Back
AUTHORIZATION
100% confidence
via ocr-fallback
GAZETTE NOTICE NO. 807
GAZETTE NOTICE NO. 807
THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
(No. 8 of 1999)
AUTHORIZATION
PURSUANT to regulation 21 of the Environmental Management and Co-ordination (Impact Assessment and Audit) Regulations, 2003, the National Environment Management Authority (NEMA) has received an Environmental Impact Assessment Study Report for the above proposed project.
The Proponent (Kenya Electricity Transmission Company —
KETRACO) is proposing to set up a 400 Kv Double Circuit line traversing five Counties of Lamu, Tana River, Garisa, Kitui and
Machakos.
The following are the anticipated impacts and proposed mitigation measures:
Impacts Mitigation Measures
Clearing of vegetation and loss of biodiversity
Compensate by planting of trees on roadsides and avenues and in other public places such as schools.
e Undertake selective clearance to target only tall trees and shrubs and avoid
Hazard to fauna including e bird strikes
Noise and dust pollution ¢
Impeded drainage leading ¢ to soil erosion into water resources clearance of short annual herbs.
Adhere strictly to prescribed dimensions in clearing of vegetation.
Monitor the biodiversity index over time in the project areas.
Desist from any form of hunting of game for trophies or food.
Cart away any waste.
Mark some of the wires to make them more.
Erect perching platforms on top of pylons.
Monitor number of electrocuted birds and those lost to collision and compare with published data to made decision on effectiveness of measures taken.
Obtain necessary authorization if blasting is to take place.
Provide appropriate PPEs to workers
(dust masks and noise mufflers).
Organize deliveries to avoid constant noise irritation and train workers on good practices of minimizing noise generation such as: turning off idle machines, avoiding hooting, gentle off- loading, use of properly maintained machines, and installation of mufflers on machinery.
Next to settlements, restrict construction to daytime.
Exercise discipline in areas next to schools and clinic .
Deliver construction materials early in the morning when it is less windy and the materials are damp with dew.
Use low speeds while delivering materials.
In case of excessive dust, sprinkle materials and working areas with water.
Supervise workers to ensure they work away from drifting dust.
Plan construction to coincide with dry weather.
Minimize use of heavy equipment by favouring human labour.
Avoid dragging of construction material on the ground to deter creating of soil erosion channels.
In heavily compacted areas, such as lorry tracks, offloading sites and assembling points, disturb the soil, then mulch it to encourage quick plant regeneration.
Cut back the vegetation rather than outright clearance such that the soil is held by the stumps.
Do not disturb river banks whatsoever.
Formatted: Indent: Left: 0 cm, Hanging:
0.42 cm, Bulleted + Level: 1 + Aligned at: 0.63 cm + Indent at: 1.27 cm a
Formatted: Indent: Left: 0 cm, Hanging:
0.42 cm, Bulleted + Level: 1 + Aligned at: 0.63 cm + Indent at: 1.27 cm
Formatted: Indent: Left: 0 cm, Hanging:
0.42 cm, Bulleted + Level: 1 + Aligned at: 0.63 cm + Indent at: 1.27 cm
Formatted: Indent: Left: 0 cm, Hanging:
0.42 cm, Bulleted + Level: 1 + Aligned at: 0.63 cm + Indent at: 1.27 cm
13th February, 2015
Wetlands
Solid waste generation
Hazardous material and fuel spills
Electric and magnetic fields (EMF)
Visual intrusion
Land acquisition and disruption of social economic setup
Interference with cultural setup
Interference with cultural heritage
Use properly serviced equipment and take particular caution when working next to a river.
Limit soil erosion section).
(see preceding
Sensitize workers not to dump any waste into rivers.
Monitor soil erosion levels and compare with published data for need to undertake additional corrective measures.
Design OHTL route to cross wetland perpendicularly to minimize impact.
Adhere strictly to prescribed dimensions in clearing of vegetation.
Clean construction equipment after working in areas infested by invasive species.
Place markers on the top (shield) wire to make the lines more visible to birds if the collision potential is high.
Monitor the biodiversity index over time in the project areas.
Proper quantification of requirements to avoid redundancies of ordered materials
Use of high quality, long lasting and well maintained electrical equipment materials.
Segregation of solid wastes to encourage recycling / reuse at substations.
Monitor amount of waste generated per given period with a view of continuously reducing the waste generated.
Spill prevention.
Emergency response.
Clean up and_ contaminated soil remediation.
Installation of transmission lines to avoid residential properties or other locations intended for highly frequent human occupancy, (e.g. schools or hospitals).
Taller double circuit poles resulting in less of a magnetic field at ground level.
Create public awareness _ before construction of pylons.
Where feasible use the hilly terrain to locate pylons in a way that will mask the visual intrusion.
Implement a resettlement assessment plan.
Civic education, public awareness, and sensitization on alternatives targeting where applicable both spouses.
Issuance of adequate notices.
Expedited compensation.
Raise public awareness on the values of culture.
Support social activities that promote the local cultures through the CSR avenues.
Determine and protect sites through a professional study as stipulated in The
National Museums and Heritage Act of
2006, section 5.
Occupational safety and health concerns, including electrocution
.
Adhere to stipulations of the OSHA «
2007 during construction and operation.
