GAZETTE NOTICE NO. 159
PURSUANT to Clause 5 of Part III of the Schedule of tariffs 201 8, notice is given that all prices for electrical energy specified in Part II -(A) of the said Schedule will be liable to a Water Resource Management Authority (WRMA) levy of plus 1.74 cents per kWh for all meter readings taken in
January 2022.
Information used to calculate the WRMA levy:
Approved WRMA levy for energy purchased from hydropower plants of capacity equal to or above IMW_ =5,00 Kenya cents per KWh
Hydropower Plant Units Purchased in December, 2021 (kWh)
Gitaru 75,978,530
Kamburu 38,541,000
Kiambere 95,341,460
Kindaruma 18,054,170
Masinga 13,056,960
Tana 13,549,249
Wanjii 1,508,908
Sagana 993,527
Turkwel 49,446,500
| Gogo =
Sondu Miriu 20,266,000
Sangoro 6,419,230
Regen-Terem 1,176,958
Chania 58,168
Gura 2,873,081
Metumi 1,010,300
Total units purchased from hydropower plants with capacity equal to or above [MW = 338,274,041 kWh
Total units generated and purchased (G) excluding exports in December, 2021 = 1,040,948,722 kWh
DANIEL K. BARGORIA, MR/3253365 Director-General,
Extracted Entities (1)
previous_gazette_ref
159
Details
- Signed By
- DANIEL K. BARGORIA
- Title
- Director-General,
- Page
- 20
- Extraction Method
- ocr-fallback
Source Gazette
Vol. CXXIV No. 6
Published 1st January 2022