Back
OTHER 74% confidence via regex

GAZETTE NOTICE NO. 10536

PURSUANT to Clause 5 of Part III of the Schedule of Tariffs 2023, notice is given that all prices for electrical energy specified in Part II-(A) of the said Schedule will be liable to a Water Resource Management Authority (WRMA) levy of plus 1.48 cents per kWh for all meter readings taken in August, 2023. Information used to calculate the WRMA levy: Approved WRMA levy for energy purchased from hydropower plants of capacity equal to or above 1MW=5.00 Kenya cents per KWh Hydropower Plant Units Purchased in July, 2023 (kWh) Gitaru 61,095,190 Kamburu 31,410,220 Kiambere 48,992,560 Kindaruma 14,209,830 Masinga 10,657,980 Tana 6,719,560 Wanjii 4,645,933 Sagana 408,826 Turkwel 41,676,000 Gogo 456,512 Sondu Miriu 41,357,154 Sangoro 14,085,937 Regen-Terem 1,515,210 Chania 20,460 Gura 530,827 Metumi 1,273,630 Total units purchased from hydropower plants with capacity equal to or above 1MW = 279,055,829 kWh Total units generated and purchased (G) excluding exports in July, 2023 = 1,155,944,688 kWh DANIEL K. BARGORIA, MR/4257629 Director-General.

Extracted Entities (1)

previous_gazette_ref

10536

Details

Signed By
DANIEL K. BARGORIA
Title
Director-General
Page
28
Extraction Method
regex