Use well trained (including in first aid) properly supervised and adequately insured workers during construction.
Ensure use of PPEs during construction.
Ensure use of properly maintained equipment.
Use construction materials that meet stipulated standards.
Ensure all the construction is done to specification and it is duly certified.
a
Take special caution on building of bases to ensure the pylons are properly anchored on the ground by approving each base individually by competent structural engineer .
Create public awareness on dangers of
OHTL.
Fix appropriate danger signage on each pylon and deter scaling of the pylon by use of razor /barbed wire to ring-fence the pylon about 10 feet from the ground.
<
Supervise the way-leave at least once a year to maintain the way-leave devoid of any high vegetation.
Ensure workers adhere strictly to provided safety precautions when undertaking any repairs and maintenance activities.
Undertake drills on emergency preparedness in case of accidents.
Monitor cases of accidents and near
+
Formatted: Indent: Left: 0 cm, Hanging:
0.42 cm, Bulleted + Level: 1 + Aligned at: 0.63 cm + Indent at: 1.27 cm
Formatted: Indent: Left: 0 cm, Hanging:
0.42 cm, Bulleted + Level: 1 + Aligned at: 0.63 cm + Indent at: 1.27 cm
Formatted: Indent: Left: 0 cm, Hanging:
0.42 cm, Bulleted + Level: 1 + Aligned at: 0.63 cm + Indent at: 1.27 cm misses. Formatted: Indent: Left: 0 cm, Hanging:
: + 21+ Ali : 0.
Risk to low flying planes ¢ Mark the wires to international standards o4 2 Bleed steve 1+ Aligned at: 0.63 to warn low flying planes. —s _—
. . ~) Formatted: Indent: Left: 0 cm, Hanging:
Increased cases of e Engage the public to report vandalism . on .
vandalism through use of manned hotlines. 0.42 cm, Bulleted + Level: 1 + Aligned at: 0.63 cm + Indent at: 1.27 cm e Rapid response to deter any reported N ~ cases of impeding vandalism. Formatted: Indent: Left: 0 cm, Hanging:
0.42 cm, Bulleted + Level: 1 + Aligned at: 0.63 e Consider use of advanced technology to cm + Indent at: 1.27 cm deter vandalism by product modification \ or enhanced detection. Formatted: Indent: Left: 0 cm, Hanging:
0.42 cm, Bulleted + Level: 1 + Aligned at: 0.63 e Lobby the Government to elevate the cm + Indent at: 1.27 cm crime of vandalism of electrical ss installation to the level of economic ~| Formatted: Indent: Left: 0 cm, Hanging:
sabotage. 0.42 cm, Bulleted + Level: 1 + Aligned at: 0.63 e Monitor number of attempted and Lem + Indent at:_1.27 cm accomplished vandalism.
* Formatted: Indent: Left: 0 cm, Hanging:
Fire outbreaks e Maintain the way-leaves free of fire fuel “~\ 0.42 cm, Bulleted + Level: 1 + Aligned at: 0.63 e Partner with other agencies such as \ cm + Indent at: 1.27 cm we and KFS in fire surveillance and ) Formatted: Indent: Left: 0 cm, Hanging:
ire fighting. 0.42 cm, Bulleted + Level: 1 + Aligned at: 0.63 e Undertake regular fire drills. cm + Indent at: 1.27 cm
¢ Monitor number of fire outbreaks.
The full report of the proposed project is available for inspection Formatted: Indent: Left: 0 cm, Hanging:
during working hours at: 0.42 cm, Bulleted + Level: 1 + Aligned at: 0.63 cm + Indent at: 1.27 cm
(a) Director-General, NEMA, Popo Road, off Mombasa Road, P.O.
Box 67839-00200, Nairobi.
wo. oo: : . * Formatted: Indent: Left: 0 cm, Hanging:
(b) Principal Secretary, Ministry of Environment and Mineral . on .
Resources, NHIF Building, Community, P.O. Box 30521, 0.42 cm, Bulleted + Level: 1 + Aligned at: 0.63
Nairobi. Lem + Indent at: 1.27 cm
(c) County Director of Environment, Lamu County.
(d) County Director of Environment, Tana River County.
(e) County Director of Environment, Kitui County.
(f) County Director of Environment, Machakos County.
(g) County Director of Environment, Garissa County.
(h) County Director of Environment, Nairobi County.
The National Environment Management Authority invites members of the public to submit oral or written comments within thirty (30) days from the date of publication of this notice to the Director-General, NEMA, to assist the Authority in the decision making process of the plan.
Z. O. OUMA, for Director-General, MR/6742401 National Environment Management Authority.
GAZETTE NOTICE NO
Dated the 13th February, 2015.
Z. O. OUMA,
for Director-General, National Environment Management Authority.
Extracted Entities (1)
previous_gazette_ref
807
Details
- Act / Legislation
- THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
- Reference
- No. 8 of 1999
- Section
- section 5
- Signed By
- Z. O. OUMA
- Title
- for Director-General, National Environment Management Authority
- Ministry
- Ministry of Environment And Mineral
- Date Signed
- 13th February 2015
- Page
- 24
- Extraction Method
- ocr-fallback
Source Gazette
Vol. CXVII No. 14
Published 13th February 2015