GAZETTE NOTICE NO. 13561
GAZETTE NOTICE NO. 13561
THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
(No. 8 of 1999)
RESTORATION
PURSUANT to Regulation 21 of the Environmental Management and Coordination (Impact Assessment and Audit) Regulations, 2003, the National Environment Management Authority (NEMA) has received an Environmental Impact Assessment Study Report for the above proposed project.
The proponent, Kilindini Waste Hub Limited proposes to set up integrated waste management site to engage in waste management and disposal activities on a 9 acre piece of land within the county and its environs on plot No. 6216 Mnyenzeni, Mzizi Area, Tsangatsini
Location, Kaloleni Sub-County, off Mombasa–Nairobi Highway within Kilifi County.
The following are the anticipated impacts and proposed mitigation measures:
Impacts Mitigation measures
Loss of flora and fauna
(Biodiversity loss)
• The contractor will ensure proper demarcation of the project area to be affected by the construction works; Strict control of construction vehicles to ensure that they operate only within the area to be disturbed by access routes and other works.
• The proposed project site will be rehabilitated through the rehabilitation plan to be developed by the proponent to try and retain the natural flora and fauna during the operation phase.
• This will entail progressive planting of native trees within the boundary of the site.
• Introduction of vegetation (trees, shrubs and grass) on open spaces within and around the site. Indigenous species would be preferred.
Physical disturbance of the project area
• The excavation and landscaping design shall not interfere with local drainage or change the topography or introduce physical changes that are not in harmony with the physical setting of the project area.
• The project components and associated structures will be aesthetically acceptable to blend in with the surroundings.
• Complete the works to ensure that natural aesthetics shall be retained at the locations.
• Restoration shall be undertaken to ensure that the original setting is as much as possible retained.
• Ensure that there is minimal disturbance to the topography of the area.
Water quality and effluent management
• Create awareness among the staff on water conservation mechanisms.
• Monitor the quality of the domestic effluent and the discharge from the site to ascertain conformity to the standards stipulated under
Environmental Management and
Coordination (Water Quality) Regulations, 2006.
• Apply for and obtain an Effluent Discharge
License (EDL) from NEMA.
• Comply with the provisions of the
Environmental Management and
Coordination (Water Quality) Regulations, 2006.
Traffic management and site accessibility
• The trucks carrying wastes will be advised to access the site at intervals to reduce traffic congestion along the access road.
• The operations of the site will be on contractual basis hence reducing the potential impacts of heavy traffic.
• Develop and implement a traffic management plan.
• Control entry and exit of vehicles to and from the facility.
• Comply with the Traffic Act, 2016.
Heritage, cultural and historical values
• Prevention and restoration of cultural and heritage values of the community in the proposed project site.
• The site for the proposed project does not possess any cultural and heritage sites.
• The project should be in harmony with the cultural and social aspect of the community.
Prevalence of infectious and communicable diseases
• Education and sensitization of workers and the local communities on STIs including provision of condoms to the project team and the public.
• The contractor has to institute HIV/AIDS awareness and prevention campaign amongst workers for the duration of the contract e.g.
erect and maintain HIV/AIDS information posters at strategic locations within the site.
6th October, 2023 THE KENYA GAZETTE
• The proponent has to ensure that staff are made aware of the risks of contracting or spreading sexually transmitted diseases.
Drug and substance abuse
• The project contractor and the proponent should create awareness among the site workers on the impacts of drug abuse.
• The project contractor should discourage the use and abuse of drugs among the workers and the community members.
• The contractor should formulate a policy that discourages entrance with drugs on site during construction and operation phases.
Air pollution • Ensure machinery and equipment used are in good condition to reduce emissions.
• Strict adherence to Environmental
Management and Co-ordination (Air Quality)
Regulations, 2014.
• Sprinkle water to dry soils in excavated areas and earth roads to suppress dust.
Noise and excessive vibrations
• Provision of appropriate Personnel Protective
Equipment (PPE) to protect the employees from noise and vibrations effects.
• Construct mainly during the day.
• Consider labour based construction methodologies.
• Sensitize truck drivers to avoid unnecessary hooting and running of vehicle engines.
• Ensure compliance with provisions of
Environmental Management and Co- ordination (Noise and Excessive Vibrations
Pollution Control) Regulations, 2009.
Air pollution • Minimizing the number of motorized vehicles on use.
• Rehabilitate disturbed areas.
• Wet all active construction areas as and when necessary to reduce dust.
• Dry materials should be kept dump or covered at all time.
• Install gadgets to intercept the particulate matter as well as controlling gaseous emissions.
Occupational health and safety hazards at workplace
• Provide all employees with appropriate and adequate Personal Protective Equipment and
Clothing (PPE and C). These include working safety boots, overalls, helmets, goggles, earmuffs, respirators/masks and gloves.
• Warning and safety signage will be placed at the strategic areas within the site.
• Provide employees with correct equipment tools and for the jobs assigned and train on their use.
• Provide first aid services and emergency services kit at the project site. This should be fully equipped at all times and should be managed by qualified person.
• Register the site as a workplace with the
Directorate of Occupational Safety and Health
Services.
• Ensure moving parts of machines and sharp surfaces are securely protected while on site.
• Develop and implement a safety and health policy, and emergency response plan for the site.
• Provide and keep an accident/incident register occurring on the site including near misses and actions taken to prevent future occurrences.
• Conduct annual occupational safety and health audits.
• Comply with the provisions of the
Occupational Safety and Health Act, 2007.
Fire risks and hazards
• Provide firefighting equipment within the site/facility.
• Firefighting equipment should be serviced quarterly by fire service providers.
• Develop and implement a fire and emergency response plan.
• Train employees on the use of fire-fighting equipment.
• Develop and implement a fire and emergency response plan.
• Provide fire safety and warning signage within the facility.
• Enforce a ‘no smoking’ rule within the facility.
• Conduct fire drills and fire safety audits annually.
The full report of the proposed project is available for inspection during working hours at:
(a) Principal Secretary, Ministry of Environment, Climate
Change and Forestry, NHIF Building, 12th Floor, Ragati
Road, Upper Hill, P.O. Box 30126–00100, Nairobi.
(b) Director-General, NEMA, Popo Road, off Mombasa Road, P.O. Box 67839–00200, Nairobi.
(c) County Director of Environment, Kilifi County.
A copy of EIA report can be downloaded at www.nema.go.ke
The National Environment Management Authority invites members of the public to submit oral or written comments within thirty (30) days from the date of publication of this notice to the
Director-General, NEMA, to assist the Authority in the decision making process regarding this project.
Comments can also be e-mailed to dgnema@nema.go.ke
MAMO B. MAMO, Director-General, MR/5920533 National Environment Management Authority.
Dated the 6th October, 2023.
MAMO B. MAMO,
Director-General, National Environment Management Authority.
Extracted Entities (1)
previous_gazette_ref
13561
Details
- Act / Legislation
- THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
- Reference
- No. 8 of 1999
- Signed By
- MAMO B. MAMO
- Title
- Director-General, National Environment Management Authority
- Ministry
- Ministry of Environment, Climate
- Date Signed
- 6th October 2023
- Page
- 44
- Extraction Method
- regex
Source Gazette
Vol. CXXV No. 221
Published 16th May 2023