3 Miscellaneous Charges 460 460 These shall be as follows: Item/Service Charge (KSh.) Water Deposit Category of Consumer Domestic 2,500 Retail shops less than 10m3 3,000 Retail shops more than 10m3 3,500 Bar, restaurants less than 15 m3 4,000 Bar, restaurants more than 15 m3 6,000 Hotel class “A” and “B” less than 150 m3 12,000 Hotel class “A” and “B” more than 150 m3 15000 Hotel class “C” and ‘D’ less than 150 m3 18,000 Hotel class “C” and ‘D’ more than 150 m3 20,000 Hospitals more than 150 m3 20,000 Health centres less than 150 m3 12,000 Schools and other institutions more than 200 m3 20,000 Schools less than 200 m3 10,000 Minor construction sites more than 200 m3 15,000 Major construction sites more than 300 m3 50,000 Light industries less than 200 m3 30,000 Medium industrial between 200 m3 and300 m3 50,000 Heavy industries more than 300 m3 100,000 Water kiosks 5,000 Customers with only sewer connection to be charged a deposit equivalent to water connection Other Charges Service New water connection fee – Connection size: ½ inch to 1 inch 2,500 New water connection fee – Connection size: 1.5 inches to 3 inches 7,500 New water connection fee – Connection size above 3inches 15,000 Water Reconnection fee – at meter point 1,000 Water Reconnection fee – at mains 5,000 and double deposit Tanker – 8000, 16,000 litres 2,500, 5,000 respectively per tanker within NARWASSCO area for all consumers Sale of water per m3 at bowsing point (own tanker) Replacement of stolen or damaged meters 100% of the market cost of the meter Meter testing on request 500 Sewer Connection- Residential/ Domestic 5,000 Sewer Connection- Commercial, Government, schools, Universities and Colleges 7,500 Sewer Connection- Industrial 15,000 Private sewer unblocking 2,500 Leak detection services 1,000 Sewer Reconnection fee 15,000 Statement of account fees 200 For cutting off the supply at the request of the consumer For turning on the supply otherwise than in respect of a first connection Exhauster Services (Company Exhauster) 5,000 for other customers and 4,000 for informal settlements Private Exhausters (Dumping into the company’s sewer system) 15,000 per Truck per month Penalties Illegal water connection, -Commercial, Industry, Construction (Fraud) 100,000 plus estimated consumption during the period of the illegality Item/Service Charge (KSh.) Illegal water connection, (Fraud) – Domestic 30,000 plus estimated consumption during the period of the illegality Overcharging (fraud) at water kiosk 15,000 Illegal sewer connection- Commercial, Industry, Construction 100,000 Illegal sewer connection- Domestic, Government, schools, Universities & Colleges 30,000 Self-reconnection after cut off for non- payment 5,000 and billing to be backdated from date of cut off Surcharge for tampering with meters (this to include meter removal, reversing of meter etc) 10,000 Surcharge for direct suction of water from the supply line using a pump 10,000 2.0 Analysis of Cost Structure Below is the summary of the projected Annual cost structure that makes up the total costs to be incurred by NARWASSCO during the tariff period: Expend iture Item 2019/20 Base Year 2020/21 2021/22 2022/23 2023/24 2024/25 Operati ons 84,304,543 78,901,625 84,820,313 88,794,380 92,944,064 97,034,212 Mainte nance 12,111,010 15,947,323 16,891,916 17,344,718 17,810,515 18,289,711 Regula tory Levy 3,135,349 3,262,275 3,329,234 3,649,424 3,849,435 4,015,151 Other Levies 822,165 886,516 930,842 977,384 1,026,253 1,077,566 Minor Invest ments - 625,542 781,928 2,793,600 2,543,600 2,543,600 Total Costs 100,373,067 99,623,281 106,754,233 113,559,506 118,173,867 122,960,240 Total Billing (KShs) 81,834,680 84,952,120 105,583,132 127,863,607 133,468,114 140,668,301 Collect ion Efficie ncy (%) 90% 89% 89% 90% 91% 92% Project ed Reven ue 73,468,509 75,433,925 93,968,987 115,077,246 121,455,984 129,414,837 Total Cost Covera ge 73% 76% 88% 101% 103% 105% 3.0 Conditions attached to the Tariff Approval The conditions attached to this approval which shall form part of the license conditions of Narok Water and Sewerage Services Company are: (i) Service Delivery Conditions attached to the Tariff Target 2021/2022 2022/2023 2023/2024 2024/2025 Water Coverage (%) 34 36 38 40 Water quality standards (%) 100% Compliance with Water Quality Standards Personnel Expenditure as % of O&M 36 36 36 36 Non-Revenue Water (%) 25 25 25 25 Hours of Supply (Hrs.) 8 10 12 14 Staff per 1000 connections 20 19 18 17 Maintenance Expenditure as % of O&M 16% 16% 16% 15% Metering ratio (%) 100 100 100 100 Collection Efficiency (%) 89% 90% 91% 92% 3rd February, 2023 THE KENYA GAZETTE