GAZETTE NOTICE NO. 4558

PURSUANT to clause 1 of Part III of the Schedule of Tariffs 2013, notice is given that all prices for electrical energy specified in Part II of the said Schedule will be liable to a fuel cost charge of plus cents 231 per kWh for all meter readings to be taken in June, 2016. Information used to calculate the fuel cost charge. 17th June, 2016 Power Station Fuel Price in May, 2016 KSh/Kg. (Ci) Fuel Displacement Chargel Fuel Charge May, 2016 KSh./kWh Variation from April, 2016 Prices Increasel(Decrease) Units in May, 2016 in kWh (Gi) Kipevu I Diesel Plant 29.05 (0.39) 7,726,000 Kipevu II Diesel Plant (Tsavo) 41.11 (14.89) 3,119,500 Kipevu III Diesel Plant 26.83 (1.67) 12,556,000 Embakasi GT 1 96.36 - Embakasi GT 2 96.36 - 580 Rabai Diesel-with steam turbine 27.62 1.71 48,427,000 Iberafrica Diesel 33.38 (3.20) 172,770 Iberafrica Diesel-additional Plant 33.34 (3.10) 9,849,750 Thika Power Diesel Plant 47.35 (0.23) 2,155,500 Thika Power Diesel Plant (with Steam unit) 47.35 (0.23) - Gulf Power - 84.47 (0.42) - Triumph Power ' 40.83 (0.86) 4,605,400 Mumias Sugar Company 3.42 (0.02) - Biojoule 7.05 (0.04) 88,326 Olkaria IV Steam Charge 2.01 (0.01) 66,156,457 Olkaria I Unit IV and V Steam Charge 2.01 (0.01) 104,816,085 Opower 4 40,604,320 UETCL Import (Non-Commercial) 6.91 (0.12) 4,111,825 UETCL Import (Commercial) 12.30 0.38 1,566,275 UETCL Export (Non-Commercial) 6.91 (0.12) (3,436,000) UETCL Export (Commercial) 6.60 (0.19) - Emergency Power (Muhoroni 3) 74.02 2.30 3,527,610 Garissa Diesel (KenGen) 85.32 2.47 . 305,480 Garissa Diesel (Agrekko, Kengen) 85.32 2.47 536,375 Garissa Diesel (Agrekko, GoK) 85.32 2.47 186,627 Lamu Diesel 79.84 - - Lodwar Diesel (thermal) 80.88 4.49 671,781 Mandera Diesel (thermal) 95.68 6.70 667,476 Marsabit Diesel (thermal) 87.56 6.82 383,007 Wajir Diesel 81.60 5.05 782,199 Moyale Diesel (thermal) 88.16 (8.80) 23,490 Mpeketoni - - Hola (thermal) 77.06 5.89 297,840 Merti (thermal) . 90.29 4.82 30,809 Habaswein (thermal) 74.81 ' 2.70 104,796 Elwak (thermal) 86.60 8.33 86,788 Baragoi 77.13 (10.22) 22,026 Mfangano (thermal) 83.25 (44.22) 34,984 Lokichogio 73.87 2.21 74,194 Takaba (thermal) 86.65 7.56 35,894 Eldas 82.53 (6.67) 19,010 Rhamu 89.11 4.87 35,352 Laisamis 83.96 - 10,397 North Horr 143.23 143.23 5,951 Lokori 91.78 (3.81) 5,628 Total units generated and purchased including hydros, excluding exports in. May, 2016 (G) = 839,274,747 kWh. JOSEPH NG'ANG'A, MR/8406357 Director-General. GAZE I I E NOTICE No. 4559 THE ENERGY REGULATORY COMMISSION SCHEDULE OF TARIFFS 2013 FOR ELECTRICITY TARIFFS, CHARGES, PRICES AND RATES FOREIGN EXCHANGE FLUCTUATION ADJUSTMENT PURSUANT to clause 2 of Part ill of the Schedule of Tariffs 2013, notice is given that all prices for electrical energy specified in Part II of the said Schedule will be liable to a foreign exchange fluctuation adjustment of plus 100 cents per kWh for all meter readings to be taken in June, 2016. Information used to calculate the adjustment: KenGen (FZ) KPLC (HZ) IPPs (IPPZ) Total (ZF+ZH+IPPZ) Exchange Gain/(Loss) 91,992,590.67 405,580,065.02 334,969,158.95 832,541,814.64 Total Units Generated and Purchased Excluding exports in May, 2016 (G) = 839,274,747 kWh JOSEPH NG'ANG'A, MR/8406357 Director-General.

Extracted Entities (1)

previous_gazette_ref

4558

Details

Signed By
JOSEPH NG'ANG'A
Title
Director-General
Date Signed
17th June 2016
Page
42
Extraction Method
regex