GAZETTE NOTICE NO. 4497
PURSUANT to clause 5 of Part I of the Schedule of Tariffs 2013, notice is given that all prices for electrical energy specified in Part Il -
(A) of the said Schedule will be liable to a Water Resource Management Authority (WRMA) levy of Plus 1.49 Kenya cents per kWh for all meter readings to be taken in May, 2017.
Information used to calculate the WRMA Levy:
Approved WRMA levy for energy purchased from hydropower plants of capacity equal to or above 1MW = 5 Kenya cents per KWh.
Hydropower Plant Units Purchased in April, 2017 (KWh.)
Gitaru 53,407,000
Kamburu 24,794,000
Kiambere 72,189,000
Kindaruma 10,869,890
Masinga _ 4,173,000
Tana 1,790,857
Wanjii 1,920,528
| Sagana 157,851
Ndula =
Turkwel 25,523,040
Gogo 518,172
Sondu Miriu 11,022,000
Sangoro 3,401,710
Total units purchased from hydropower plants with capacity equal to or above IMW = 209,766,949 kWh.
Total units generated and purchased including hydros excluding exports in April, 2017 = 837 927,656 kWh. :
; ROBERT PAVEL OIMEKE, MR/2484378
Ag. Director-General.
Extracted Entities (1)
previous_gazette_ref
4497
Details
- Date Signed
- 12th May 2017
- Page
- 23
- Extraction Method
- ocr-fallback
Source Gazette
Vol. CXIX No. 61
Published 12th May 2017