Back
REGULATION 100% confidence via ocr-fallback

GAZETTE NOTICE NO. 1331

GAZETTE NOTICE NO. 1331

THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT

(No. 8 of 1999)

REGULATION


PURSUANT to regulation 21 of the Environmental Management and Coordination (Impact Assessment and Audit) Regulations, 2003, the National Environment Management Authority (NEMA) has received an Environmental Impact Assessment Study Report for the above proposed project. The Proponent (Safaricom Staff Pension Scheme) is proposing to put up a Mixed Use Development on a 25.5 acre parcel of land, LR No. 337/974 located in Mavoko, Machakos County along Mombasa Road. The proposed development will consist of a retail centre (mall), 113 units of 4 bedroom town houses, 157 units of 3 bedroom town houses, community centre, kindergarten, recreation facilities, 15m wide tree lined boulevard, 9m wide road, 3m wide jogging track, waste water treatment plant, main entrance/ exit, emergency exits, green court and parking areas. The following are the anticipated impacts and proposed mitigation measures: Environmental and Social impacts Mitigation measure Loss of biodiversity . WRMA recommendation. e -Clearance of vegetation should be done in necessary areas only. e —_-Carry out environmental compensation where harm cannot be avoided by Formatted: Indent: Left: 0 cm, Hanging: 0.42 cm, Bulleted + Level: 1 + Aligned at: 0.63 cm + Tab after: 1.27 cm + Indent at: 1.27 cm, Tab stops: Not at 1.27 cm Formatted: Indent: Left: 0 cm, Hanging: 0.42 cm, Bulleted + Level: 1 + Aligned at: 0.63 cm + Tab after: 1.27 cm + Indent at: 1.27 cm, Tab stops: Not at 1.27 cm -Maintain a riparian buffer zone as pers Formatted: Indent: Left: 0 cm, Hanging: 0.54 cm, Bulleted + Level: 1 + Aligned at: 0.63 cm + Indent at: 1.27 cm ~{ Formatted: Indent: Left: 0 cm, Hanging: 0.42 cm, Bulleted + Level: 1 + Aligned at: 0.63 cm + Tab after: 1.27 cm + Indent at: 1.27 cm, Tab stops: Not at 1.27 cm 27th February, 2015 Soil Degradation . Air pollution . Increased water demands ¢ Effluent management . River degradation . River flooding . planting of indigenous plants. -Use of gravel bags to trap sediment -Rocked construction entrance and exit to keep sediment from being tracked onto adjacent roads and keep vehicles off bare soils. -Stock piles to be covered with tarpaulin. -Excavated soil to be used for back filling. -Top soil to be used for landscaping. -Limit the use of heavy machinery at the site & control earth works. -Spray water on exposed areas during dry weather to suppress dust. -Cover loads of friable materials during transportation. -Buildings under construction to be covered with adequate screens to contain dust. -Stock piles to be covered with tarpaulins. -Control speed of construction vehicles and switch off machines when not in use. service and maintain and mobile plants and -Regularly vehicles machinery. -Provide PPE e.g. nose masks to workers. -Installation of flush toilets with low volume cisterns and high pressure. -Waste water recycling and rain water harvesting. -Provision of portable toilets for the workers. -Routine checkups and monitoring of the WWTP to avoid leakages and blockages. -Proper construction of the WWTP to meet the standards required by Mavoko Municipal Council. -Construction of separate storm water and waste water drains. -Treated effluent to be reused as non potable water for flushing toilets, watering lawns and cleaning purposes. -Waste water to be treated to the standards set by NEMA (Water quality regulations, 2006) and effluent analysis to be conducted quarterly. -Maintain a riparian buffer zone along the River as per WRMA recommendations. -No development activity shall be undertaken within the full width of the river or within the riparian reserve as per Water Quality Regulations 2006- Routine check-ups and monitoring of the WWTP to avoid leakage and blockage. Plant environmentally friendly trees on the riparian reserve to increase interception and storage while reducing surface run off. Liaise with WRMA weigh the option of constructing a levee which can confine the flow. Excess noise and vibrations Traffic snarl ups Increase in Solid Wastes Occupational Health and Safety - Liaise with WRMA to decommission the weir that is obstructing the smooth, running of the river water on the site frontage as it does not serve any purpose. -Workers working with machinery,< vehicles and instruments that emit high levels of noise should be provided with ear plugs and ear muffs. -Proper servicing of machinery & equipment(oiling, greasing etc). -Installation of portable barriers to shield compressors and other small stationary equipment where