Resale at Kiosk Regulate resale by kiosk vendors at KSh. 2 per 20-litres. Tariffs at kiosks must be displayed at strategic points for public awareness (ii) Annual budgets: The utility shall adhere to the budgetary levels set in the tariff during the tariff validity period. (iii) Surpluses: The surpluses projected to be realised shall be set aside to implement priority service delivery capital projects. NARWASSCO shall be required at the end of every financial year to identify the priority project to be implemented and obtain approval from WASREB. (iv) Catchment Protection: The utility shall undertake measures to conserve/ protect the catchment areas of their source of water as part of Corporate Social Responsibility. (v) Reporting: The utility shall submit to WASREB a quarterly performance report in the format provided. (vi) Creation of distinct water and sewer cost centres: NARWASSCO will ensure it creates separate water and sewer cost centres and maintains distinct record of operations of the two centres. (vii) Tariff Assessment: WASREB will carry out a tariff implementation review within the first 12 months of approval and implementation during which a joint assessment with the utility on the trend in Billing (Ksh) shall be carried out and status of implementation of the tariff evaluated. (viii) Customer re- categorisation for billing: NARWASSCO will separate individual domestic accounts from Multi-Dwelling Units accounts and migrate consumer billing data within the first 3 months of tariff approval and implementation of the tariff. The detailed report should be submitted to WASREB. Pursuant to this, the WSP shall bill all MDU / Gated communities at the recommended MDU/ Gated Community tariff for Water, Sewerage and other Miscellaneous charges specified in this tariff. (ix) Ring-Fencing of Capital Expenditure: The WSP to open a separate account for capital component of the tariff, to deposit the appropriate share of revenue into this account which is only to be used for capital expenditure and repayment of loans as provided for in the approved tariff. (x) Investments: The utility shall undertake the investments in Annex Annex 1—INVESTMENTS SUMMARY OF CAPITAL INVESTMENTS TO BE CARRIED OUT BY NAROK WATER AND SEWERAGE SERVICES COMPANY LTD. FOR THE PERIOD 2022/23 – 2024/25 NRW Reduction Plan 2022/23 2023/24 2024/25 Procurement and Installation of Regional Master Meter (Enda and Pulung'a Areas) 292,000 Procure, Install and test 2 NO, of DN 100 Flanged bulk water meter Provide and deliver DN100 GS, VJ Flanged adapter Supply and deliver a flanged sluice valve DN100 Construct a masonry 2 No Valve chambers, (2m length*1.2m depth * 1m wide) with a concrete cover Sub-Total 292,000 - - Procurement and Installation of Regional Master Meter (Mwemba and Majengo Area) 292,000 Procure, Install and test 2 NO, of DN 100 Flanged bulk water meter Provide and deliver DN100 GS, VJ Flanged adapter Supply and deliver a flanged sluice valve DN100 Construct a masonry 2 No Valve chambers, (2m length*1.2m depth * 1m wide) with a concrete cover Sub-Total - 292,000 - SUMMARY OF CAPITAL INVESTMENTS TO BE CARRIED OUT BY NAROK WATER AND SEWERAGE SERVICES COMPANY LTD. FOR THE PERIOD 2022/23 – 2024/25 Procurement and Installation of Regional Master Meter (Ololulung'a Scheme) 292,000 Procure, Install and test 2 NO, of DN 100 Flanged bulk water meter Provide and deliver DN100 GS, VJ Flanged adapter Supply and deliver a flanged sluice valve DN100 Construct a masonry 2 No Valve chambers, (2m length*1.2m depth * 1m wide) with a concrete cover Sub-Total - - 292,000 Procurement of 5 No pressure loggers 250,000 Customer Meter Replacement 500,000 500,000 500,000 Sub-Total 750,000 500,000 500,000 REPLACEMENT OF NWTP PUMPING SETS Procure, install and test 1NO vertical multistage Centrifugal pump coupled to a 3-phase motor complete with control panel capable of pumping 90m3/hour at a total head of 150 m 1,751,600 1,751,600 1,751,600 Supply and install appropriate electrical cables, earthing and accessories within the pump house Supply and install appropriate electrical cables, earthing and accessories within the pump house Sub-Total 1,751,600 1,751,600 1,751,600 Grand Total 2,793,600 2,543,600 2,543,600 JULIUS K. ITUNGA, MR/4245732 Ag. Chief Executive Officer.

Dated the 3rd February, 2023.

JULIUS K. ITUNGA,

Ag. Chief Executive Officer.

Extracted Entities (1)

previous_gazette_ref

1309

Details

Act / Legislation
THE WATER ACT
Reference
No. 43 of 2016
Section
section 72 (1)
Signed By
JULIUS K. ITUNGA
Title
Ag. Chief Executive Officer
Date Signed
3rd February 2023
Page
39
Extraction Method
regex