Back
OTHER 89% confidence via regex

GAZETTE NOTICE NO. 14036

PURSUANT to Clause 5 of Part III of the Schedule of Tariffs 2023, notice is given that all prices for electrical energy specified in Part II -(A) of the said Schedule will be liable to a Water Resource Management Authority (WRMA) levy of plus 1.36 cents per kWh for all meter readings taken in October, 2023. Information used to calculate the WRMA levy: Approved WRMA levy for energy purchased from hydropower plants of capacity equal to or above 1MW =5.00 Kenya cents per KWh Hydropower Plant Units Purchased in September, 2023 (kWh) Gitaru 55,975,310 Kamburu 28,342,850 Kiambere 61,778,280 Kindaruma 12,889,510 Masinga 8,310,870 Tana 4,746,440 Wanjii 3,729,007 Sagana 281,414 13th October, 2023 THE KENYA GAZETTE Hydropower Plant Units Purchased in September, 2023 (kWh) Turkwel 39,497,000 Gogo 415,973 Sondu Miriu 19,882,878 Sangoro 7,996,307 Regen-Terem 1,845,900 Chania 6,056 Gura 417,266 Metumi 731,610 Total units purchased from hydropower plants with capacity equal to or above 1MW = 246,846,670 kWh Total units generated and purchased (G) excluding exports in September 2023 = 1,114,853,702 kWh DANIEL K. BARGORIA, MR/4257629 Director-General.

Extracted Entities (1)

previous_gazette_ref

14036

Details

Signed By
DANIEL K. BARGORIA
Title
Director-General
Date Signed
13th October 2023
Page
36
Extraction Method
regex