Back
APPROVAL
100% confidence
via regex
GAZETTE NOTICE NO. 1309
GAZETTE NOTICE NO. 1309
THE WATER ACT
(No. 43 of 2016)
APPROVAL
in accordance to the requirements of section 139 of the Water Act
2016.
After considering the application, the written and oral submissions by all stakeholders during the consultation period, and based on latest available data, WASREB has determined an upward tariff review for
NARWASSCO is justified in order to improve service delivery, operate sustainably and protect consumer interests by meeting the tariff conditions attached to the tariff.
WASREB gives a one (1) months’ notice to all existing and potential customers of NARWASSCO that the approved tariffs for the three financial years 2022/23, 2023/24, and 2024/25 shall be as follows:
1.0 Approved Tariff Structure
1.1 Water Tariff Structure for the period 2022/2023 to 2024/2025
Customer Category Approved
Domestic/Residential
Consumption
Block in M³
Tariff (KSh/M3)
1-6 90.00
7-20. 125.00
21-50 135.00
51-100 145.00
101-300 160.00
>300 180.00
Commercial/industrial
1-50 125.00
51-100 145.00
101-300 160.00
>300 180.00
Government
Institutions
1-50 125.00
51-100 145.00
101-300 160.00
>300 180.00
Schools, Universities and Colleges
1-600 110.00
601 - 1200. 140.00
>1200 160.00
Multi dwelling Units/
Gated Communities
Per M3 130.00
Water Bowsing Points Per M3 130.00
Water Kiosks Per M3 35.00
1.2 Sewerage Tariff Structure for the period 2022/2022 to 2024/2025
(a) Consumers with a Water Connection
Sewerage will be charged at 75% of the water volumes, billed at the tariff for water specified (in 1.1) above for all customer categories.
(b) Consumers without a Water Connection
Sewerage consumers without a water connection shall be charged as follows:
• Domestic (Per single dwelling unit): KSh. 350 per month
• All other categories: 75% of the volume of water consumed as per the metered source at the rates specified (in 1.1) above
Note: All disconnected accounts (water only, sewer only and water + sewer shall be charged based on the average of the last three months’ charges before the disconnection.
1.3 Miscellaneous Charges
460 460
These shall be as follows:
Item/Service Charge (KSh.)
Water Deposit
Category of Consumer
Domestic 2,500
Retail shops less than 10m3 3,000
Retail shops more than 10m3 3,500
Bar, restaurants less than 15 m3 4,000
Bar, restaurants more than 15 m3 6,000
Hotel class “A” and “B” less than 150 m3 12,000
Hotel class “A” and “B” more than 150 m3 15000
Hotel class “C” and ‘D’ less than 150 m3 18,000
Hotel class “C” and ‘D’ more than 150 m3 20,000
Hospitals more than 150 m3 20,000
Health centres less than 150 m3 12,000
Schools and other institutions more than 200 m3
20,000
Schools less than 200 m3 10,000
Minor construction sites more than 200 m3 15,000
Major construction sites more than 300 m3 50,000
Light industries less than 200 m3 30,000
Medium industrial between 200 m3 and300 m3 50,000
Heavy industries more than 300 m3 100,000
Water kiosks 5,000
Customers with only sewer connection to be charged a deposit equivalent to water connection
Other Charges
Service
New water connection fee – Connection size:
½ inch to 1 inch
2,500
New water connection fee – Connection size:
1.5 inches to 3 inches
7,500
New water connection fee – Connection size above 3inches
15,000
Water Reconnection fee – at meter point 1,000
Water Reconnection fee – at mains 5,000 and double deposit
Tanker – 8000, 16,000 litres 2,500, 5,000 respectively per tanker within
NARWASSCO area for all consumers
Sale of water per m3 at bowsing point (own tanker)
Replacement of stolen or damaged meters 100% of the market cost of the meter
Meter testing on request 500
Sewer Connection- Residential/ Domestic 5,000
Sewer Connection- Commercial, Government, schools, Universities and Colleges
7,500
Sewer Connection- Industrial 15,000
Private sewer unblocking 2,500
Leak detection services 1,000
Sewer Reconnection fee 15,000
Statement of account fees 200
For cutting off the supply at the request of the consumer
For turning on the supply otherwise than in respect of a first connection
Exhauster Services (Company Exhauster) 5,000 for other customers and
4,000 for informal settlements
Private Exhausters (Dumping into the company’s sewer system)
15,000 per
Truck per month
Penalties
Illegal water connection, -Commercial, Industry, Construction (Fraud)
100,000 plus estimated consumption during the period of the illegality
Item/Service Charge (KSh.)