necessary. -Construction activities to be carried out between 8:00 a.m. to 5.00 p.m. + -Monitor noise levels as per NEMA guidelines. -Proponent to engage KeNHA in< developing access to the development which will be compatible with the upcoming dual carriageway from Athi river interchange to Machakos junction. -A traffic marshal to be stationed along the entry point within the project boundary to control vehicles during transportation of materials. -Planned deliveries to make sure they do not coincide with heavy traffic. -Provision of separate traffic routes for pedestrians and vehicles during operation phase. < -Security checks to be conducted inside the compound NOT at the entrance. -Provision of designated entry and exit points. < -Limit quantity by appropriate budgets for purchase of raw* materials to reduce wastage through exposure to weather elements. -Provision of a waste transfer station within the development. -Segregation of waste at source through provision of separate bins. -Contract a duly licensed waste handler to transport waste. -Sludge from the WWTP to be incinerated by a licensed incineration company. -Personnel to wear complete PPE. < -Provision of fire fighting equipment. -Put in place an emergency response’ plan. -Only qualified personnel to operate the machinery. -Designate a Health & Safety officer to be in-charge of enforcing _ site compliance with OSH rules & regulations. -Provision of adequately stocked first aid kit and at least one trained first< aider on site. -Display the contact numbers of the persons responsible for handling emergencies on the site. -Contractor should have workmen’s compensation cover which should developing<_ - Formatted: Indent: Left: 0 cm, Hanging: cm + Indent at: 1.27 cm 0.54 cm, Bulleted + Level: 1 + Aligned at: 0.63 cm + Indent at: 1.27 cm Formatted: Indent: Left: 0 cm, Hanging: 0.54 cm, Bulleted + Level: 1 + Aligned at: 0.63 cm + Indent at: 1.27 cm Formatted: Indent: Left: 0 cm, Hanging: 0.54 cm, Bulleted + Level: 1 + Aligned at: 0.63 cm + Indent at: 1.27 cm Formatted: Indent: Left: 0 cm, Hanging: 0.54 cm, Bulleted + Level: 1 + Aligned at: 0.63 cm + Indent at: 1.27 cm Formatted: Indent: Left: 0 cm, Hanging: 0.54 cm, Bulleted + Level: 1 + Aligned at: 0.63 cm + Indent at: 1.27 cm Formatted: Indent: Left: 0 cm, Hanging: 0.54 cm, Bulleted + Level: 1 + Aligned at: 0.63 cm + Indent at: 1.27 cm Formatted: Indent: Left: 0 cm, Hanging: 0.54 cm, Bulleted + Level: 1 + Aligned at: 0.63 cm + Indent at: 1.27 cm af Formatted: Indent: Left: 0 cm, Hanging: 0.54 cm, Bulleted + Level: 1 + Aligned at: 0.63 cm + Indent at: 1.27 cm Formatted: Indent: Left: 0 cm, Hanging: 0.54 cm, Bulleted + Level: 1 + Aligned at: 0.63 cm + Indent at: 1.27 cm ~~{ Formatted: Indent: Left: 0 cm, Hanging: 0.54 cm, Bulleted + Level: 1 + Aligned at: 0.63 cm + Indent at: 1.27 cm Formatted: Indent: Left: 0 cm, Hanging: 0.54 cm, Bulleted + Level: 1 + Aligned at: 0.63 comply with workmen’s compensation Act. Population Increase e = - Planning of the development in such a way that there is adequate social and other infrastructure to meet needs of the tenants and shoppers. Sanitation e -Provision of sufficient sanitary conveniences: hand washing stations, mobile toilets at work site. e -Provision of clean water to the workforce. HIV/AIDS e -Erection of billboards to sensitize locals on the need to practice safe sex to help in the fight against HIV/AIDS. e -Conduct awareness campaigns on HIV/AIDS among the workers and the locals. This can be undertaken by the various NGOs and government agencies in the county. e —_-Provision of condoms to the workers. (a) Director-General, NEMA, Popo Road, off Mombasa Road, P.O. Box 67839-00200, Nairobi. (b) Principal Secretary, Ministry of Environment and Mineral Resources, NHIF Building, Community, P.O. Box 30521, Nairobi. (c) County Director of Environment, Machakos County. The National Environment Management Authority invites members of the public to submit oral or written comments within thirty (30) days from the date of publication of this notice to the Director-General, NEMA, to assist the Authority in the decision making process of the plan. Z. O. OUMA, for Director-General, MR/6992656 National Environment Management Authority.

Dated the 27th February, 2015.

Z. O. OUMA,

for Director-General, National Environment Management Authority.

Extracted Entities (1)

previous_gazette_ref

1331

Details

Act / Legislation
THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
Reference
No. 8 of 1999
Signed By
Z. O. OUMA
Title
for Director-General, National Environment Management Authority
Date Signed
27th February 2015
Page
56
Extraction Method
ocr-fallback