Back
OTHER 82% confidence via regex

GAZETTE NOTICE NO. 13173

PURSUANT to Clause 2 of Part III of the Schedule of Tariffs 2023, notice is given that all prices for Electrical Energy specified in Part II of the said Schedule will be liable to a Foreign Exchange Fluctuation Adjustment of Plus 117.77 Cents per kWh for all meter readings taken in August 2026. Information used to calculate the forex adjustment Parameter KenGen (FZ) KPLC (HZ) IPPs (IPPZ) TOTAL (FZ+HZ+IPPZ) Exchange Gain/(Loss) 145,261,895.12 168,870,919.52 1,039,198,441.45 1,353,331,256.08 Total units generated and purchased (G) excluding exports in July 2026 = 1,376,204,783kWh JOSEPH OKETCH, MR/8081508 Ag. Director General.

Extracted Entities (1)

previous_gazette_ref

13173

Details

Signed By
JOSEPH OKETCH
Title
Ag. Director General
Page
43
Extraction Method
regex