GAZETTE NOTICE NO. 1563

PURSUANT to Clause 5 of Part III of the Schedule of Tariffs 2018, notice is given that all prices for electrical energy specified in Part II -(A) of the said Schedule will be liable to a Water Resource Management Authority (WRMA) levy of plus 0.84 cents per kWh for all meter readings taken in February 2023. Information used to calculate the WRMA levy: Approved WRMA levy for energy purchased from hydropower plants of capacity equal to or above 1MW =5.00 Kenya cents per KWh Hydropower Plant Units Purchased in January 2023 (kWh) Gitaru 29,816,610 Kamburu 15,715,300 Kiambere 45,623,450 Kindaruma 6,763,120 Masinga 5,431,430 Tana 5,642,650 Wanjii 4,276,594 Sagana 451,039 Turkwel 41,038,560 Gogo 393,144 Sondu Miriu 20,295,000 Sangoro 6,332,830 Regen-Terem 822,390 Chania 3,653 Gura 906,314 Metumi 1,169,690 Total units purchased from hydropower plants with capacity equal to or above 1MW = 184,681,774 kWh Total units generated and purchased (G) excluding exports in January 2023 = 1,134,015,692kWh DANIEL K. BARGORIA, MR/4257629 Director-General.

Extracted Entities (1)

previous_gazette_ref

1563

Details

Signed By
DANIEL K. BARGORIA
Title
Director-General
Page
36
Extraction Method
regex