Back
REGULATION
100% confidence
via ocr-fallback
GAZETTE NOTICE NO. 553
GAZETTE NOTICE NO. 553
THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
(No. 8 of 1999)
REGULATION
PURSUANT to regulation 21 of the Environmental Management and Co-ordination (Impact Assessment and Audit) Regulations, 2003, the National Environment Management Authority (NEMA) has received an Environmental Impact Assessment Study Report for the above proposed project.
The proponent, Tsavo Step Up Apartments Limited, proposes to develop residential apartments comprising of a single 12-storey block with a total of 296 No apartment units (156No. studio apartments, 82No. superior studio apartments, 58No. convertible apartments), 2No.
shops, basement parking, guard house, protected dustbin cubicles, driveways, and other associated facilities and amenities
The following are the anticipated impacts and proposed mitigation measures:
Impacts Proposed mitigation Measures
Soil disturbance * Control earthworks and compact loose soils.
* Ensure the geo-technical survey is conducted before commencement of any excavations.
° Install drainage structures properly.
* Landscaping on project completion.
* Control and manage excavation activities.
* Control activities especially during rainy conditions.
¢ Provide soil erosion control and conservation necessary.
structures/means — where
Impacts Proposed mitigation Measures Impacts Proposed mitigation Measures
¢ Ensure standard appropriate practices on * Provide oil interceptors along the drains the provided gardens. leading from car park and potentially oil risk areas.
Change in ¢ Proper installation of drainage structures hydrology commensurate with the new development. Water resources * Management of water usage. Avoid
. unnecessary wastage
* Install cascades to break the impact of water flowing in the drains. * Recycling of water at the construction
. . phase where possible. Make use of roof
* Ensure efficiency of drainage structures catchments to provide water i.c for general through proper design and maintenance. purposes.
* Provide gratings to the drainage channels. Public health, * Train staff/workers on occupational health e occupational hand safety.
Liquid waste
Increased energy use
Noise pollution
Solid waste
Oil pollution
Ensure sanitary facilities are kept clean always through regular cleaning.
Ensure regular maintenance of foul water drainage works at the premises to prevent clogging and fore-stall breakdowns.
Frequent monitoring of the internal drainage system.
Solar energy will be used as an alternative source of energy.
Use energy efficient appliances such as
LED bulbs for lighting.
Switch off electrical appliances when not in use.
Regular maintenance of all the electrical components.
Regular inspection and maintenance of the solar panels.
Erect suitable barriers to control noise.
Sensitize drivers of construction machinery on effects of noise.
Maintain plant equipment (if present).
Construction activities to be restricted to daytime.
Workers in the vicinity of or involved in high-level noise to wear safety and protective gear, Work to be confined between 8 a.m. and 5 p.m. weekdays and 8 a.m. to | p.m. on weekends. There should be no construction works on Sundays.
Use of an _ integrated solid waste management system through a hierarchy of options: source reduction, recycling, composting and reuse, will facilitate waste handling.
Ensure segregation of waste (organic and inorganic) at source.
Provide clearly marked dustbins cubicles to serve the specified use.
Ensure that wastes generated are efficiently managed through recycling, reuse and proper disposal procedures.
Engage services of a registered NEMA waste handler to dispose the waste regularly at approved disposal points.
Proper storage, handling and disposal of new oil and used oil wastes as per waste regulations.
Maintain plant and equipment to avoid leaks.
Maintenance of construction vehicles should be carried out in the contractors yard (off the site).
health and safety.
Fire .
Water quality and ° waste management
Security °
Provide full protective gear and workmen’s compensation cover in addition to the right tools and operational instructions and manuals during construction.
Adopt sound housekeeping practices.
Sensitize residents on environmental management.
Design of sewerage system should be as provided in the plans.
Post strategically the Occupational Safety and Health Act, 2007 Abstract and provide material safety data sheets.
Post clear warning signs e.g. “No unauthorized use of machines”, ensure there are guards on moving parts e.t.c
Provide fully equipped First Aid kits and train staff on its use. Ensure adherence with the legal requirements -OSH Act, 2007.
Install firefighting equipment as provided elsewhere in the report. Conduct training on firefighting, evacuation and emergency response.
Sensitize the residents on fire risks i.e.
conduct regular fire drills.
Adapt effective emergency response plan.
Maintain service firefighting machinery regularly.
Provide emergency numbers at strategic points.
Follow NEMA regulations.
Provide security guards and facilities during the entire project cycle.
The full report of the proposed project is available for inspection during working hours at:
(a) Principal Secretary, Ministry of Environment and Forestry, NHIF Building, 12th Floor, Ragati Road, Upper Hill, P.O.
Box 30126-00100, Nairobi.
(b) Director-General, NEMA, Popo Road, off Mombasa Road, P.O. Box 67839-00200, Nairobi.
(c) County Director of Environment, Nairobi City County.
A copy of the report can be downloaded at www.nema.go.ke
The National
Environment
Management Authority invites members of the public to submit oral or written comments within thirty (30) days from the date of publication of this notice to the
Director-General, NEMA, to assist the Authority in the decision making process regarding this project.
Comments can also be emailed to dgnema@nema.go.ke
MR/3274260
MAMO B. MAMO, Director-General, National Environment Management Authority.
21st January, 2022
Dated the 21st January, 2022.
MAMO B. MAMO,
Director-General, National Environment Management Authority.
Extracted Entities (1)
previous_gazette_ref
553
Details
- Act / Legislation
- THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
- Reference
- No. 8 of 1999
- Signed By
- MAMO B. MAMO
- Title
- Director-General, National Environment Management Authority
- Ministry
- Ministry of Environment And Forestry
- Date Signed
- 21st January 2022
- Page
- 27
- Extraction Method
- ocr-fallback
Source Gazette
Vol. CXXIV No. 15
Published 1st January 2022