GAZETTE NOTICE NO. 1563
PURSUANT to Clause 5 of Part III of the Schedule of Tariffs 2018, notice is given that all prices for electrical energy specified in Part II -(A) of the said Schedule will be liable to a Water Resource Management Authority (WRMA) levy of plus 0.84 cents per kWh for all meter readings taken in
February 2023.
Information used to calculate the WRMA levy:
Approved WRMA levy for energy purchased from hydropower plants of capacity equal to or above 1MW =5.00 Kenya cents per KWh
Hydropower Plant Units Purchased in January 2023 (kWh)
Gitaru 29,816,610
Kamburu 15,715,300
Kiambere 45,623,450
Kindaruma 6,763,120
Masinga 5,431,430
Tana 5,642,650
Wanjii 4,276,594
Sagana 451,039
Turkwel 41,038,560
Gogo 393,144
Sondu Miriu 20,295,000
Sangoro 6,332,830
Regen-Terem 822,390
Chania 3,653
Gura 906,314
Metumi 1,169,690
Total units purchased from hydropower plants with capacity equal to or above 1MW = 184,681,774 kWh
Total units generated and purchased (G) excluding exports in January 2023 = 1,134,015,692kWh
DANIEL K. BARGORIA, MR/4257629 Director-General.
Extracted Entities (1)
previous_gazette_ref
1563
Details
- Signed By
- DANIEL K. BARGORIA
- Title
- Director-General
- Page
- 36
- Extraction Method
- regex
Source Gazette
Vol. CXXV No. 30
Published 1st January 2023