Back
APPROVAL
74% confidence
via regex
GAZETTE NOTICE NO. 10540
GAZETTE NOTICE NO. 10540
THE WATER ACT
(No. 43 of 2016)
APPROVAL
in accordance with the requirements of section 139 of the Water Act, 2016.
After considering the application, the written and oral submissions by all stakeholders during the consultation period, and based on latest available data, WASREB has determined an upward tariff review for MAWASCO is justified to improve service delivery, operate sustainably and protect consumer interests by meeting the tariff conditions attached to the tariff.
WASREB gives a one (1) months’ notice to all existing and potential customers of MAWASCO that the approved tariffs for the three financial years, 2023/2024, 2024/2025 and 2025/2026 shall be as follows:
(j) Approved Tariff Structure
1.1 Water Tariff Structure for the Period 2023/2024 to 2025/2026
Customer Category
Consumption Block in M³ Approved Tariff (KSh/M3)
Domestic/Residential 1-6 105
7-20. 150
21-50 180
51-100 200
101-300 220
>300 240
Multi-Dwelling Units Per M3 150
Commercial/Industrial/Government/Institutions 1-50 150
51-100 170
101-300 190
>300 225
Schools, Universities and Colleges 1-600 150
601 - 1200. 160
>1200 170
Water Kiosks Per M3 50
Bowsing Points Per M3 180
Bulk Water for resale Per M3 70
Customers with non- functional meters shall be billed based on the average of the last three months’ bills.
1.2 Miscellaneous Charges
These shall be as follows:
Item/ Service Charge (KSh.)
Water Deposit
Category of consumer
Domestic 2,500
Retail shops less than 10m3 3,000
Retail shops more than 10m3 3,500
Bar, restaurants less than 15 m3 4,000
Bar, restaurants more than 15 m3 6,000
Hotel less than 150 m3 12,000
Hotel more than 150 m3 15,000
Hospitals more than 150 m3 20,000
Health centres less than 150 m3 12,000
Schools less than 200 m3 10,000
Schools and other institutions more than 200 m3 20,000
Minor construction sites more than 200 m3 15,000
Major construction sites more than 300 m3 50,000
Light industries less than 200 m3 30,000
Medium industrial between 200 m3 and 300 m3 50,000
Heavy industries more than 300 m3 100,000
Water kiosks 5,000
*Customers with only sewer connection to be charged a deposit equivalent to water deposit
Other Charges
Service
New water connection fee 2,500
Water Reconnection fee – at meter point 1,000
Water Reconnection fee – at mains 5,000 and double deposit
Tanker – 8000, 16,000 litres 2,500, 5,000 respectively per tanker within WSP Service Area for all consumers
3444 3444
Sale of water per m3 at bowsing point (own tanker) 180
Replacement of stolen or damaged meters 100% of the market cost of the meter
Meter testing on request 500
Sewer Connection– Residential/ Domestic 2,500
Sewer Connection-Commercial, Government, schools, Universities and
Colleges
5,000
Sewer Connection–Industrial 15,000
Private sewer unblocking 2,500
Leak detection services 1,000
Sewer Reconnection fee (At mains) 15,000
For cutting off the supply at the request of the consumer 200
For turning on the supply otherwise than in respect of a first connection 200
Exhauster Services (Company Exhauster) 5,000 for other customers and 4,000 for informal settlements
Private Exhausters (Dumping into the company’s sewer system) 15,000 per truck per month
Penalties
Illegal water connection, –Commercial, Industry, Construction (Fraud) 100,000 plus estimated consumption during the period of the illegality
Illegal water connection, (Fraud) – Domestic 30,000 plus estimated consumption during the period of the illegality
Overcharging (fraud) at water kiosk 15,000
Illegal sewer connection– Commercial, Industry, Construction 100,000
Illegal sewer connection– Domestic, Government, Schools, Universities and
Colleges
30,000
Self-reconnection after cut off for non-payment 5,000 and billing to be backdated from date of cut off
Surcharge for tampering with meters (this to include meter removal, reversing of meter etc)
5,000
Surcharge for direct suction of water from the supply line using a pump 10,000
2.0 Analysis of Cost Structure
Below is the summary of the approved cost structure that makes up the total costs to be incurred by MAWASCO during the tariff period:
Expenditure Item 2023/2024 2024/2025 2025/2026
Operations 593,472,880 609,386,162 626,163,063
Maintenance 68,216,254 71,620,841 75,202,296
Regulatory Levy (WASREB) 33,744,801 33,790,264 33,836,636
Minor Investments 48,900,000 30,200,000 22,200,000
Debt Repayment 26,120,753 26,120,753 13,060,377
Total Costs 770,454,688 771,118,020 770,462,371
Total Billing (KSh.) 815,205,815 815,774,100 816,353,750
Collection Efficiency (%) 95% 95% 95%
Projected Revenue 774,445,525 774,985,395 775,536,062
O and M Cost Coverage 111% 108% 105%
Total Cost Coverage 101% 101% 101%
3.0 Conditions Attached to the Tariff Approval
The conditions attached to this approval which shall form part of the license conditions of Malindi Water and Sewerage Company are:
(i) Service Delivery Conditions attached to the Tariff.
