GAZETTE NOTICE NO. 122
PURSUANT to by-law 6 of the Methods of Charge (K.P.L.C.) By-laws. 1996, notice is given that all prices for electrical energy specified in part II of the said by-laws will be liable to a fuel cost adjustment of plus 7.5 cents per kWh. for all meter readings taken in.
INFORMATION REQUIRED BY By-Law 6 (b) is:
x
Fuel price in Variation from
Power Station Sh./Kg. (Ci) in November, 1997 prices Units in kWh.
December, 1997 Sh./Kg. increase/ (Gi) |
(Decrease)
Kipevu Thermal... .. .. .. a .. 11.32 (1.16) 20.293.200
Kipevu Gas Turbine (JB) . . .. .. .. 19.32 0.27 5,043,000
Kipevu Gas Turbine (IPP) a .. 13.14 (1.23) 5.468.153
Nairobi South Gas Turbine .. . .. .. _ —_ —
Nairobi South Diesel (IPP) .. .. . 17.92 (2.75) 9.707.800
Ruiru Diesel .. .. .. a bee — — —
Garissa Diesel . . . . . - 20.88 (6.05) 493.630
Lamu Diesel .: .. .. .. +. 34.34 9.67 323.080
Lodwar Diesel . .- .. .. 26.71 — : 135.114
Mandera Diesel .. .. .. .. . . 72.29 37.95 46,600
Marsabit Diesel... .: cee .. 20.97 (1.74) 317.465
Wajir Diesel . . .. te ae .. .. 46.33 - 16,92 47.410
Moyale Diesel . - . . . . 43.98 12.5 117,986
Total units generated and purchased including Hydro (G) = 366,613,785 kWh.
J. N. KIMANI,.
Company Secretary.
Extracted Entities (1)
previous_gazette_ref
122
Details
- Signed By
- J. N. KIMANI
- Page
- 18
- Extraction Method
- ocr-fallback
Source Gazette
Vol. C No. 4
Published 1st January 1998