GAZETTE NOTICE NO. 6207

PURSUANT to Clause 5 of Part III of the Schedule of Tariffs 2018, notice is given that all prices for electrical energy specified in Part II -(A) of the said Schedule will be liable to a Water Resource Management Authority (WRMA) levy of plus 1.10 cents per kWh for all meter readings taken in May, 2023. Information used to calculate the WRMA levy: Approved WRMA levy for energy purchased from hydropower plants of capacity equal to or above 1MW =5.00 Kenya cents per KWh Hydropower Plant Units Purchased in April 2023 (kWh) Gitaru 25,149,220 Kamburu 13,298,930 Kiambere 35,190,910 Kindaruma 5,395,710 Masinga 2,248,320 Tana 8,984,770 Wanjii 4,484,859 Sagana 891,321 Turkwel 35,821,400 Gogo 568,212 Sondu Miriu 41,536,163 Sangoro 13,541,668 Regen-Terem 865,780 Chania 17,116 Gura 1,279,104 Metumi 1,139,990 Total units purchased from hydropower plants with capacity equal to or above 1MW = 190,413,472 kWh Total units generated and purchased (G) excluding exports in April, 2023 = 1,075,935,087 kWh DANIEL K. BARGORIA, MR/4257629 Director-General.

Extracted Entities (1)

previous_gazette_ref

6207

Details

Signed By
DANIEL K. BARGORIA
Title
Director-General
Page
25
Extraction Method
regex