Back
OTHER 79% confidence via ocr-fallback

GAZETTE NOTICE NO. 10101

PURSUANT to clause 5 of Part Il of the Schedule of Tariffs 2013, notice is given that all prices for electrical energy specified in Part Il - (A) of the said Schedule will be liable to a Water Resource Management Authority (WRMA) levy of plus 1.63 Kenya cents per kWh for all meter readings to be taken in October, 2017. 13th October, 2017 Information used to calculate the WRMA Levy: Approved WRMA levy for energy purchased from hydropower plants of capacity equal to or above 1MW = 5 Kenya cents per KWh. Hydropower Plant Units Purchased in September, 2017 (KWh. Gitaru 42,708,000 Kamburu 20,842,000 Kiambere 52,166,000 Kindaruma 10,602,300 Masinga 5,892,000 Tana 5,492,781 Wanjii 2,422,925 | Sagana 335,940 Ndula : Turkwel } 37,409,690 Gogo 974,057 Sondu Miriu 42,933,000 | Sangoro 14,389,230 | Regen-Terem 2,179,829 Chania 6,874 Gura 700,015 Total units purchased from hydropower plants with capacity equal to or above 1MW 239,054,641 kWh Total units generated and purchased including hydros excluding exports in September, 2017 = 872,376,109 kWh. ROBERT PAVEL OIMEKE, MR/2484378 Ag. Director-General.

Extracted Entities (1)

previous_gazette_ref

10101

Details

Signed By
ROBERT PAVEL OIMEKE
Title
Ag. Director-General
Date Signed
13th October 2017
Page
30
Extraction Method
ocr-fallback