Target 2023/2024 2024/2025 2025/2026
Water Coverage (%) 82% 83% 84%
Water Quality Standards (%) 100% Compliance with Standards
Personnel Expenditure as % of O and
M
31% 32% 32%
Non-Revenue Water 25% 25% 25%
Hours of Supply (Hrs.) 22 23 24
Staff per 1000 connections 7 6 5
Metering ratio (%) 100% 100% 100%
Collection Efficiency (%) 95% 95% 95%
Resale at Kiosk KSh. 3.00 per 20 litres.
Tariffs at kiosks must be displayed at strategic points for public awareness
(ii) Annual budgets: The utility shall adhere to the budgetary levels set in the tariff.
(iii) Surplus: The surpluses projected to be realised shall be used on priority infrastructure projects identified by MAWASCO and Approved by
WASREB.
(iv) Customer re-categorisation for billing: MAWASCO will separate individual domestic accounts from Multi-Dwelling Units (MDU) accounts and bill as per the approved tariff.
(v) Creation of distinct water and sewer cost centres: MAWASCO to create separate water and sewerage cost centres and maintains distinct record of operations of the two centres.
(vi) Repayment of Loans: MAWASCO shall remit monthly loan repayments to Coast Water Works Development Agency (CWWDA) as detailed below: -
11th August, 2023 THE KENYA GAZETTE
Financing 2023/2024 2024/2025 2025/2026
WASSIP 1 and WASSIP AF (KSh.) 26,120,753 26,120,753 13,060,377
Evidence of loan repayment to shall be submitted to WASREB by the 10th day of the following month.
(vii) Reporting: The utility shall submit to WASREB a quarterly tariff performance report in the format provided. WASREB will carry out tariff implantation review at the end of each year of implementation.
(viii) Investments: The utility shall undertake the investments in Annex 1 and submit quarterly progress reports.
Annex 1
Investment Summary for Malindi Water and Sewerage Water Company Limited (MAWASCO)
Targeted Outcome Intervention 2023/2024 2024/2025 2025/2026
Increased Water Coverage New Connections 12,000,000 12,000,000 12,000,000
Sub - Total _New Connections 12,000,000 12,000,000 12,000,000
Non - Revenue Water
Reduction
Calibration of at least 50% of the customer meters 1,000,000 2,000,000
Acquisition of digital maps, Mapping out all the water infrastructure 8,700,000
Meter Replacement 4,200,000 4,200,000 4,200,000
Sub - Total _ NRW Reduction 13,900,000 6,200,000 4,200,000
Movable Assets Motorcycles 3,000,000 2,000,000 1,000,000
Sub - Total Movable Assets 3,000,000 2,000,000 1,000,000
Network Rehabilitation
Replacement of Bungale –Dakacha 10km dilapidated pipelines with HDPE Pipeline 20,000,000 10,000,000 5,000,000
Sub - Total _ Network Rehabilitation 20,000,000 10,000,000 5,000,000
Total Investments 48,900,000 30,200,000 22,200,000
JULIUS ITUNGA
Ag. Chief Executive Officer, MR/5166662 Water Services Regulatory Board.
Dated the 11th August, 2023.
Extracted Entities (1)
previous_gazette_ref
10540
Details
- Act / Legislation
- THE WATER ACT
- Reference
- No. 43 of 2016
- Section
- section 72 (1)
- Date Signed
- 11th August 2023
- Page
- 35
- Extraction Method
- regex
Source Gazette
Vol. CXXV No. 180
Published 8th May 2023