Illegal water connection, (Fraud) – Domestic 30,000 plus estimated consumption during the period of the illegality
Overcharging (fraud) at water kiosk 15,000
Illegal sewer connection- Commercial, Industry, Construction
100,000
Illegal sewer connection- Domestic, Government, schools, Universities & Colleges
30,000
Self-reconnection after cut off for non- payment
5,000 and billing to be backdated from date of cut off
Surcharge for tampering with meters (this to include meter removal, reversing of meter etc)
10,000
Surcharge for direct suction of water from the supply line using a pump
10,000
2.0 Analysis of Cost Structure
Below is the summary of the projected Annual cost structure that makes up the total costs to be incurred by NARWASSCO during the tariff period:
Expend iture
Item
2019/20 Base Year
2020/21
2021/22 2022/23 2023/24 2024/25
Operati ons
84,304,543 78,901,625 84,820,313 88,794,380 92,944,064 97,034,212
Mainte nance
12,111,010 15,947,323 16,891,916 17,344,718 17,810,515 18,289,711
Regula tory
Levy
3,135,349 3,262,275 3,329,234 3,649,424 3,849,435 4,015,151
Other
Levies
822,165 886,516 930,842 977,384 1,026,253 1,077,566
Minor
Invest ments
- 625,542 781,928 2,793,600 2,543,600 2,543,600
Total
Costs
100,373,067 99,623,281 106,754,233 113,559,506 118,173,867 122,960,240
Total
Billing
(KShs)
81,834,680 84,952,120 105,583,132 127,863,607 133,468,114 140,668,301
Collect ion
Efficie ncy
(%)
90% 89% 89% 90% 91% 92%
Project ed
Reven ue
73,468,509 75,433,925 93,968,987 115,077,246 121,455,984 129,414,837
Total
Cost
Covera ge
73% 76% 88% 101% 103% 105%
3.0 Conditions attached to the Tariff Approval
The conditions attached to this approval which shall form part of the license conditions of Narok Water and Sewerage Services
Company are:
(i) Service Delivery Conditions attached to the Tariff
Target 2021/2022 2022/2023 2023/2024 2024/2025
Water Coverage (%) 34 36 38 40
Water quality standards (%) 100% Compliance with Water Quality Standards
Personnel Expenditure as % of O&M 36 36 36 36
Non-Revenue Water (%) 25 25 25 25
Hours of Supply (Hrs.) 8 10 12 14
Staff per 1000 connections 20 19 18 17
Maintenance Expenditure as
% of O&M 16% 16% 16% 15%
Metering ratio (%) 100 100 100 100
Collection Efficiency (%) 89% 90% 91% 92%
3rd February, 2023 THE KENYA GAZETTE
Resale at Kiosk
Regulate resale by kiosk vendors at KSh. 2 per
20-litres. Tariffs at kiosks must be displayed at strategic points for public awareness
(ii) Annual budgets: The utility shall adhere to the budgetary levels set in the tariff during the tariff validity period.
(iii) Surpluses: The surpluses projected to be realised shall be set aside to implement priority service delivery capital projects.
NARWASSCO shall be required at the end of every financial year to identify the priority project to be implemented and obtain approval from WASREB.
(iv) Catchment Protection: The utility shall undertake measures to conserve/ protect the catchment areas of their source of water as part of Corporate Social Responsibility.
(v) Reporting: The utility shall submit to WASREB a quarterly performance report in the format provided.
(vi) Creation of distinct water and sewer cost centres: NARWASSCO will ensure it creates separate water and sewer cost centres and maintains distinct record of operations of the two centres.
