Back
REGULATION 100% confidence via regex

GAZETTE NOTICE NO. 4523

GAZETTE NOTICE NO. 4523

THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT

(No. 8 of 1999)

REGULATION


PURSUANT to Regulation 21 of the Environmental Management and Co-ordination (Impact Assessment and Audit) Regulations 2003, the National Environment Management Authority (NEMA) has received an Environmental Impact Assessment Study Report for the above-proposed project. The proponent, Canaan Infratech LLP proposes to develop a residential block with one basement, ground floor, podium one and two and twenty two (22) floors. The proposed project will comprise of a total of 140 units (50 No. two bedroom duplexes, and 90 No. one bedroom duplexes), swimming pool, parking spaces, lifts/ staircases and associated facilities and amenities. The project will be located on L.R. No. 205/76 (Original No. 205/1615) off Riverside Lane in Riverside Area, Nairobi City County. The following are the anticipated impacts and proposed mitigation measures: Impact Proposed Mitigation Measure Waste management • Waste minimization by ordering right/accurate quantities and sizes rather 1616 1616 Impact Proposed Mitigation Measure than cutting to sizes leaving wastes or ordering excess quantities leaving residuals. • Reduction and segregation of waste at source and suitable bins properly labeled to facilitate recycle and/or sound disposal. • Engage the services of NEMA registered waste collector for disposal of solid waste. • Sound waste management system by incorporating suitable facilities for collection, segregation and safe disposal of solid wastes to support recycling and reuse. • Proper storage, handling and disposal of new and used oil. • Installation of sanitary systems that use less water. • Connection to sewer for wastewater disposal. • Ensure compliance with Waste Management Regulations, 2006. • Connection to sewer. Constraints to infrastructure and services • Liason with respective service providers for installation/expansion. • Adequate provision for infrastructure and services. • Installation of internal infrastructure (drainage, water, roads, sewer, parking, rain water harvesting and storage etc) to best standards. • Installation of transformer(s) and supplementary sources such as solar systems. • Development of a Traffic Management Plan. • Adoption of green building technologies. Soil disturbance and erosion • Control earthworks and compact loose soils. • Install drainage structures properly. • Landscaping on project completion. • Control and manage excavation activities. • Provide soil erosion control and conservation structures/means where necessary. • Ensure standard appropriate practices. • Efficient drainage structures by proper design, construction and maintenance. Air pollution • Enclose the site with suitable dust screens. • Sprinkle water to dry soils in excavated areas and earth roads to suppress dust. • Covering friable material loads during transportation. • Sound condition of machinery and equipment. • Strict adherence to Air Quality Regulations, 2014. Impact Proposed Mitigation Measure Noise pollution • Erect suitable barriers to control noise. • Maintain machinery, plant equipment. • Construction activities to be restricted between 8 a.m. – 5 p.m. • Workers exposed to high-level noise to wear safety and protective gear. • Adherence to Noise and Excessive Vibration Pollution (Control) Regulations, 2009. Increased pressure on resources • Adoption of green building technologies. • Conservation of resources; use of renewable resources. • rain water harvesting and storage. • installation of solar energy systems. • Sourcing materials from environmentally compliant suppliers/sources. • Use of recyclable materials. • Installation of water conserving taps and facilities. • waste water recycling and reuse. • Drilling of borehole. • Installation of transformer(s) and supplementary sources such as solar systems and standby generators. • Ensure electrical equipment, appliances and lights are switched off when not being used. • Design to provide for adequate natural lighting and ventilation. Public health, occupational health and safety • Train staff/workers on occupational health and safety. • Provide full PPEs and workmen’s compensation cover in addition to the right tools and operational instructions and manuals. • Design and disseminate appropriate emergency response plans. • Installation and maintenance of fire prevention, control and management measures. • Ensure machinery and equipment servicing and maintenance as per schedules and legal requirements. • Ensure adherence OSHA, 2007. • Ensure use of standard construction materials and to the specifications. Avoid undesirable, substandard, hazardous or unauthorized materials during construction and maintenance. • Provide fully equipped First Aid kits and train staff on its use. • Provide bill boards at the site/entrance to notify motorists and public about the development. • Waste water management installations (e.g. Sewers) be isolated from water pipes to avoid contamination of domestic water. River protection • Strictly abide by the provisions of the Water Act and the Environmental Management (Water Quality) Regulations; (Wetlands, River banks, 6th April, 2023 THE KENYA GAZETTE Impact Proposed Mitigation Measure Lake shores and Sea shores) Regulations and (Waste Management) Regulations. • Ensure no construction within the WRA pegged riparian (10 meters). • Sound liquid and solid waste management system. • Conservation and sound management of riparian section. • Adopt sound construction practices including avoidance of excavations too near to the river bed, controlled earth works and avoidance of soil dumping. • Provision and maintenance of riparian buffer • Soil erosion controls. • Conserve existing and introduce friendly vegetation such as bamboo at the riparian section and manage the same appropriately. The full report of the proposed project is available for inspection during working hours at: (a) The Principal Secretary, Ministry of Environment and Forestry, N.H.IF. Building, 12th Floor, Ragati Road, Upper Hill, P.O. Box 30126–00100, Nairobi. (b) Director-General, NEMA, Popo Road, off Mombasa Road, P.O. BNox 67839–00200, Nairobi. (c) County Director of Environment, Nairobi City County. A copy of the EIA report can be downloaded at www.nema.go.ke NEMA invites members of the public to submit oral or written comments within thirty (30) days from the date of publication of this notice to the Director-General, NEMA to assist the Authority in the decision making process for this project. Comments can also be e-mailed to dgnema@nema.go.ke MAMO B. MAMO, Director-General, MR/5161958 National Environment Management.

Dated the 6th April, 2023.

MAMO B. MAMO,

Director-General, National Environment Management.

Extracted Entities (1)

previous_gazette_ref

4523

Details

Act / Legislation
THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
Reference
No. 8 of 1999
Signed By
MAMO B. MAMO
Title
Director-General, National Environment Management
Date Signed
6th April 2023
Page
51
Extraction Method
regex