(vii) Tariff Assessment: WASREB will carry out a tariff implementation review within the first 12 months of approval and implementation during which a joint assessment with the utility on the trend in Billing (Ksh) shall be carried out and status of implementation of the tariff evaluated.
(viii) Customer re- categorisation for billing: NARWASSCO will separate individual domestic accounts from Multi-Dwelling
Units accounts and migrate consumer billing data within the first
3 months of tariff approval and implementation of the tariff. The detailed report should be submitted to WASREB.
Pursuant to this, the WSP shall bill all MDU / Gated communities at the recommended MDU/ Gated Community tariff for Water, Sewerage and other Miscellaneous charges specified in this tariff.
(ix) Ring-Fencing of Capital Expenditure: The WSP to open a separate account for capital component of the tariff, to deposit the appropriate share of revenue into this account which is only to be used for capital expenditure and repayment of loans as provided for in the approved tariff.
(x) Investments: The utility shall undertake the investments in
Annex
Annex 1—INVESTMENTS
SUMMARY OF CAPITAL INVESTMENTS TO BE CARRIED
OUT BY NAROK WATER AND SEWERAGE SERVICES
COMPANY LTD. FOR THE PERIOD 2022/23 – 2024/25
NRW Reduction Plan 2022/23 2023/24 2024/25
Procurement and Installation of
Regional Master Meter (Enda and
Pulung'a Areas)
292,000
Procure, Install and test 2 NO, of DN
100 Flanged bulk water meter
Provide and deliver DN100 GS, VJ
Flanged adapter
Supply and deliver a flanged sluice valve DN100
Construct a masonry 2 No Valve chambers, (2m length*1.2m depth *
1m wide) with a concrete cover
Sub-Total 292,000 - -
Procurement and Installation of
Regional Master Meter (Mwemba and Majengo Area)
292,000
Procure, Install and test 2 NO, of DN
100 Flanged bulk water meter
Provide and deliver DN100 GS, VJ
Flanged adapter
Supply and deliver a flanged sluice valve DN100
Construct a masonry 2 No Valve chambers, (2m length*1.2m depth *
1m wide) with a concrete cover
Sub-Total - 292,000 -
SUMMARY OF CAPITAL INVESTMENTS TO BE CARRIED
OUT BY NAROK WATER AND SEWERAGE SERVICES
COMPANY LTD. FOR THE PERIOD 2022/23 – 2024/25
Procurement and Installation of
Regional Master Meter (Ololulung'a
Scheme)
292,000
Procure, Install and test 2 NO, of DN
100 Flanged bulk water meter
Provide and deliver DN100 GS, VJ
Flanged adapter
Supply and deliver a flanged sluice valve DN100
Construct a masonry 2 No Valve chambers, (2m length*1.2m depth *
1m wide) with a concrete cover
Sub-Total - - 292,000
Procurement of 5 No pressure loggers 250,000
Customer Meter Replacement 500,000 500,000 500,000
Sub-Total 750,000 500,000 500,000
REPLACEMENT OF NWTP
PUMPING SETS
Procure, install and test 1NO vertical multistage Centrifugal pump coupled to a 3-phase motor complete with control panel capable of pumping
90m3/hour at a total head of 150 m
1,751,600 1,751,600 1,751,600 Supply and install appropriate electrical cables, earthing and accessories within the pump house
Supply and install appropriate electrical cables, earthing and accessories within the pump house
Sub-Total 1,751,600 1,751,600 1,751,600
Grand Total 2,793,600 2,543,600 2,543,600
JULIUS K. ITUNGA, MR/4245732 Ag. Chief Executive Officer.
Dated the 3rd February, 2023.
JULIUS K. ITUNGA,
Ag. Chief Executive Officer.
Extracted Entities (1)
previous_gazette_ref
1309
Details
- Act / Legislation
- THE WATER ACT
- Reference
- No. 43 of 2016
- Section
- section 72 (1)
- Signed By
- JULIUS K. ITUNGA
- Title
- Ag. Chief Executive Officer
- Date Signed
- 3rd February 2023
- Page
- 39
- Extraction Method
- regex
Source Gazette
Vol. CXXV No. 26
Published 9th January 2023